The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Other

§ 63.1518 Applicability of general provisions.

The requirements of the general provisions in subpart A of this part that are applicable to the owner or operator subject to the requirements of this subpart are shown in appendix A to this subpart.

§ 63.1519 Implementation and enforcement.

(a) This subpart can be implemented and enforced by the U.S. EPA, or a delegated authority such as the applicable State, local, or Tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or Tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this regulation. Contact the applicable U.S. EPA Regional Office to find out if this subpart is delegated to a State, local, or Tribal agency.

(b) In delegating implementation and enforcement authority of this regulation to a State, local, or Tribal agency under subpart E of this part, the authorities contained in paragraph (c) of this section are retained by the Administrator of U.S. EPA and cannot be transferred to the State, local, or Tribal agency.

(c) The authorities that cannot be delegated to State, local, or Tribal agencies are as specified in paragraphs (c)(1) through (4) of this section.

(1) Approval of alternatives to the requirements in §§ 63.1500 through 63.1501 and 63.1505 through 63.1506.

(2) Approval of major alternatives to test methods for under § 63.7(e)(2)(ii) and (f), as defined in § 63.90, and as required in this subpart.

(3) Approval of major alternatives to monitoring under § 63.8(f), as defined in § 63.90, and as required in this subpart.

(4) Approval of major alternatives to recordkeeping and reporting under § 63.10(f), as defined in § 63.90, and as required in this subpart.

[68 FR 37359, June 23, 2003]

§ 63.1520 [Reserved]

Table 1 to Subpart RRR of Part 63—Emission Standards for New and Existing Affected Sources

[81 FR 38089, June 13, 2016]

Table 2 to Subpart RRR of Part 63—Summary of Operating Requirements for New and Existing Affected Sources and Emission Units

