The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Other Requirements and Information

§ 63.11130 What parts of the General Provisions apply to me?

Table 3 to this subpart shows which parts of the General Provisions apply to you.

§ 63.11131 Who implements and enforces this subpart?

(a) This subpart can be implemented and enforced by the U.S. EPA or a delegated authority such as the applicable State, local, or tribal agency. If the U.S. EPA Administrator has delegated authority to a State, local, or tribal agency, then that agency, in addition to the U.S. EPA, has the authority to implement and enforce this subpart. Contact the applicable U.S. EPA Regional Office to find out if implementation and enforcement of this subpart is delegated to a State, local, or tribal agency.

(b) In delegating implementation and enforcement authority of this subpart to a State, local, or tribal agency under subpart E of this part, the authorities contained in paragraph (c) of this section are retained by the Administrator of U.S. EPA and cannot be transferred to the State, local, or tribal agency.

(c) The authorities that cannot be delegated to State, local, or tribal agencies are as specified in paragraphs (c)(1) through (3) of this section.

(1) Approval of alternatives to the requirements in §§ 63.11116 through 63.11118 and 63.11120.

(2) Approval of major alternatives to test methods under § 63.7(e)(2)(ii) and (f), as defined in § 63.90, and as required in this subpart.

(3) Approval of major alternatives to recordkeeping and reporting under § 63.10(f), as defined in § 63.90, and as required in this subpart.

§ 63.11132 What definitions apply to this subpart?

As used in this subpart, all terms not defined herein shall have the meaning given them in the Clean Air Act (CAA), or in subparts A and BBBBBB of this part. For purposes of this subpart, definitions in this section supersede definitions in other parts or subparts.

Dual-point vapor balance system means a type of vapor balance system in which the storage tank is equipped with an entry port for a gasoline fill pipe and a separate exit port for a vapor connection.

Gasoline means any petroleum distillate or petroleum distillate/alcohol blend having a Reid vapor pressure of 27.6 kilopascals or greater, which is used as a fuel for internal combustion engines.

Gasoline cargo tank means a delivery tank truck or railcar which is loading or unloading gasoline, or which has loaded or unloaded gasoline on the immediately previous load.

Gasoline dispensing facility (GDF) means any stationary facility which dispenses gasoline into the fuel tank of a motor vehicle, motor vehicle engine, nonroad vehicle, or nonroad engine, including a nonroad vehicle or nonroad engine used solely for competition. These facilities include, but are not limited to, facilities that dispense gasoline into on- and off-road, street, or highway motor vehicles, lawn equipment, boats, test engines, landscaping equipment, generators, pumps, and other gasoline-fueled engines and equipment.

Monthly throughput means the total volume of gasoline that is loaded into, or dispensed from, all gasoline storage tanks at each GDF during a month. Monthly throughput is calculated by summing the volume of gasoline loaded into, or dispensed from, all gasoline storage tanks at each GDF during the current day, plus the total volume of gasoline loaded into, or dispensed from, all gasoline storage tanks at each GDF during the previous 364 days, and then dividing that sum by 12.

Motor vehicle means any self-propelled vehicle designed for transporting persons or property on a street or highway.

Nonroad engine means an internal combustion engine (including the fuel system) that is not used in a motor vehicle or a vehicle used solely for competition, or that is not subject to standards promulgated under section 7411 of this title or section 7521 of this title.

Nonroad vehicle means a vehicle that is powered by a nonroad engine, and that is not a motor vehicle or a vehicle used solely for competition.

Submerged filling means, for the purposes of this subpart, the filling of a gasoline storage tank through a submerged fill pipe whose discharge is no more than the applicable distance specified in § 63.11117(b) from the bottom of the tank. Bottom filling of gasoline storage tanks is included in this definition.

Vapor balance system means a combination of pipes and hoses that create a closed system between the vapor spaces of an unloading gasoline cargo tank and a receiving storage tank such that vapors displaced from the storage tank are transferred to the gasoline cargo tank being unloaded.

