Site Feedback

Title 40

Displaying title 40, up to date as of 8/11/2026. Title 40 was last amended 8/07/2026.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

PART 60—STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES

Authority:

42 U.S.C. 7401 et seq.

Source:

36 FR 24877, Dec. 23, 1971, unless otherwise noted.

Title 40Protection of EnvironmentPart / Section
Chapter IEnvironmental Protection Agency1 – 1099
Subchapter CAir Programs50 – 99
Part 60Standards of Performance for New Stationary Sources60.1 – 60.6685
Subpart AGeneral Provisions60.1 – 60.19
§ 60.1Applicability.
§ 60.2Definitions.
§ 60.3Units and abbreviations.
§ 60.4Address.
§ 60.5Determination of construction or modification.
§ 60.6Review of plans.
§ 60.7Notification and record keeping.
§ 60.8Performance tests.
§ 60.9Availability of information.
§ 60.10State authority.
§ 60.11Compliance with standards and maintenance requirements.
§ 60.12Circumvention.
§ 60.13Monitoring requirements.
§ 60.14Modification.
§ 60.15Reconstruction.
§ 60.16Priority list.
§ 60.17Incorporations by reference.
§ 60.18General control device and work practice requirements.
§ 60.19General notification and reporting requirements.
Table 1 to Subpart A of Part 60
Detection Sensitivity Levels (grams per hour)
Subpart BAdoption and Submittal of State Plans for Designated Facilities60.20 – 60.29
§ 60.20Applicability.
§ 60.21Definitions.
§ 60.22Publication of guideline documents, emission guidelines, and final compliance times.
§ 60.23Adoption and submittal of State plans; public hearings.
§ 60.24Emission standards and compliance schedules.
§ 60.25Emission inventories, source surveillance, reports.
§ 60.26Legal authority.
§ 60.27Actions by the Administrator.
§ 60.28Plan revisions by the State.
§ 60.29Plan revisions by the Administrator.
Subpart BaAdoption and Submittal of State Plans for Designated Facilities60.20a – 60.29a
§ 60.20aApplicability.
§ 60.21aDefinitions.
§ 60.22aPublication of emission guidelines.
§ 60.23aAdoption and submittal of State plans; public hearings.
§ 60.24aStandards of performance and compliance schedules.
§ 60.25aEmission inventories, source surveillance, reports.
§ 60.26aLegal authority.
§ 60.27aActions by the Administrator.
§ 60.28aPlan revisions by the State.
§ 60.29aPlan revisions by the Administrator.
Subpart CEmission Guidelines and Compliance Times60.30 – 60.31
§ 60.30Scope.
§ 60.31Definitions.
Subpart Ca [Reserved]
Subpart CbEmissions Guidelines and Compliance Times for Large Municipal Waste Combustors That are Constructed on or Before September 20, 199460.30b – 60.39b
§ 60.30bScope and delegation of authority.
§ 60.31bDefinitions.
§ 60.32bDesignated facilities.
§ 60.33bEmission guidelines for municipal waste combustor metals, acid gases, organics, and nitrogen oxides.
§ 60.34bEmission guidelines for municipal waste combustor operating practices.
§ 60.35bEmission guidelines for municipal waste combustor operator training and certification.
§ 60.36bEmission guidelines for municipal waste combustor fugitive ash emissions.
§ 60.37bEmission guidelines for air curtain incinerators.
§ 60.38bCompliance and performance testing.
§ 60.39bReporting and recordkeeping guidelines and compliance schedules.
Table 1 to Subpart Cb of Part 60
Nitrogen Oxides Guidelines for Designated Facilities
Table 2 to Subpart Cb of Part 60
Nitrogen Oxides Limits for Existing Designated Facilities Included in an Emissions Averaging Plan at a Municipal Waste Combustor Plant b
Table 3 to Subpart Cb of Part 60
Municipal Waste Combustor Operating Guidelines
Subpart CcEmission Guidelines and Compliance Times for Municipal Solid Waste Landfills60.30c – 60.36c
§ 60.30cScope.
§ 60.31cDefinitions.
§ 60.32cDesignated facilities.
§ 60.33cEmission guidelines for municipal solid waste landfill emissions.
§ 60.34cTest methods and procedures.
§ 60.35cReporting and recordkeeping guidelines.
§ 60.36cCompliance times.