Affected source/emission unit Monitor type/operation/process Operating requirements
All affected sources and emission units with an add-on air pollution control device Emission capture and collection system Design and install in accordance with ACGIH Guidelines; e operate in accordance with OM&M plan (sweat furnaces may be operated according to 63.1506(c)(4)). b
All affected sources and emission units subject to production-based (lb/ton of feed) emission limits a Charge/feed weight or Production weight Operate a device that records the weight of each charge; Operate in accordance with OM&M plan. b
Group 1 furnace, group 2 furnace, in-line fluxer and scrap dryer/delacquering kiln/decoating kiln Labeling Identification, operating parameter ranges and operating requirements posted at affected sources and emission units; control device temperature and residence time requirements posted at scrap dryer/delacquering kiln/decoating kiln.
Aluminum scrap shredder with fabric filter Bag leak detector or Initiate corrective action within 1-hr of alarm and complete in accordance with OM&M plan b; operate such that alarm does not sound more than 5% of operating time in 6-month period.
COM or Initiate corrective action within 1-hr of a 6-minute average opacity reading of 5% or more and complete in accordance with OM&M plan. b
VE Initiate corrective action within 1-hr of any observed VE and complete in accordance with the OM&M plan. b
Thermal chip dryer with afterburner Afterburner operating temperature Maintain average temperature for each 3-hr period at or above average operating temperature during the performance test.
Afterburner operation Operate in accordance with OM&M plan. b
Feed material Operate using only unpainted aluminum chips.
Scrap dryer/delacquering kiln/decoating kiln with afterburner and lime-injected fabric filter Afterburner operating temperature Maintain average temperature for each 3-hr period at or above average operating temperature during the performance test.
Afterburner operation Operate in accordance with OM&M plan.b
Bag leak detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan; b operate such that alarm does not sound more than 5% of operating time in 6-month period.
COM Initiate corrective action within 1-hr of a 6-minute average opacity reading of 5% or more and complete in accordance with the OM&M plan.b
Fabric filter inlet temperature Maintain average fabric filter inlet temperature for each 3-hr period at or below average temperature during the performance test +14 °C (+25 °F).
Lime injection rate Maintain free-flowing lime in the feed hopper or silo at all times for continuous injection systems; maintain feeder setting at or above the level established during the performance test for continuous injection systems.
Sweat furnace with afterburner Afterburner operating temperature If a performance test was conducted, maintain average temperature for each 3-hr period at or above average operating temperature during the performance test; if a performance test was not conducted, and afterburner meets specifications of § 63.1505(f)(1), maintain average temperature for each 3-hr period at or above 1600 °F.
Afterburner operation Operate in accordance with OM&M plan. b
Dross-only furnace with fabric filter Bag leak detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan; b operate such that alarm does not sound more than 5% of operating time in 6-month period.
COM Initiate corrective action within 1-hr of a 6-minute average opacity reading of 5% or more and complete in accordance with the OM&M plan. b
Feed/charge material Operate using only dross as the feed material.
Rotary dross cooler with fabric filter Bag leak detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan; b operate such that alarm does not sound more than 5% of operating time in 6-month period.
COM Initiate corrective action within 1-hr of a 6-minute average opacity reading of 5% or more and complete in accordance with the OM&M plan. b
In-line fluxer with lime-injected fabric filter (including those that are part of a secondary aluminum processing unit) Bag leak detector or Initiate corrective action within 1-hr of alarm and complete in accordance with the OM&M plan; b operate such that alarm does not sound more than 5% of operating time in 6-month period.
COM Initiate corrective action within 1-hr of a 6-minute average opacity reading of 5% or more and complete in accordance with the OM&M plan.b
Lime injection rate Maintain free-flowing lime in the feed hopper or silo at all times for continuous injection systems; maintain feeder setting at or above the level established during performance test for continuous injection systems.
Reactive flux injection rate Maintain reactive flux injection rate at or below rate used during the performance test for each operating cycle or time period used in the performance test.
In-line fluxer (using no reactive flux material) Flux materials Use no reactive flux.
Group 1 furnace with lime-injected fabric filter (including those that are part of a secondary of aluminum processing unit) Bag leak detector or Initiate corrective action within 1-hr of alarm; operate such that alarm does not sound more than 5% of operating time in 6-month period; complete corrective action in accordance with the OM&M plan.b
COM Initiate corrective action within 1-hr of a 6-minute average opacity reading of 5% or more; complete corrective action in accordance with the OM&M plan.b
Fabric filter inlet temperature Maintain average fabric filter inlet temperature for each 3-hour period at or below average temperature during the performance test +14 °C (+25 °F).
Natural gas-fired, propane-fired or electrically heated group 1 furnaces that will be idled for at least 24 hours Operation of associated capture/collection systems and APCD b may be temporarily stopped. Operation of these capture/collection systems and control devices must be restarted before feed/charge, flux or alloying materials are added to the furnace.
Reactive flux injection rate Maintain reactive flux injection rate (kg/Mg) (lb/ton) at or below rate used during the performance test for each furnace cycle.
Lime injection rate Maintain free-flowing lime in the feed hopper or silo at all times for continuous injection systems; maintain feeder setting at or above the level established at performance test for continuous injection systems.
Maintain molten aluminum level Operate sidewell furnaces such that the level of molten metal is above the top of the passage between sidewell and hearth during reactive flux injection, unless the hearth is also controlled.
Fluxing in sidewell furnace hearth Add reactive flux only to the sidewell of the furnace unless the hearth is also controlled.
Group 1 furnace without add-on air pollution controls (including those that are part of a secondary aluminum processing unit) Reactive flux injection rate Maintain the total reactive chlorine flux injection rate and total reactive fluorine flux injection rate for each operating cycle or time period used in the performance test at or below the average rate established during the performance test.
Clean (group 2) furnace Charge and flux materials Use only clean charge. Use no reactive flux.
a Thermal chip dryers, scrap dryers/delacquering kilns/decoating kilns, dross-only furnaces, in-line fluxers and group 1 furnaces including melting/holding furnaces.
b OM&M plan—Operation, maintenance, and monitoring plan.
c Site-specific monitoring plan. Owner/operators of group 1 furnaces without add-on APCD must include a section in their OM&M plan that documents work practice and pollution prevention measures, including procedures for scrap inspection, by which compliance is achieved with emission limits and process or feed parameter-based operating requirements. This plan and the testing to demonstrate adequacy of the monitoring plan must be developed in coordination with and approved by the permitting authority for major sources, or the Administrator for area sources.
d APCD—Air pollution control device.
e Incorporated by reference, see § 63.14.

