Site Feedback

Title 40

Displaying title 40, up to date as of 7/16/2026. Title 40 was last amended 7/16/2026.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 40Protection of EnvironmentPart / Section
Chapter IEnvironmental Protection Agency1 – 1099
Subchapter CAir Programs50 – 99
Part 60Standards of Performance for New Stationary Sources60.1 – 60.6685
Subpart EEEEStandards of Performance for Other Solid Waste Incineration Units60.2880 – 60.2977
Introduction60.2880 – 60.2881
§ 60.2880What does this subpart do?
§ 60.2881When does this subpart become effective?
Applicability60.2885 – 60.2891
§ 60.2885Does this subpart apply to my incineration unit?
§ 60.2886What is a new incineration unit?
§ 60.2887What combustion units are excluded from this subpart?
§ 60.2888Are air curtain incinerators regulated under this subpart?
§ 60.2889Who implements and enforces this subpart?
§ 60.2890How are these new source performance standards structured?
§ 60.2891Do all components of these new source performance standards apply at the same time?
Preconstruction Siting Analysis60.2894 – 60.2895
§ 60.2894Who must prepare a siting analysis?
§ 60.2895What is a siting analysis?
Waste Management Plan60.2899 – 60.2901
§ 60.2899What is a waste management plan?
§ 60.2900When must I submit my waste management plan?
§ 60.2901What should I include in my waste management plan?
Operator Training and Qualification60.2905 – 60.2911
§ 60.2905What are the operator training and qualification requirements?
§ 60.2906When must the operator training course be completed?
§ 60.2907How do I obtain my operator qualification?
§ 60.2908How do I maintain my operator qualification?
§ 60.2909How do I renew my lapsed operator qualification?
§ 60.2910What site-specific documentation is required?
§ 60.2911What if all the qualified operators are temporarily not accessible?
Emission Limitations and Operating Limits60.2915 – 60.2918
§ 60.2915What emission limitations must I meet and by when?
§ 60.2916What operating limits must I meet and by when?
§ 60.2917What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
§ 60.2918 [Reserved]
Performance Testing60.2922 – 60.2923
§ 60.2922How do I conduct the initial and annual performance test?
§ 60.2923How are the performance test data used?
Initial Compliance Requirements60.2927 – 60.2929
§ 60.2927How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.2928By what date must I conduct the initial performance test?
§ 60.2929What are the substitute means of compliance demonstration requirements for very small municipal waste combustion units and institutional waste incineration units with capacities less than or equal to 10 tons per day?
Continuous Compliance Requirements60.2932 – 60.2935
§ 60.2932How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.2933By what date must I conduct the annual performance test?
§ 60.2934May I conduct performance testing less often?
§ 60.2935May I conduct a repeat performance test to establish new operating limits?
Monitoring60.2939 – 60.2945
§ 60.2939What continuous emission monitoring systems must I install?
§ 60.2940How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.2941What is my schedule for evaluating continuous emission monitoring systems?
§ 60.2942What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.2943How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.2944What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?
§ 60.2945Is there a minimum amount of operating parameter monitoring data I must obtain?
Recordkeeping and Reporting60.2949 – 60.2962
§ 60.2949What records must I keep?
§ 60.2950Where and in what format must I keep my records?
§ 60.2951What reports must I submit?
§ 60.2952What must I submit prior to commencing construction?
§ 60.2953What information must I submit prior to initial startup?
§ 60.2954What information must I submit following my initial performance test?
§ 60.2955When must I submit my annual report?
§ 60.2956What information must I include in my annual report?
§ 60.2957What other reports must I submit if I have a deviation?
§ 60.2958What must I include in the deviation report?
§ 60.2959What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2960Are there any other notifications or reports that I must submit?
§ 60.2961In what form can I submit my reports?
§ 60.2962Can reporting dates be changed?
Title V Operating Permits60.2966 – 60.2967
§ 60.2966Am I required to apply for and obtain a title V permit for my unit?
§ 60.2967When must I submit a title V permit application for my new unit?
Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery60.2969
§ 60.2969What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste60.2970 – 60.2974
§ 60.2970What is an air curtain incinerator?
§ 60.2971What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.2972How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.2973What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.2974 [Reserved]
Equations60.2975
§ 60.2975What equations must I use?
Definitions60.2977
§ 60.2977What definitions must I know?
Table 1 to Subpart EEEE of Part 60
Emission Limitations for OSWI Units That Commenced Construction on or Before August 31, 2020
Table 1a to Subpart EEEE of Part 60
Emission Limitations for OSWI Units With Capacities Greater Than 10 Tons per Day That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
Table 1b to Subpart EEEE of Part 60
Emission Limitations for OSWI Units With Capacities Less Than or Equal to 10 Tons per Day With That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
Table 2 to Subpart EEEE of Part 60
Operating Limits for Incinerators
Table 3 to Subpart EEEE of Part 60
Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 4 to Subpart EEEE of Part 60
Summary of Reporting Requirements