Title 49

Displaying title 49, up to date as of 9/20/2021. Title 49 was last amended 9/13/2021.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 49 Transportation Part / Section
Subtitle B Other Regulations Relating to Transportation 100 – 1699
Chapter I Pipeline and Hazardous Materials Safety Administration, Department of Transportation 100 – 199
Subchapter D Pipeline Safety 186 – 199
Part 195 Transportation of Hazardous Liquids by Pipeline 195.0 – 195.591
Subpart A General 195.0 – 195.15
Subpart B Annual, Accident, and Safety-Related Condition Reporting 195.48 – 195.65
Subpart C Design Requirements 195.100 – 195.134
Subpart D Construction 195.200 – 195.266
Subpart E Pressure Testing 195.300 – 195.310
§ 195.300 Scope.
§ 195.302 General requirements.
§ 195.303 Risk-based alternative to pressure testing older hazardous liquid and carbon dioxide pipelines.
§ 195.304 Test pressure.
§ 195.305 Testing of components.
§ 195.306 Test medium.
§ 195.307 Pressure testing aboveground breakout tanks.
§ 195.308 Testing of tie-ins.
§ 195.310 Records.
Subpart F Operation and Maintenance 195.400 – 195.454
Subpart G Qualification of Pipeline Personnel 195.501 – 195.509
§ 195.501 Scope.
§ 195.503 Definitions.
§ 195.505 Qualification program.
§ 195.507 Recordkeeping.
§ 195.509 General.
Subpart H Corrosion Control 195.551 – 195.591
Appendix A to Part 195
Delineation Between Federal and State Jurisdiction - Statement of Agency Policy and Interpretation
Appendix B to Part 195
Risk-Based Alternative to Pressure Testing Older Hazardous Liquid and Carbon Dioxide Pipelines
Appendix C to Part 195
Guidance for Implementation of an Integrity Management Program