[65 FR 15710, Mar. 23, 2000, as amended at 67 FR 79818, Dec. 30, 2002; 69 FR 53984, Sept. 3, 2004; 80 FR 56757, Sept. 18, 2015; 81 FR 38092, June 13, 2016]

Table 3 to Subpart RRR of Part 63—Summary of Monitoring Requirements for New and Existing Affected Sources and Emission Units

Affected source/Emission unit Monitor type/Operation/Process Monitoring requirements
All affected sources and emission units with an add-on air pollution control device Emission capture and collection system Annual inspection of all emission capture, collection, and transport systems to ensure that systems continue to operate in accordance with ACGIH Guidelines.e Inspection includes volumetric flow rate measurements or verification of a permanent total enclosure using EPA Method 204.d
All affected sources and emission units subject to production-based (lb/ton or gr/ton of feed/charge) emission limits.a Feed/charge weight Record weight of each feed/charge, weight measurement device or other procedure accuracy of ±1%; b calibrate according to manufacturer's specifications, or at least once every 6 months.
Group 1 furnace, group 2 furnace, in-line fluxer, and scrap dryer/delacquering kiln/decoating kiln Labeling Check monthly to confirm that labels are intact and legible.
Aluminum scrap shredder with fabric filter Bag leak detector or Install and operate in accordance with manufacturer's operating instructions.
COM or Design and install in accordance with PS-1; collect data in accordance with subpart A of 40 CFR part 63; determine and record 6-minute block averages.
VE Conduct and record results of 30-minute daily test in accordance with Method 9 or ASTM D7520-13.e
Thermal chip dryer with afterburner Afterburner operating temperature Continuous measurement device to meet specifications in § 63.1510(g)(1); record average temperature for each 15-minute block; determine and record 3-hr block averages.
Afterburner operation Annual inspection of afterburner internal parts; complete repairs in accordance with the OM&M plan.
Feed/charge material Record identity of each feed/charge; certify feed/charge materials every 6 months.
Scrap dryer/delacquering kiln/decoating kiln with afterburner and lime-injected fabric filter Afterburner operating temperature Continuous measurement device to meet specifications in § 63.1510(g)(1); record temperature for each 15-minute block; determine and record 3-hr block averages.
Afterburner operation Annual inspection of afterburner internal parts; complete repairs in accordance with the OM&M plan.
Bag leak detector or Install and operate in accordance with manufacturer's operating instructions.
COM Design and Install in accordance with PS-1; collect data in accordance with subpart A of 40 CFR part 63; determine and record 6-minute block averages.
Lime injection rate For continuous injection systems, inspect each feed hopper or silo every 8 hours to verify that lime is free flowing; record results of each inspection. If blockage occurs, inspect every 4 hours for 3 days; return to 8-hour inspections if corrective action results in no further blockage during 3-day period, record feeder setting daily. Verify monthly that lime injection rate is no less than 90 percent of the rate used during the compliance demonstration test.
Fabric filter inlet temperature Continuous measurement device to meet specifications in § 63.1510(h)(2); record temperatures in 15-minute block averages; determine and record 3-hr block averages.
Sweat furnace with afterburner Afterburner operating temperature Continuous measurement device to meet specifications in § 63.1510(g)(1); record temperatures in 15-minute block averages; determine and record 3-hr block averages.
Afterburner operation Annual inspection of afterburner internal parts; complete repairs in accordance with the OM&M plan.
Dross-only furnace with fabric filter Bag leak detector or Install and operate in accordance with manufacturer's operating instructions.
COM Design and install in accordance with PS-1; collect data in accordance with subpart A of 40 CFR part 63; determine and record 6-minute block averages.
Feed/charge material Record identity of each feed/charge; certify charge materials every 6 months.
Rotary dross cooler with fabric filter Bag leak detector or Install and operate in accordance with manufacturer's operating instructions.
COM Design and install in accordance with PS-1; collect data in accordance with subpart A of 40 CFR part 63; determine and record 6-minute block averages.
In-line fluxer with lime-injected fabric filter Bag leak detector or Install and operate in accordance with manufacturer's operating instructions.
COM Design and install in accordance with PS-1; collect data in accordance with subpart A of 40 CFR part 63; determine and record 6-minute block averages.
