Site Feedback

Title 40

Displaying title 40, up to date as of 7/20/2026. Title 40 was last amended 7/16/2026.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 40Protection of EnvironmentPart / Section
Chapter IEnvironmental Protection Agency1 – 1099
Subchapter CAir Programs50 – 99
Part 60Standards of Performance for New Stationary Sources60.1 – 60.6685
Subpart CCCCStandards of Performance for Commercial and Industrial Solid Waste Incineration Units60.2000 – 60.2265
Introduction60.2000 – 60.2005
§ 60.2000What does this subpart do?
§ 60.2005When did this subpart become effective?
Applicability60.2010 – 60.2041
§ 60.2010Does this subpart apply to my incineration unit?
§ 60.2015What is a new incineration unit?
§ 60.2020What combustion units are exempt from this subpart?
§ 60.2030Who implements and enforces this subpart?
§ 60.2035How are these new source performance standards structured?
§ 60.2040Do all eleven components of these new source performance standards apply at the same time?
§ 60.2041 [Reserved]
Preconstruction Siting Analysis60.2045 – 60.2050
§ 60.2045Who must prepare a siting analysis?
§ 60.2050What is a siting analysis?
Waste Management Plan60.2055 – 60.2065
§ 60.2055What is a waste management plan?
§ 60.2060When must I submit my waste management plan?
§ 60.2065What should I include in my waste management plan?
Operator Training and Qualification60.2070 – 60.2100
§ 60.2070What are the operator training and qualification requirements?
§ 60.2075When must the operator training course be completed?
§ 60.2080How do I obtain my operator qualification?
§ 60.2085How do I maintain my operator qualification?
§ 60.2090How do I renew my lapsed operator qualification?
§ 60.2095What site-specific documentation is required?
§ 60.2100What if all the qualified operators are temporarily not accessible?
Emission Limitations and Operating Limits60.2105 – 60.2115
§ 60.2105What emission limitations must I meet and by when?
§ 60.2110What operating limits must I meet and by when?
§ 60.2115What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
Performance Testing60.2125 – 60.2130
§ 60.2125How do I conduct the initial and annual performance test?
§ 60.2130How are the performance test data used?
Initial Compliance Requirements60.2135 – 60.2141
§ 60.2135How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.2140By what date must I conduct the initial performance test?
§ 60.2141By what date must I conduct the initial air pollution control device inspection?
Continuous Compliance Requirements60.2145 – 60.2160
§ 60.2145How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.2150By what date must I conduct the annual performance test?
§ 60.2151By what date must I conduct the annual air pollution control device inspection?
§ 60.2155May I conduct performance testing less often?
§ 60.2160May I conduct a repeat performance test to establish new operating limits?
Monitoring60.2165 – 60.2170
§ 60.2165What monitoring equipment must I install and what parameters must I monitor?
§ 60.2170Is there a minimum amount of monitoring data I must obtain?
Recordkeeping and Reporting60.2175 – 60.2240
§ 60.2175What records must I keep?
§ 60.2180Where and in what format must I keep my records?
§ 60.2185What reports must I submit?
§ 60.2190What must I submit prior to commencing construction?
§ 60.2195What information must I submit prior to initial startup?
§ 60.2200What information must I submit following my initial performance test?
§ 60.2205When must I submit my annual report?
§ 60.2210What information must I include in my annual report?
§ 60.2215What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2220What must I include in the deviation report?
§ 60.2225What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2230Are there any other notifications or reports that I must submit?
§ 60.2235In what form can I submit my reports?
§ 60.2240Can reporting dates be changed?
Title V Operating Permits60.2242
§ 60.2242Am I required to apply for and obtain a Title V operating permit for my unit?
Air Curtain Incinerators (ACIs)60.2245 – 60.2260
§ 60.2245What is an air curtain incinerator?
§ 60.2250What are the emission limitations for air curtain incinerators?
§ 60.2255How must I monitor opacity for air curtain incinerators?
§ 60.2260What are the recordkeeping and reporting requirements for air curtain incinerators?
Definitions60.2265
§ 60.2265What definitions must I know?
Table 1 to Subpart CCCC of Part 60
Emission Limitations for Incinerators for Which Construction is Commenced After November 30, 1999, But no Later Than June 4, 2010, or for Which Modification or Reconstruction is Commenced on or After June 1, 2001, But no Later Than August 7, 2013
Table 2 to Subpart CCCC of Part 60
Operating Limits for Wet Scrubbers
Table 3 to Subpart CCCC of Part 60
Toxic Equivalency Factors
Table 4 to Subpart CCCC of Part 60
Summary of Reporting Requirements 1
Table 5 to Subpart CCCC of Part 60
Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Table 6 to Subpart CCCC of Part 60
Emission Limitations for Energy Recovery Units That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Table 7 to Subpart CCCC of Part 60
Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013
Table 8 to Subpart CCCC of Part 60
Emission Limitations for Small, Remote Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013