Subpart CdEmissions Guidelines and Compliance Times for Sulfuric Acid Production Units60.30d – 60.32d
§ 60.30dDesignated facilities.
§ 60.31dEmissions guidelines.
§ 60.32dCompliance times.
Subpart CeEmission Guidelines and Compliance Times for Hospital/Medical/Infectious Waste Incinerators60.30e – 60.39e
§ 60.30eScope.
§ 60.31eDefinitions.
§ 60.32eDesignated facilities.
§ 60.33eEmissions guidelines.
§ 60.34eOperator training and qualification guidelines.
§ 60.35eWaste management guidelines.
§ 60.36eInspection guidelines.
§ 60.37eCompliance, performance testing, and monitoring guidelines.
§ 60.38eReporting and recordkeeping guidelines.
§ 60.39eCompliance times.
Table 1A to Subpart Ce of Part 60
Emissions Limits for Small, Medium, and Large HMIWI at Designated Facilities as Defined in § 60.32e(a)(1)
Table 1B to Subpart Ce of Part 60
Emissions Limits for Small, Medium, and Large HMIWI at Designated Facilities as Defined in § 60.32e(a)(1) and (a)(2)
Table 2A to Subpart Ce of Part 60
Emissions Limits for Small HMIWI Which Meet the Criteria Under § 60.33e(b)(1)
Table 2B to Subpart Ce of Part 60
Emissions Limits for Small HMIWI Which Meet the Criteria Under § 60.33e(b)(2)
Subpart CfEmission Guidelines and Compliance Times for Municipal Solid Waste Landfills60.30f – 60.41f
§ 60.30fScope and delegated authorities.
§ 60.31fDesignated facilities.
§ 60.32fCompliance times.
§ 60.33fEmission Guidelines for municipal solid waste landfill emissions.
§ 60.34fOperational standards for collection and control systems.
§ 60.35fTest methods and procedures.
§ 60.36fCompliance provisions.
§ 60.37fMonitoring of operations.
§ 60.38fReporting guidelines.
§ 60.39fRecordkeeping guidelines.
§ 60.40fSpecifications for active collection systems.
§ 60.41fDefinitions.
Subpart DStandards of Performance for Fossil-Fuel-Fired Steam Generators60.40 – 60.46
§ 60.40Applicability and designation of affected facility.
§ 60.41Definitions.
§ 60.42Standard for particulate matter (PM).
§ 60.43Standard for sulfur dioxide (SO2).
§ 60.44Standard for nitrogen oxides (NOX).
§ 60.45Emissions and fuel monitoring.
§ 60.46Test methods and procedures.
Subpart DaStandards of Performance for Electric Utility Steam Generating Units60.40Da – 60.52Da
§ 60.40DaApplicability and designation of affected facility.
§ 60.41DaDefinitions.
§ 60.42DaStandards for particulate matter (PM).
§ 60.43DaStandards for sulfur dioxide (SO2).
§ 60.44DaStandards for nitrogen oxides (NO2).
§ 60.45DaAlternative standards for combined nitrogen oxides (NOX) and carbon monoxide (CO).
§ 60.46Da [Reserved]
§ 60.47DaCommercial demonstration permit.
§ 60.48DaCompliance provisions.
§ 60.49DaEmission monitoring.
§ 60.50DaCompliance determination procedures and methods.
§ 60.51DaReporting requirements.
§ 60.52DaRecordkeeping requirements.
Subpart DbStandards of Performance for Industrial-Commercial-Institutional Steam Generating Units60.40b – 60.49b
§ 60.40bApplicability and delegation of authority.
§ 60.41bDefinitions.
§ 60.42bStandard for sulfur dioxide (SO2).
§ 60.43bStandard for particulate matter (PM).
§ 60.44bStandard for nitrogen oxides (NO2).
§ 60.45bCompliance and performance test methods and procedures for sulfur dioxide.
§ 60.46bCompliance and performance test methods and procedures for particulate matter and nitrogen oxides.
§ 60.47bEmission monitoring for sulfur dioxide.
§ 60.48bEmission monitoring for particulate matter and nitrogen oxides.
§ 60.49bReporting and recordkeeping requirements.
Subpart DcStandards of Performance for Small Industrial-Commercial-Institutional Steam Generating Units60.40c – 60.48c
§ 60.40cApplicability and delegation of authority.
§ 60.41cDefinitions.