Vapor-tight means equipment that allows no loss of vapors. Compliance with vapor-tight requirements can be determined by checking to ensure that the concentration at a potential leak source is not equal to or greater than 100 percent of the Lower Explosive Limit when measured with a combustible gas detector, calibrated with propane, at a distance of 1 inch from the source.

Vapor-tight gasoline cargo tank means a gasoline cargo tank which has demonstrated within the 12 preceding months that it meets the annual certification test requirements in § 63.11092(f) of this part.

[73 FR 1945, Jan. 10, 2008, as amended at 76 FR 4183, Jan. 24, 2011]

Table 1 to Subpart CCCCCC of Part 63—Applicability Criteria and Management Practices for Gasoline Dispensing Facilities With Monthly Throughput of 100,000 Gallons of Gasoline or More1

If you own or operate Then you must
1. A new, reconstructed, or existing GDF subject to § 63.11118 Install and operate a vapor balance system on your gasoline storage tanks that meets the design criteria in paragraphs (a) through (h).
(a) All vapor connections and lines on the storage tank shall be equipped with closures that seal upon disconnect.
(b) The vapor line from the gasoline storage tank to the gasoline cargo tank shall be vapor-tight, as defined in § 63.11132.
(c) The vapor balance system shall be designed such that the pressure in the tank truck does not exceed 18 inches water pressure or 5.9 inches water vacuum during product transfer.
(d) The vapor recovery and product adaptors, and the method of connection with the delivery elbow, shall be designed so as to prevent the over-tightening or loosening of fittings during normal delivery operations.
(e) If a gauge well separate from the fill tube is used, it shall be provided with a submerged drop tube that extends the same distance from the bottom of the storage tank as specified in § 63.11117(b).
(f) Liquid fill connections for all systems shall be equipped with vapor-tight caps.
(g) Pressure/vacuum (PV) vent valves shall be installed on the storage tank vent pipes. The pressure specifications for PV vent valves shall be: a positive pressure setting of 2.5 to 6.0 inches of water and a negative pressure setting of 6.0 to 10.0 inches of water. The total leak rate of all PV vent valves at an affected facility, including connections, shall not exceed 0.17 cubic foot per hour at a pressure of 2.0 inches of water and 0.63 cubic foot per hour at a vacuum of 4 inches of water.
(h) The vapor balance system shall be capable of meeting the static pressure performance requirement of the following equation:
Pf = 2e−500.887/v
Where:
Pf = Minimum allowable final pressure, inches of water.
v = Total ullage affected by the test, gallons.
e = Dimensionless constant equal to approximately 2.718.
2 = The initial pressure, inches water.
2. A new or reconstructed GDF, or any storage tank(s) constructed after November 9, 2006, at an existing affected facility subject to § 63.11118 Equip your gasoline storage tanks with a dual-point vapor balance system, as defined in § 63.11132, and comply with the requirements of item 1 in this Table.
1 The management practices specified in this Table are not applicable if you are complying with the requirements in § 63.11118(b)(2), except that if you are complying with the requirements in § 63.11118(b)(2)(i)(B), you must operate using management practices at least as stringent as those listed in this Table.

[73 FR 1945, Jan. 10, 2008, as amended at 73 FR 35944, June 25, 2008; 76 FR 4184, Jan. 24, 2011]

Table 2 to Subpart CCCCCC of Part 63—Applicability Criteria and Management Practices for Gasoline Cargo Tanks Unloading at Gasoline Dispensing Facilities With Monthly Throughput of 100,000 Gallons of Gasoline or More

If you own or operate Then you must
A gasoline cargo tank Not unload gasoline into a storage tank at a GDF subject to the control requirements in this subpart unless the following conditions are met:
(i) All hoses in the vapor balance system are properly connected,
(ii) The adapters or couplers that attach to the vapor line on the storage tank have closures that seal upon disconnect,
(iii) All vapor return hoses, couplers, and adapters used in the gasoline delivery are vapor-tight,
(iv) All tank truck vapor return equipment is compatible in size and forms a vapor-tight connection with the vapor balance equipment on the GDF storage tank, and
(v) All hatches on the tank truck are closed and securely fastened.
(vi) The filling of storage tanks at GDF shall be limited to unloading from vapor-tight gasoline cargo tanks. Documentation that the cargo tank has met the specifications of EPA Method 27 shall be carried with the cargo tank, as specified in § 63.11125(c).

