Site Feedback

Title 40

Displaying title 40, up to date as of 7/16/2026. Title 40 was last amended 7/16/2026.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 40Protection of EnvironmentPart / Section
Chapter IEnvironmental Protection Agency1 – 1099
Subchapter CAir Programs50 – 99
Part 60Standards of Performance for New Stationary Sources60.1 – 60.6685
Subpart LLLLStandards of Performance for New Sewage Sludge Incineration Units60.4760 – 60.4930
Introduction60.4760 – 60.4765
§ 60.4760What does this subpart do?
§ 60.4765When does this subpart become effective?
Applicability and Delegation of Authority60.4770 – 60.4795
§ 60.4770Does this subpart apply to my sewage sludge incineration unit?
§ 60.4775What is a new sewage sludge incineration unit?
§ 60.4780What sewage sludge incineration units are exempt from this subpart?
§ 60.4785Who implements and enforces this subpart?
§ 60.4790How are these new source performance standards structured?
§ 60.4795Do all nine components of these new source performance standards apply at the same time?
Preconstruction Siting Analysis60.4800 – 60.4805
§ 60.4800Who must prepare a siting analysis?
§ 60.4805What is a siting analysis?
Operator Training and Qualification60.4810 – 60.4840
§ 60.4810What are the operator training and qualification requirements?
§ 60.4815When must the operator training course be completed?
§ 60.4820How do I obtain my operator qualification?
§ 60.4825How do I maintain my operator qualification?
§ 60.4830How do I renew my lapsed operator qualification?
§ 60.4835What if all the qualified operators are temporarily not accessible?
§ 60.4840What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
Emission Limits, Emission Standards, and Operating Limits and Requirements60.4845 – 60.4861
§ 60.4845What emission limits and standards must I meet and by when?
§ 60.4850What operating limits and requirements must I meet and by when?
§ 60.4855How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, or activated carbon injection, or if I limit emissions in some other manner, to comply with the emission limits?
§ 60.4860Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
§ 60.4861How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?
Initial Compliance Requirements60.4865 – 60.4880
§ 60.4865How and when do I demonstrate initial compliance with the emission limits and standards?
§ 60.4870How do I establish my operating limits?
§ 60.4875By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
§ 60.4880How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
Continuous Compliance Requirements60.4885 – 60.4895
§ 60.4885How and when do I demonstrate continuous compliance with the emission limits and standards?
§ 60.4890How do I demonstrate continuous compliance with my operating limits?
§ 60.4895By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
Performance Testing, Monitoring, and Calibration Requirements60.4900 – 60.4905
§ 60.4900What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
§ 60.4905What are the monitoring and calibration requirements for compliance with my operating limits?
Recordkeeping and Reporting60.4910 – 60.4915
§ 60.4910What records must I keep?
§ 60.4915What reports must I submit?
Title V Operating Permits60.4920 – 60.4925
§ 60.4920Am I required to apply for and obtain a title V operating permit for my unit?
§ 60.4925When must I submit a title V permit application for my new SSI unit?
Definitions60.4930
§ 60.4930What definitions must I know?
Table 1 to Subpart LLLL of Part 60
Emission Limits and Standards for New Fluidized Bed Sewage Sludge Incineration Units
Table 2 to Subpart LLLL of Part 60
Emission Limits and Standards for New Multiple Hearth Sewage Sludge Incineration Units
Table 3 to Subpart LLLL of Part 60
Operating Parameters for New Sewage Sludge Incineration Units a
Table 4 to Subpart LLLL of Part 60
Toxic Equivalency Factors
Table 5 to Subpart LLLL of Part 60
Summary of Reporting Requirements for New Sewage Sludge Incineration Units a