§ 60.42cStandard for sulfur dioxide (SO2).
§ 60.43cStandard for particulate matter (PM).
§ 60.44cCompliance and performance test methods and procedures for sulfur dioxide.
§ 60.45cCompliance and performance test methods and procedures for particulate matter.
§ 60.46cEmission monitoring for sulfur dioxide.
§ 60.47cEmission monitoring for particulate matter.
§ 60.48cReporting and recordkeeping requirements.
Subpart EStandards of Performance for Incinerators60.50 – 60.54
§ 60.50Applicability and designation of affected facility.
§ 60.51Definitions.
§ 60.52Standard for particulate matter.
§ 60.53Monitoring of operations.
§ 60.54Test methods and procedures.
Subpart EaStandards of Performance for Municipal Waste Combustors for Which Construction Is Commenced After December 20, 1989 and On or Before September 20, 199460.50a – 60.59a
§ 60.50aApplicability and delegation of authority.
§ 60.51aDefinitions.
§ 60.52aStandard for municipal waste combustor metals.
§ 60.53aStandard for municipal waste combustor organics.
§ 60.54aStandard for municipal waste combustor acid gases.
§ 60.55aStandard for nitrogen oxides.
§ 60.56aStandards for municipal waste combustor operating practices.
§ 60.57a [Reserved]
§ 60.58aCompliance and performance testing.
§ 60.59aReporting and recordkeeping requirements.
Subpart EbStandards of Performance for Large Municipal Waste Combustors for Which Construction is Commenced After September 20, 1994 or for Which Modification or Reconstruction is Commenced After June 19, 199660.50b – 60.59b
§ 60.50bApplicability and delegation of authority.
§ 60.51bDefinitions.
§ 60.52bStandards for municipal waste combustor metals, acid gases, organics, and nitrogen oxides.
§ 60.53bStandards for municipal waste combustor operating practices.
§ 60.54bStandards for municipal waste combustor operator training and certification.
§ 60.55bStandards for municipal waste combustor fugitive ash emissions.
§ 60.56bStandards for air curtain incinerators.
§ 60.57bSiting requirements.
§ 60.58bCompliance and performance testing.
§ 60.59bReporting and recordkeeping requirements.
Subpart EcStandards of Performance for New Stationary Sources: Hospital/Medical/Infectious Waste Incinerators60.50c – 60.58c
§ 60.50cApplicability and delegation of authority.
§ 60.51cDefinitions.
§ 60.52cEmission limits.
§ 60.53cOperator training and qualification requirements.
§ 60.54cSiting requirements.
§ 60.55cWaste management plan.
§ 60.56cCompliance and performance testing.
§ 60.57cMonitoring requirements.
§ 60.58cReporting and recordkeeping requirements.
Table 1A to Subpart Ec of Part 60
Emissions Limits for Small, Medium, and Large HMIWI at Affected Facilities as Defined in § 60.50c(a)(1) and (2)
Table 1B to Subpart Ec of Part 60
Emissions Limits for Small, Medium, and Large HMIWI at Affected Facilities as Defined in § 60.50c(a)(3) and (4)
Table 2 to Subpart Ec of Part 60
Toxic Equivalency Factors
Table 3 to Subpart Ec of Part 60
Operating Parameters To Be Monitored and Minimum Measurement and Recording Frequencies
Subpart FStandards of Performance for Portland Cement Plants60.60 – 60.66
§ 60.60Applicability and designation of affected facility.
§ 60.61Definitions.
§ 60.62Standards.
§ 60.63Monitoring of operations.
§ 60.64Test methods and procedures.
§ 60.65Recordkeeping and reporting requirements.
§ 60.66Delegation of authority.
Subpart GStandards of Performance for Nitric Acid Plants60.70 – 60.74
§ 60.70Applicability and designation of affected facility.
§ 60.71Definitions.
§ 60.72Standard for nitrogen oxides.
§ 60.73Emission monitoring.
§ 60.74Test methods and procedures.
Subpart GaStandards of Performance for Nitric Acid Plants for Which Construction, Reconstruction, or Modification Commenced After October 14, 201160.70a – 60.77a
§ 60.70aApplicability and designation of affected facility.
§ 60.71aDefinitions.
§ 60.72aStandards.
§ 60.73aEmissions testing and monitoring.
§ 60.74aAffirmative defense for violations of emission standards during malfunction.