[73 FR 1945, Jan. 10, 2008, as amended at 76 FR 4184, Jan. 24, 2011]

Table 3 to Subpart CCCCCC of Part 63—Applicability of General Provisions

Citation Subject Brief description Applies to subpart CCCCCC
§ 63.1 Applicability Initial applicability determination; applicability after standard established; permit requirements; extensions, notifications Yes, specific requirements given in § 63.11111.
§ 63.1(c)(2) Title V Permit Requirements for obtaining a title V permit from the applicable permitting authority Yes, § 63.11111(f) of subpart CCCCCC exempts identified area sources from the obligation to obtain title V operating permits.
§ 63.2 Definitions Definitions for part 63 standards Yes, additional definitions in § 63.11132.
§ 63.3 Units and Abbreviations Units and abbreviations for part 63 standards Yes.
§ 63.4 Prohibited Activities and Circumvention Prohibited activities; Circumvention, severability Yes.
§ 63.5 Construction/Reconstruction Applicability; applications; approvals Yes, except that these notifications are not required for facilities subject to § 63.11116
§ 63.6(a) Compliance with Standards/Operation & Maintenance—Applicability General Provisions apply unless compliance extension; General Provisions apply to area sources that become major Yes.
§ 63.6(b)(1)-(4) Compliance Dates for New and Reconstructed Sources Standards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for CAA section 112(f) Yes.
§ 63.6(b)(5) Notification Must notify if commenced construction or reconstruction after proposal Yes.
§ 63.6(b)(6) [Reserved]
§ 63.6(b)(7) Compliance Dates for New and Reconstructed Area Sources That Become Major Area sources that become major must comply with major source standards immediately upon becoming major, regardless of whether required to comply when they were an area source No.
§ 63.6(c)(1)-(2) Compliance Dates for Existing Sources Comply according to date in this subpart, which must be no later than 3 years after effective date; for CAA section 112(f) standards, comply within 90 days of effective date unless compliance extension No, § 63.11113 specifies the compliance dates.
§ 63.6(c)(3)-(4) [Reserved]
§ 63.6(c)(5) Compliance Dates for Existing Area Sources That Become Major Area sources That become major must comply with major source standards by date indicated in this subpart or by equivalent time period (e.g., 3 years) No.
§ 63.6(d) [Reserved]
63.6(e)(1)(i) General duty to minimize emissions Operate to minimize emissions at all times; information Administrator will use to determine if operation and maintenance requirements were met. No. See § 63.11115 for general duty requirement.
63.6(e)(1)(ii) Requirement to correct malfunctions ASAP Owner or operator must correct malfunctions as soon as possible. No.
§ 63.6(e)(2) [Reserved]
§ 63.6(e)(3) Startup, Shutdown, and Malfunction (SSM) Plan Requirement for SSM plan; content of SSM plan; actions during SSM No.
§ 63.6(f)(1) Compliance Except During SSM You must comply with emission standards at all times except during SSM No.
§ 63.6(f)(2)-(3) Methods for Determining Compliance Compliance based on performance test, operation and maintenance plans, records, inspection Yes.
§ 63.6(g)(1)-(3) Alternative Standard Procedures for getting an alternative standard Yes.
§ 63.6(h)(1) Compliance with Opacity/Visible Emission (VE) Standards You must comply with opacity/VE standards at all times except during SSM No.
§ 63.6(h)(2)(i) Determining Compliance with Opacity/VE Standards If standard does not State test method, use EPA Method 9 for opacity in appendix A of part 60 of this chapter and EPA Method 22 for VE in appendix A of part 60 of this chapter No.
§ 63.6(h)(2)(ii) [Reserved]
§ 63.6(h)(2)(iii) Using Previous Tests To Demonstrate Compliance With Opacity/VE Standards Criteria for when previous opacity/VE testing can be used to show compliance with this subpart No.
§ 63.6(h)(3) [Reserved]
§ 63.6(h)(4) Notification of Opacity/VE Observation Date Must notify Administrator of anticipated date of observation No.
§ 63.6(h)(5)(i), (iii)-(v) Conducting Opacity/VE Observations Dates and schedule for conducting opacity/VE observations No.
