The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 40Protection of EnvironmentPart / Section
Chapter IEnvironmental Protection Agency1 – 1099
Subchapter CAir Programs50 – 99
Part 60Standards of Performance for New Stationary Sources60.1 – 60.6685
Subpart VVVVStandards of Performance for Large Municipal Waste Combustors60.5680 – 60.6145
Introduction60.5680 – 60.5685
§ 60.5680What does this subpart do?
§ 60.5685When does this subpart become effective?
Applicability60.5690 – 60.5725
§ 60.5690Does this subpart apply to my municipal waste combustor?
§ 60.5695What is a new municipal waste combustor?
§ 60.5700Does this subpart allow any exemptions?
§ 60.5705Do other new source performance standards also apply to my municipal waste combustor?
§ 60.5710What authorities to enforce these federal new source performance standards can the Administrator delegate to a state agency?
§ 60.5715How are these new source performance standards structured?
§ 60.5720Do all five components of these new source performance standards apply at the same time?
§ 60.5725Are there different subcategories of municipal waste combustors within this subpart?
Preconstruction Requirements: Materials Separation Plan60.5730 – 60.5785
§ 60.5730Who must submit a materials separation plan?
§ 60.5735What is a materials separation plan?
§ 60.5740What steps must I complete for my materials separation plan?
§ 60.5745What must I include in my draft materials separation plan?
§ 60.5750How do I make my draft materials separation plan available to the public?
§ 60.5755When must I accept comments on the materials separation plan?
§ 60.5760Where and when must I hold a public meeting on my draft materials separation plan?
§ 60.5765What must I do with any public comments I receive during the public comment period on my draft materials separation plan?
§ 60.5770What must I do with my revised materials separation plan?
§ 60.5775What must I include in the public meeting on my revised materials separation plan and siting analysis?
§ 60.5780What must I do with any public comments I receive on my revised materials separation plan?
§ 60.5785How do I submit my final materials separation plan?
Preconstruction Requirements: Siting Analysis60.5790 – 60.5830
§ 60.5790Who must submit a siting analysis?
§ 60.5795What is a siting analysis?
§ 60.5800What steps must I complete for my siting analysis?
§ 60.5805What must I include in my siting analysis?
§ 60.5810How do I make my siting analysis available to the public?
§ 60.5815When must I accept comments on the siting analysis and revised materials separation plan?
§ 60.5820Where and when must I hold a public meeting on the siting analysis?
§ 60.5825What must I do with any public comments I receive during the public comment period on my siting analysis?
§ 60.5830How do I submit my siting analysis?
Good Combustion Practices: Operator Training60.5835 – 60.5860
§ 60.5835What types of training must I do?
§ 60.5840Who must complete the operator training course? By when?
§ 60.5845Who must complete the site-specific training course?
§ 60.5850What site-specific training must I provide?
§ 60.5855What information must I include in the site-specific operating manual?
§ 60.5860Where must I keep the site-specific operating manual?
Good Combustion Practices: Operator Certification60.5865 – 60.5875
§ 60.5865What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
§ 60.5870After the required date for operator certification, who may operate the municipal waste combustor?
§ 60.5875What if all the certified operators must be temporarily offsite?
Good Combustion Practices: Operating Requirements60.5880 – 60.5885
§ 60.5880What are the operating practice requirements for my municipal waste combustor?
§ 60.5885What happens to the operating requirements during periods of startup, shutdown, and malfunction?
Emission Limits60.5890 – 60.5900
§ 60.5890What pollutants are regulated by this subpart?
§ 60.5895What emission limits must I meet? By when?
§ 60.5900What happens to the emission limits during periods of startup, shutdown, and malfunction?
Continuous Emission Monitoring60.5905 – 60.5955
§ 60.5905What types of continuous emission monitoring must I perform?
§ 60.5910What continuous emission monitoring systems must I install for gaseous pollutants?
§ 60.5915How are the data from the continuous emission monitoring systems used?
§ 60.5920How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.5925What is my schedule for evaluating continuous emission monitoring systems?
§ 60.5930What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
§ 60.5935What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.5940How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.5945What is required for my continuous opacity monitoring system and how are the data used?
§ 60.5950What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
§ 60.5955What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
Stack Testing60.5960 – 60.5985
§ 60.5960What types of stack tests must I conduct?
§ 60.5965How are the stack test data used?
§ 60.5970What schedule must I follow for the stack testing?
§ 60.5975What procedures and test methods must I use to stack test?
§ 60.5980May I conduct stack testing less often?
§ 60.5985May I conduct continuous monitoring or sampling in lieu of stack testing?
Other Monitoring Requirements60.5990 – 60.6015
§ 60.5990Must I meet other requirements for continuous monitoring?
§ 60.5995How do I monitor the load of my municipal waste combustor?
§ 60.6000How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
§ 60.6005How do I monitor the injection rate of activated carbon?
§ 60.6010What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
§ 60.6015What requirements must I meet for estimating my municipal waste combustor capacity?
Recordkeeping60.6020 – 60.6050
§ 60.6020What records must I keep?
§ 60.6025Where must I keep my records and for how long?
§ 60.6030What records must I keep for the materials separation plan and siting analysis?
§ 60.6035What records must I keep for operator training and certification?
§ 60.6040What records must I keep for stack tests?
§ 60.6045What records must I keep for continuously monitored pollutants or parameters?
§ 60.6050What records must I keep for municipal waste combustors that use activated carbon?
Reporting60.6055 – 60.6110
§ 60.6055What reports must I submit before I submit my notice of construction?
§ 60.6060What must I include in my notice of construction?
§ 60.6065What reports must I submit after I submit my notice of construction and in what form?
§ 60.6070What are the appropriate units of measurement for reporting my data?
§ 60.6075When must I submit the initial performance test report?
§ 60.6080What must I include in my initial performance test report?
§ 60.6085When must I submit the annual report?
§ 60.6090What must I include in my annual report?
§ 60.6095What must I do if I am out of compliance with the requirements of this subpart?
§ 60.6100If a semiannual report is required, when must I submit it?
§ 60.6105What must I include in the semiannual out-of-compliance reports?
§ 60.6110Can reporting dates be changed?
Air Curtain Incinerators That Burn 100 Percent Wood Waste, Clean Lumber, and/or Yard Waste60.6115 – 60.6135
§ 60.6115What is an air curtain incinerator?
§ 60.6120What is yard waste?
§ 60.6125What are the emission limits for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6130How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6135What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
Equations60.6140
§ 60.6140What equations must I use?
Definitions60.6145
§ 60.6145What definitions apply to this subpart?
Table 1 to Subpart VVVV
Large Municipal Waste Combustor Carbon Monoxide Limits
Table 2 to Subpart VVVV
Emission Limitations for New Large Municipal Waste Combustors
Table 3 to Subpart VVVV of Part 60
Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 4 to Subpart VVVV
Performance Test Requirements for Compliance With Emissions Limits under § 60.5895