§ 60.75aCalculations.
§ 60.76aRecordkeeping.
§ 60.77aReporting.
Subpart HStandards of Performance for Sulfuric Acid Plants60.80 – 60.85
§ 60.80Applicability and designation of affected facility.
§ 60.81Definitions.
§ 60.82Standard for sulfur dioxide.
§ 60.83Standard for acid mist.
§ 60.84Emission monitoring.
§ 60.85Test methods and procedures.
Subpart IStandards of Performance for Hot Mix Asphalt Facilities60.90 – 60.93
§ 60.90Applicability and designation of affected facility.
§ 60.91Definitions.
§ 60.92Standard for particulate matter.
§ 60.93Test methods and procedures.
Subpart JStandards of Performance for Petroleum Refineries60.100 – 60.109
§ 60.100Applicability, designation of affected facility, and reconstruction.
§ 60.101Definitions.
§ 60.102Standard for particulate matter.
§ 60.103Standard for carbon monoxide.
§ 60.104Standards for sulfur oxides.
§ 60.105Monitoring of emissions and operations.
§ 60.106Test methods and procedures.
§ 60.107Reporting and recordkeeping requirements.
§ 60.108Performance test and compliance provisions.
§ 60.109Delegation of authority.
Subpart JaStandards of Performance for Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After May 14, 200760.100a – 60.109a
§ 60.100aApplicability, designation of affected facility, and reconstruction.
§ 60.101aDefinitions.
§ 60.102aEmissions limitations.
§ 60.103aDesign, equipment, work practice or operational standards.
§ 60.104aPerformance tests.
§ 60.105aMonitoring of emissions and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU).
§ 60.106aMonitoring of emissions and operations for sulfur recovery plants.
§ 60.107aMonitoring of emissions and operations for fuel gas combustion devices and flares.
§ 60.108aRecordkeeping and reporting requirements.
§ 60.109aDelegation of authority.
Table 1 to Subpart Ja of Part 60
Molar Exhaust Volumes and Molar Heat Content of Fuel Gas Constituents
Subpart KStandards of Performance for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May 19, 197860.110 – 60.113
§ 60.110Applicability and designation of affected facility.
§ 60.111Definitions.
§ 60.112Standard for volatile organic compounds (VOC).
§ 60.113Monitoring of operations.
Subpart KaStandards of Performance for Storage Vessels for Petroleum Liquids for Which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to July 23, 198460.110a – 60.115a
§ 60.110aApplicability and designation of affected facility.
§ 60.111aDefinitions.
§ 60.112aStandard for volatile organic compounds (VOC).
§ 60.113aTesting and procedures.
§ 60.114aAlternative means of emission limitation.
§ 60.115aMonitoring of operations.
Subpart KbStandards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After July 23, 1984, and On or Before October 4, 202360.110b – 60.117b
§ 60.110bApplicability and designation of affected facility.
§ 60.111bDefinitions.
§ 60.112bStandard for volatile organic compounds (VOC).
§ 60.113bTesting and procedures.
§ 60.114bAlternative means of emission limitation.
§ 60.115bReporting and recordkeeping requirements.
§ 60.116bMonitoring of operations.
§ 60.117bDelegation of authority.
Subpart KcStandards of Performance for Volatile Organic Liquid Storage Vessels (Including Petroleum Liquid Storage Vessels) for Which Construction, Reconstruction, or Modification Commenced After October 4, 202360.110c – 60.117c
§ 60.110cApplicability and designation of affected facility.
§ 60.111cDefinitions.
§ 60.112cStandard for volatile organic compounds (VOC).
§ 60.113cTesting, monitoring, and inspection procedures.
§ 60.114cAlternative means of emission limitation.
§ 60.115cRecordkeeping requirements.
§ 60.116cReporting requirements.
§ 60.117cDelegation of authority.
Subpart LStandards of Performance for Secondary Lead Smelters for Which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and On or Before December 1, 202260.120 – 60.125
§ 60.120Applicability and designation of affected facility.
§ 60.121Definitions.
§ 60.122Standard for particulate matter.
§ 60.123Test methods and procedures.
§ 60.124Monitoring requirements.
§ 60.125Notification, recordkeeping, and reporting requirements.
Subpart LaStandards of Performance for Secondary Lead Smelters for Which Construction, Reconstruction, or Modification Commenced After December 1, 202260.120a – 60.125a
§ 60.120aApplicability and designation of affected facility.