§ 63.6(h)(5)(ii) Opacity Test Duration and Averaging Times Must have at least 3 hours of observation with 30 6-minute averages No.
§ 63.6(h)(6) Records of Conditions During Opacity/VE Observations Must keep records available and allow Administrator to inspect No.
§ 63.6(h)(7)(i) Report Continuous Opacity Monitoring System (COMS) Monitoring Data From Performance Test Must submit COMS data with other performance test data No.
§ 63.6(h)(7)(ii) Using COMS Instead of EPA Method 9 Can submit COMS data instead of EPA Method 9 results even if rule requires EPA Method 9 in appendix A of part 60 of this chapter, but must notify Administrator before performance test No.
§ 63.6(h)(7)(iii) Averaging Time for COMS During Performance Test To determine compliance, must reduce COMS data to 6-minute averages No.
§ 63.6(h)(7)(iv) COMS Requirements Owner/operator must demonstrate that COMS performance evaluations are conducted according to § 63.8(e); COMS are properly maintained and operated according to § 63.8(c) and data quality as § 63.8(d) No.
§ 63.6(h)(7)(v) Determining Compliance with Opacity/VE Standards COMS is probable but not conclusive evidence of compliance with opacity standard, even if EPA Method 9 observation shows otherwise. Requirements for COMS to be probable evidence-proper maintenance, meeting Performance Specification 1 in appendix B of part 60 of this chapter, and data have not been altered No.
§ 63.6(h)(8) Determining Compliance with Opacity/VE Standards Administrator will use all COMS, EPA Method 9 (in appendix A of part 60 of this chapter), and EPA Method 22 (in appendix A of part 60 of this chapter) results, as well as information about operation and maintenance to determine compliance No.
§ 63.6(h)(9) Adjusted Opacity Standard Procedures for Administrator to adjust an opacity standard No.
§ 63.6(i)(1)-(14) Compliance Extension Procedures and criteria for Administrator to grant compliance extension Yes.
§ 63.6(j) Presidential Compliance Exemption President may exempt any source from requirement to comply with this subpart Yes.
§ 63.7(a)(2) Performance Test Dates Dates for conducting initial performance testing; must conduct 180 days after compliance date Yes.
§ 63.7(a)(3) CAA Section 114 Authority Administrator may require a performance test under CAA section 114 at any time Yes.
§ 63.7(b)(1) Notification of Performance Test Must notify Administrator 60 days before the test Yes.
§ 63.7(b)(2) Notification of Re-scheduling If have to reschedule performance test, must notify Administrator of rescheduled date as soon as practicable and without delay Yes.
§ 63.7(c) Quality Assurance (QA)/Test Plan Requirement to submit site-specific test plan 60 days before the test or on date Administrator agrees with; test plan approval procedures; performance audit requirements; internal and external QA procedures for testing Yes.
§ 63.7(d) Testing Facilities Requirements for testing facilities Yes.
63.7(e)(1) Conditions for Conducting Performance Tests Performance test must be conducted under representative conditions No, § 63.11120(c) specifies conditions for conducting performance tests.
§ 63.7(e)(2) Conditions for Conducting Performance Tests Must conduct according to this subpart and EPA test methods unless Administrator approves alternative Yes.
§ 63.7(e)(3) Test Run Duration Must have three test runs of at least 1 hour each; compliance is based on arithmetic mean of three runs; conditions when data from an additional test run can be used Yes.
§ 63.7(f) Alternative Test Method Procedures by which Administrator can grant approval to use an intermediate or major change, or alternative to a test method Yes.
§ 63.7(g) Performance Test Data Analysis Must include raw data in performance test report; must submit performance test data 60 days after end of test with the Notification of Compliance Status; keep data for 5 years Yes.
§ 63.7(h) Waiver of Tests Procedures for Administrator to waive performance test Yes.
§ 63.8(a)(1) Applicability of Monitoring Requirements Subject to all monitoring requirements in standard Yes.