Reactive flux injection rate Weight measurement device accuracy of ±1%; b calibrate according to manufacturer's specifications or at least once every 6 months; record time, weight and type of reactive flux added or injected for each 15-minute block period while reactive fluxing occurs; calculate and record total reactive chlorine flux injection rate and the total reactive fluorine flux injection rate for each operating cycle or time period used in performance test; or Alternative flux injection rate determination procedure per § 63.1510(j)(5). For solid flux added intermittently, record the amount added for each operating cycle or time period used in the performance test.
In-line fluxer using no reactive flux Flux materials Record flux materials; certify every 6 months for no reactive flux.
Group 1 furnace with lime-injected fabric filter Bag leak detector or Install and operate in accordance with manufacturer's operating instructions.
COM Design and install in accordance with PS-1; collect data in accordance with subpart A of 40 part CFR 63; determine and record 6-minute block averages.
Lime injection rate For continuous injection systems, record feeder setting daily and inspect each feed hopper or silo every 8 hours to verify that lime is free-flowing; record results of each inspection. If blockage occurs, inspect every 4 hours for 3 days; return to 8-hour inspections if corrective action results in no further blockage during 3-day period.c Verify monthly that the lime injection rate is no less than 90 percent of the rate used during the compliance demonstration test.
Reactive flux injection rate Weight measurement device accuracy of ±1%; b calibrate every 3 months; record weight and type of reactive flux added or injected for each 15-minute block period while reactive fluxing occurs; calculate and record total reactive chlorine flux injection rate and the total reactive fluorine flux injection rate for each operating cycle or time period used in performance test; or Alternative flux injection rate determination procedure per § 63.1510(j)(5). For solid flux added intermittently, record the amount added for each operating cycle or time period used in the performance test.
Group 1 furnace without add-on controls Fluxing in sidewell furnace hearth Maintain flux addition operating log; certify every 6 months.
Reactive flux injection rate Weight measurement device accuracy of +1%; b calibrate according to manufacturer's specifications or at least once every six months; record weight and type of reactive flux added or injected for each 15-minute block period while reactive fluxing occurs; calculate and record total reactive flux injection rate for each operating cycle or time period used in performance test. For solid flux added intermittently, record the amount added for each operating cycle or time period used in the performance test.
OM&M plan (approved by permitting agency) Demonstration of site-specific monitoring procedures to provide data and show correlation of emissions across the range of charge and flux materials and furnace operating parameters.
Feed material (melting/holding furnace) Record type of permissible feed/charge material; certify charge materials every 6 months.
Clean (group 2) furnace Charge and flux materials Record charge and flux materials; certify every 6 months for clean charge and no reactive flux.
a Thermal chip dryers, scrap dryers/delacquering kilns/decoating kilns, dross-only furnaces, in-line fluxers and group 1 furnaces or melting/holding furnaces.
b Permitting agency may approve measurement devices of alternative accuracy, for example in cases where flux rates are very low and costs of meters of specified accuracy are prohibitive; or where feed/charge weighing devices of specified accuracy are not practicable due to equipment layout or charging practices.
c Permitting authority for major sources, or the Administrator for area sources may approve other alternatives including load cells for lime hopper weight, sensors for carrier gas pressure, or HCl monitoring devices at fabric filter outlet.
d The frequency of volumetric flow rate measurements may be decreased to once every 5 years if daily differential pressure measures, daily fan RPM, or daily fan motor amp measurements are made in accordance with § 63.1510(d)(2)(ii)-(iii). The frequency of annual verification of a permanent total enclosure may be decreased to once every 5 years if negative pressure measurements in the enclosure are made daily in accordance with § 63.1510(d)(2)(iv). In lieu of volumetric flow rate measurements or verification of permanent total enclosure, sweat furnaces may demonstrate annually negative air flow into the sweat furnace opening in accordance with § 63.1510(d)(3).
e Incorporated by reference, see § 63.14.

