The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 40Protection of EnvironmentPart / Section
Chapter IEnvironmental Protection Agency1 – 1099
Subchapter CAir Programs50 – 99
Part 62Approval and Promulgation of State Plans for Designated Facilities and Pollutants62.01 – 62.16730
Subpart LLLFederal Plan Requirements for Sewage Sludge Incineration Units Constructed on or Before October 14, 201062.15855 – 62.16050
Applicability62.15855 – 62.15870
§ 62.15855Am I subject to this subpart?
§ 62.15860What SSI units are exempt from the federal plan?
§ 62.15865How do I determine if my SSI unit is covered by an approved and effective state or tribal plan?
§ 62.15870If my SSI unit is not listed on the federal plan inventory, am I exempt from this subpart?
Compliance Schedules62.15875 – 62.15915
§ 62.15875What is my final compliance date?
§ 62.15880 [Reserved]
§ 62.15885What must I include in the notifications of achievement of compliance?
§ 62.15890When must I submit the notifications of achievement of compliance?
§ 62.15895What if I do not meet the compliance date?
§ 62.15900How do I comply with the requirement for submittal of a control plan?
§ 62.15905How do I achieve final compliance?
§ 62.15910What must I do if I close my SSI unit and then restart it?
§ 62.15915What must I do if I plan to permanently close my SSI unit and not restart it?
Operator Training and Qualification62.15920 – 62.15950
§ 62.15920What are the operator training and qualification requirements?
§ 62.15925When must the operator training course be completed?
§ 62.15930How do I obtain my operator qualification?
§ 62.15935How do I maintain my operator qualification?
§ 62.15940How do I renew my lapsed operator qualification?
§ 62.15945What if all the qualified operators are temporarily not accessible?
§ 62.15950What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
Emission Limits, Emission Standards and Operating Limits and Requirements62.15955 – 62.15975
§ 62.15955What emission limits and standards must I meet and by when?
§ 62.15960What operating limits and requirements must I meet and by when?
§ 62.15965How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits?
§ 62.15970Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
§ 62.15975 [Reserved]
Initial Compliance Requirements62.15980 – 62.15995
§ 62.15980How and when do I demonstrate initial compliance with the emission limits and standards?
§ 62.15985How do I establish my operating limits?
§ 62.15990By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
§ 62.15995How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
Continuous Compliance Requirements62.16000 – 62.16010
§ 62.16000How and when do I demonstrate continuous compliance with the emission limits and standards?
§ 62.16005How do I demonstrate continuous compliance with my operating limits?
§ 62.16010By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
Performance Testing, Monitoring, and Calibration Requirements62.16015 – 62.16020
§ 62.16015What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
§ 62.16020What are the monitoring and calibration requirements for compliance with my operating limits?
Recordkeeping and Reporting62.16025 – 62.16030
§ 62.16025What records must I keep?
§ 62.16030What reports must I submit?
Title V—Operating Permits62.16035 – 62.16040
§ 62.16035Am I required to apply for and obtain a title V operating permit for my existing SSI unit?
§ 62.16040When must I submit a title V permit application for my existing SSI unit?
Definitions62.16045
§ 62.16045What definitions must I know?
Delegation of Authority62.16050
§ 62.16050What authorities will be retained by the EPA Administrator?
Table 1 to Subpart LLL of Part 62
Compliance Schedule for Existing Sewage Sludge Incineration Units
Table 2 to Subpart LLL of Part 62
Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units
Table 3 to Subpart LLL of Part 62
Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units
Table 4 to Subpart LLL of Part 62
Operating Parameters for Existing Sewage Sludge Incineration Units 1
Table 5 to Subpart LLL of Part 62
Toxic Equivalency Factors
Table 6 to Subpart LLL of Part 62
Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units 1