§ 63.8(a)(2) Performance Specifications Performance Specifications in appendix B of 40 CFR part 60 apply Yes.
§ 63.8(a)(3) [Reserved]
§ 63.8(a)(4) Monitoring of Flares Monitoring requirements for flares in § 63.11 apply Yes.
§ 63.8(b)(1) Monitoring Must conduct monitoring according to standard unless Administrator approves alternative Yes.
§ 63.8(b)(2)-(3) Multiple Effluents and Multiple Monitoring Systems Specific requirements for installing monitoring systems; must install on each affected source or after combined with another affected source before it is released to the atmosphere provided the monitoring is sufficient to demonstrate compliance with the standard; if more than one monitoring system on an emission point, must report all monitoring system results, unless one monitoring system is a backup No.
§ 63.8(c)(1) Monitoring System Operation and Maintenance Maintain monitoring system in a manner consistent with good air pollution control practices No.
§ 63.8(c)(1)(i)-(iii) Operation and Maintenance of Continuous Monitoring Systems (CMS) Must maintain and operate each CMS as specified in § 63.6(e)(1); must keep parts for routine repairs readily available; must develop a written SSM plan for CMS, as specified in § 63.6(e)(3) No.
§ 63.8(c)(2)-(8) CMS Requirements Must install to get representative emission or parameter measurements; must verify operational status before or at performance test No.
§ 63.8(d) CMS Quality Control Requirements for CMS quality control, including calibration, etc.; must keep quality control plan on record for 5 years; keep old versions for 5 years after revisions No.
§ 63.8(e) CMS Performance Evaluation Notification, performance evaluation test plan, reports No.
§ 63.8(f)(1)-(5) Alternative Monitoring Method Procedures for Administrator to approve alternative monitoring No.
§ 63.8(f)(6) Alternative to Relative Accuracy Test Procedures for Administrator to approve alternative relative accuracy tests for continuous emissions monitoring system (CEMS) No.
§ 63.8(g) Data Reduction COMS 6-minute averages calculated over at least 36 evenly spaced data points; CEMS 1 hour averages computed over at least 4 equally spaced data points; data that cannot be used in average No.
§ 63.9(a) Notification Requirements Applicability and State delegation Yes.
§ 63.9(b)(1)-(2), (4)-(5) Initial Notifications Submit notification within 120 days after effective date, or no later than 120 days after the source becomes subject to this subpart, whichever is later; notification of intent to construct/reconstruct, notification of commencement of construction/reconstruction, notification of startup; contents of each Yes.
§ 63.9(c) Request for Compliance Extension Can request if cannot comply by date or if installed best available control technology or lowest achievable emission rate Yes.
§ 63.9(d) Notification of Special Compliance Requirements for New Sources For sources that commence construction between proposal and promulgation and want to comply 3 years after effective date Yes.
§ 63.9(e) Notification of Performance Test Notify Administrator 60 days prior Yes.
§ 63.9(f) Notification of VE/Opacity Test Notify Administrator 30 days prior No.
§ 63.9(g) Additional Notifications when Using CMS Notification of performance evaluation; notification about use of COMS data; notification that exceeded criterion for relative accuracy alternative Yes, however, there are no opacity standards.
§ 63.9(h)(1)-(6) Notification of Compliance Status Contents due 60 days after end of performance test or other compliance demonstration, except for opacity/VE, which are due 30 days after; when to submit to Federal vs. State authority Yes, however, there are no opacity standards.
§ 63.9(i) Adjustment of Submittal Deadlines Procedures for Administrator to approve change when notifications must be submitted Yes.
§ 63.9(j) Change in Previous Information Must submit within 15 days after the change Yes.
§ 63.9(k) Notifications Electronic reporting procedures Yes, only as specified in § 63.9(j).