[65 FR 15710, Mar. 23, 2000, as amended at 69 FR 53985, Sept. 3, 2004; 80 FR 56758, Sept. 18, 2015; 81 FR 38092, June 13, 2016]

Appendix A to Subpart RRR of Part 63—General Provisions Applicability to Subpart RRR

Citation Requirement Applies to RRR Comment
§ 63.1(a)(1)-(4) General Applicability Yes
§ 63.1(a)(5) No [Reserved]
§ 63.1(a)(6) Yes
§ 63.1(a)(7)-(9) No [Reserved]
§ 63.1(a)(10)-(12) Yes
§ 63.1(b) Initial Applicability Determination Yes EPA retains approval authority.
§ 63.1(c)(1) Applicability After Standard Established Yes
§ 63.1(c)(2) Yes § 63.1500(e) exempts area sources subject to this subpart from the obligation to obtain Title V operating permits.
§ 63.1(c)(3)-(4) No [Reserved]
§ 63.1(c)(5) Yes
§ 63.1(c)(6) Reclassification Yes
§ 63.1(d) No [Reserved]
§ 63.1(e) Applicability of Permit Program Yes
§ 63.2 Definitions Yes Additional definitions in § 63.1503.
§ 63.3 Units and Abbreviations Yes
§ 63.4(a)(1)-(2) Prohibited Activities Yes
§ 63.4(a)(3)-(5) No [Reserved]
§ 63.4(b) Circumvention Yes
§ 63.4(c) Fragmentation Yes
§ 63.5(a) Applicability of Preconstruction Review and Notification Yes
§ 63.5(b)(1) Requirements for Existing, Newly, Constructed Sources and Reconstructed Sources Yes
§ 63.5(b)(2) No [Reserved]
§ 63.5(b)(3)-(4) Yes
§ 63.5(b)(5) No [Reserved]
§ 63.5(b)(6) Yes
§ 63.5(c) No [Reserved]
§ 63.5(d) Application for Approval of Construction or Reconstruction Yes
§ 63.5(e) Approval of Construction or Reconstruction Yes
§ 63.5(f) Approval of Construction or Reconstruction Based on Prior State Preconstruction Review Yes
§ 63.6(a) Applicability for Compliance with Standards and Maintenance Requirements Yes
§ 63.6(b)(1)-(5) Compliance Dates for New and Reconstructed Sources Yes § 63.1501 specifies dates.
§ 63.6(b)(6) No [Reserved]
§ 63.6(b)(7) Yes
§ 63.6(c)(1) Compliance Dates for Existing Sources Yes § 63.1501 specifies dates.
§ 63.6(c)(2) Yes
§ 63.6(c)(3)-(4) No [Reserved]
§ 63.6(c)(5) Yes
§ 63.6(d) No [Reserved]
§ 63.6(e)(1)(i) Operation and Maintenance Requirements No See § 63.1506(a)(5) for general duty requirement. Any other cross reference to § 63.6(3)(1)(i) in any other general provision referenced shall be treated as a cross reference to § 63.1506(a)(5).
§ 63.6(e)(1)(ii) No
§ 63.6(e)(2) No [Reserved]
§ 63.6(e)(3) Startup, Shutdown, and Malfunction Plan No
§ 63.6(f)(1) Compliance with Nonopacity Emission Standards No
§ 63.6(f)(2) Yes
§ 63.6(g) Use of an Alternative Nonopacity Emission Standard No
§ 63.6(h)(1) Applicability for Compliance with Opacity and Visible Emission Standards No
§ 63.6(h)(2) Methods for Determining Compliance Yes
§ 63.6(h)(3) No [Reserved]
§ 63.6(h)(4)-(9) Yes
§ 63.6(i)(1)-(14) Extension of Compliance Yes
§ 63.6(i)(15) No [Reserved]
§ 63.6(i)(16) Yes
§ 63.6(j) Exemption from Compliance Yes
§ 63.7(a) Applicability and Performance Test Dates Yes Except § 63.1511 establishes dates for initial performance tests.
§ 63.7(b) Notification of Performance Test Yes
§ 63.7(c) Quality Assurance Program Yes
§ 63.7(d) Performance Testing Facilities Yes
§ 63.7(e)(1) Conduct of Performance Tests No
§ 63.7(e)(2) Yes
§ 63.7(e)(3) Yes
§ 63.7(f) Use of an Alternative Test Method Yes
§ 63.7(g)(1)-(3) Data Analysis, Recordkeeping, and Reporting Yes Except for § 63.7(g)(2), which is reserved.
§ 63.7(h)(1)-(5) Waiver of Performance Tests Yes
§ 63.8(a)(1) Applicability for Monitoring Requirements Yes
§ 63.8(a)(2) Yes
§ 63.8(a)(3) No [Reserved]
§ 63.8(a)(4) Yes
§ 63.8(b) Conduct of Monitoring Yes