§ 63.10(a) Recordkeeping/Reporting Applies to all, unless compliance extension; when to submit to Federal vs. State authority; procedures for owners of more than one source Yes.
§ 63.10(b)(1) Recordkeeping/Reporting General requirements; keep all records readily available; keep for 5 years Yes.
§ 63.10(b)(2)(i) Records related to SSM Recordkeeping of occurrence and duration of startups and shutdowns No.
§ 63.10(b)(2)(ii) Records related to SSM Recordkeeping of malfunctions No. See § 63.11125(d) for recordkeeping of (1) occurrence and duration and (2) actions taken during malfunction.
§ 63.10(b)(2)(iii) Maintenance records Recordkeeping of maintenance on air pollution control and monitoring equipment Yes.
§ 63.10(b)(2)(iv) Records Related to SSM Actions taken to minimize emissions during SSM No.
§ 63.10(b)(2)(v) Records Related to SSM Actions taken to minimize emissions during SSM No.
§ 63.10(b)(2)(vi)-(xi) CMS Records Malfunctions, inoperative, out-of-control periods No.
§ 63.10(b)(2)(xii) Records Records when under waiver Yes.
§ 63.10(b)(2)(xiii) Records Records when using alternative to relative accuracy test Yes.
§ 63.10(b)(2)(xiv) Records All documentation supporting Initial Notification and Notification of Compliance Status Yes.
§ 63.10(b)(3) Records Applicability determinations Yes.
§ 63.10(c) Records Additional records for CMS No.
§ 63.10(d)(1) General Reporting Requirements Requirement to report Yes.
§ 63.10(d)(2) Report of Performance Test Results When to submit to Federal or State authority Yes.
§ 63.10(d)(3) Reporting Opacity or VE Observations What to report and when No.
§ 63.10(d)(4) Progress Reports Must submit progress reports on schedule if under compliance extension Yes.
§ 63.10(d)(5) SSM Reports Contents and submission No. See § 63.11126(b) for malfunction reporting requirements.
§ 63.10(e)(1)-(2) Additional CMS Reports Must report results for each CEMS on a unit; written copy of CMS performance evaluation; two-three copies of COMS performance evaluation No.
§ 63.10(e)(3)(i)-(iii) Reports Schedule for reporting excess emissions No.
§ 63.10(e)(3)(iv)-(v) Excess Emissions Reports Requirement to revert to quarterly submission if there is an excess emissions and parameter monitor exceedances (now defined as deviations); provision to request semiannual reporting after compliance for 1 year; submit report by 30th day following end of quarter or calendar half; if there has not been an exceedance or excess emissions (now defined as deviations), report contents in a statement that there have been no deviations; must submit report containing all of the information in §§ 63.8(c)(7)-(8) and 63.10(c)(5)-(13) No.
§ 63.10(e)(3)(iv)-(v) Excess Emissions Reports Requirement to revert to quarterly submission if there is an excess emissions and parameter monitor exceedances (now defined as deviations); provision to request semiannual reporting after compliance for 1 year; submit report by 30th day following end of quarter or calendar half; if there has not been an exceedance or excess emissions (now defined as deviations), report contents in a statement that there have been no deviations; must submit report containing all of the information in §§ 63.8(c)(7)-(8) and 63.10(c)(5)-(13) No, § 63.11130(K) specifies excess emission events for this subpart.
§ 63.10(e)(3)(vi)-(viii) Excess Emissions Report and Summary Report Requirements for reporting excess emissions for CMS; requires all of the information in §§ 63.10(c)(5)-(13) and 63.8(c)(7)-(8) No.
§ 63.10(e)(4) Reporting COMS Data Must submit COMS data with performance test data No.
§ 63.10(f) Waiver for Recordkeeping/Reporting Procedures for Administrator to waive Yes.
§ 63.11(b) Flares Requirements for flares No.
§ 63.12 Delegation State authority to enforce standards Yes.
§ 63.13 Addresses Addresses where reports, notifications, and requests are sent Yes.
§ 63.14 Incorporations by Reference Test methods incorporated by reference Yes.
§ 63.15 Availability of Information Public and confidential information Yes.

[73 FR 1945, Jan. 10, 2008, as amended at 76 FR 4184, Jan. 24, 2011; 85 FR 73919, Nov. 19, 2020]