§ 63.8(c)(1)(i) Operation and Maintenance of Continuous Monitoring Systems (CMS) No See § 63.1506(a)(5) for general duty requirement.
§ 63.8(c)(1)(ii) Yes
§ 63.8(c)(1)(iii) No
§ 63.8(c)(2)-(8) Yes
§ 63.8(d)(1)-(2) Quality Control Program Yes
§ 63.8(d)(3) Yes, except for last sentence, which refers to an SSM plan. SSM plans are not required
§ 63.8(e) Performance Evaluation of CMS Yes
§ 63.8(f)(1)-(5) Use of an Alternative Monitoring Method No § 63.1501(w) includes provisions for monitoring alternatives.
§ 63.8(f)(6) Alternative to the Relative Accuracy Test Yes
§ 63.8(g)(1) Reduction of Monitoring Data Yes
§ 63.8(g)(2) No § 63.1512 requires five 6-minute averages for an aluminum scrap shredder.
§ 63.8(g)(3)-(5) Yes
§ 63.9(a) Applicability and General Information for Notification Requirements Yes
§ 63.9(b)(1)-(5) Initial Notifications Yes Except § 63.9(b)(3) is reserved.
§ 63.9(c) Request for Compliance Extension Yes
§ 63.9(d) Notification that Source is Subject to Special Compliance Requirements Yes
§ 63.9(e) Notification of Performance Test Yes
§ 63.9(f) Notification of Opacity and Visible Emission Observations Yes
§ 63.9(g) Additional Notification Requirement for Sources with CMS Yes
§ 63.9(h)(1)-(3) Notification of Compliance Status Yes Except § 63.1515 establishes dates notification of compliance status reports.
§ 63.9(h)(4) No [Reserved]
§ 63.9(h)(5)-(6) Yes
§ 63.9(i) Adjustment of Deadlines for Required Communications Yes
§ 63.9(j) Change in Information Already Provided Yes
§ 63.9(k) Electronic reporting procedures Yes Only as specified in § 63.9(j).
§ 63.10(a) Applicability and General Information for Recordkeeping and Reporting Requirements Yes
§ 63.10(b)(1) General Recordkeeping Requirements Yes
§ 63.10(b)(2)(i), (ii), (iv), (v) No
§ 63.10(b)(2)(iii), (vi)-(xiv) Yes § 63.1517 includes additional requirements.
§ 63.10(b)(3) Recordkeeping Requirement for Applicability Determinations Yes
§ 63.10(c)(1) Additional Recordkeeping Requirements for Sources with CMS Yes
§ 63.10(c)(2)-(4) No [Reserved]
§ 63.10(c)(5) Yes
§ 63.10(c)(6) Yes
§ 63.10(c)(7)-(8) Yes
§ 63.10(c)(9) No [Reserved]
§ 63.10(c)(10)-(13) Yes
§ 63.10(c)(14) Yes
§ 63.10(c)(15) No
§ 63.10(d)(1) General Reporting Requirements Yes
§ 63.10(d)(2) Reporting Results of Performance Tests Yes
§ 63.10(d)(3) Reporting Results of Opacity or Visible Emission Observations Yes
§ 63.10(d)(4) Progress Reports No See § 63.1516(d).
§ 63.10(d)(5) Periodic Startup, Shutdown, and Malfunction Reports No See § 63.1516(d).
§ 63.10(e)(1)-(2) Additional Reporting Requirements for Sources with CMS Yes
§ 63.10(e)(3) Excess Emissions and CMS Performance Report and Summary Report Yes Reporting deadline given in § 63.1516.
§ 63.10(e)(4) Continuous Opacity Monitoring System (COMS) Data Produced During a Performance Test Yes
§ 63.10(f) Waiver of Recordkeeping or Reporting Requirements Yes
§ 63.11(a)-(e) Control Device and Work Practice Requirements No Flares not applicable.
§ 63.12(a)-(c) State Authority and Delegations Yes EPA retains authority for applicability determinations.
§ 63.13 Addresses Yes
§ 63.14 Incorporations by Reference Yes ACGIH Guidelines, ASTM D7520-13, and Interim Procedures for Estimating Risks Associated with Exposures to Mixtures of Chlorinated Dibenzo-p-Dioxins and -Dibenzofurans (CDDs and CDFs) and 1989 Update.
§ 63.15 Availability of Information and Confidentiality Yes
§ 63.16 Performance Track Provisions No

[81 FR 38093, June 13, 2016, as amended at 85 FR 73901, Nov. 19, 2020]