§ 60.121aDefinitions.
§ 60.122aStandard for particulate matter.
§ 60.123aTest methods and procedures.
§ 60.124aMonitoring requirements.
§ 60.125aNotification, recordkeeping, and reporting requirements.
Subpart MStandards of Performance for Secondary Brass and Bronze Production Plants60.130 – 60.133
§ 60.130Applicability and designation of affected facility.
§ 60.131Definitions.
§ 60.132Standard for particulate matter.
§ 60.133Test methods and procedures.
Subpart NStandards of Performance for Primary Emissions from Basic Oxygen Process Furnaces for Which Construction is Commenced After June 11, 197360.140 – 60.144
§ 60.140Applicability and designation of affected facility.
§ 60.141Definitions.
§ 60.142Standard for particulate matter.
§ 60.143Monitoring of operations.
§ 60.144Test methods and procedures.
Subpart NaStandards of Performance for Secondary Emissions from Basic Oxygen Process Steelmaking Facilities for Which Construction is Commenced After January 20, 198360.140a – 60.145a
§ 60.140aApplicability and designation of affected facilities.
§ 60.141aDefinitions.
§ 60.142aStandards for particulate matter.
§ 60.143aMonitoring of operations.
§ 60.144aTest methods and procedures.
§ 60.145aCompliance provisions.
Subpart OStandards of Performance for Sewage Treatment Plants60.150 – 60.156
§ 60.150Applicability and designation of affected facility.
§ 60.151Definitions.
§ 60.152Standard for particulate matter.
§ 60.153Monitoring of operations.
§ 60.154Test methods and procedures.
§ 60.155Reporting.
§ 60.156Delegation of authority.
Subpart PStandards of Performance for Primary Copper Smelters60.160 – 60.166
§ 60.160Applicability and designation of affected facility.
§ 60.161Definitions.
§ 60.162Standard for particulate matter.
§ 60.163Standard for sulfur dioxide.
§ 60.164Standard for visible emissions.
§ 60.165Monitoring of operations.
§ 60.166Test methods and procedures.
Subpart QStandards of Performance for Primary Zinc Smelters60.170 – 60.176
§ 60.170Applicability and designation of affected facility.
§ 60.171Definitions.
§ 60.172Standard for particulate matter.
§ 60.173Standard for sulfur dioxide.
§ 60.174Standard for visible emissions.
§ 60.175Monitoring of operations.
§ 60.176Test methods and procedures.
Subpart RStandards of Performance for Primary Lead Smelters60.180 – 60.186
§ 60.180Applicability and designation of affected facility.
§ 60.181Definitions.
§ 60.182Standard for particulate matter.
§ 60.183Standard for sulfur dioxide.
§ 60.184Standard for visible emissions.
§ 60.185Monitoring of operations.
§ 60.186Test methods and procedures.
Subpart SStandards of Performance for Primary Aluminum Reduction Plants60.190 – 60.195
§ 60.190Applicability and designation of affected facility.
§ 60.191Definitions.
§ 60.192Standard for fluorides.
§ 60.193Standard for visible emissions.
§ 60.194Monitoring of operations.
§ 60.195Test methods and procedures.
Subpart TStandards of Performance for the Phosphate Fertilizer Industry: Wet-Process Phosphoric Acid Plants60.200 – 60.205
§ 60.200Applicability and designation of affected facility.
§ 60.201Definitions.
§ 60.202Standard for fluorides.
§ 60.203Monitoring of operations.
§ 60.204Test methods and procedures.
§ 60.205Recordkeeping.
Subpart UStandards of Performance for the Phosphate Fertilizer Industry: Superphosphoric Acid Plants60.210 – 60.215
§ 60.210Applicability and designation of affected facility.
§ 60.211Definitions.
§ 60.212Standard for fluorides.
§ 60.213Monitoring of operations.
§ 60.214Test methods and procedures.
§ 60.215Recordkeeping.
Subpart VStandards of Performance for the Phosphate Fertilizer Industry: Diammonium Phosphate Plants60.220 – 60.225
§ 60.220Applicability and designation of affected facility.
§ 60.221Definitions.
§ 60.222Standard for fluorides.
§ 60.223Monitoring of operations.
§ 60.224Test methods and procedures.
§ 60.225Recordkeeping.
Subpart WStandards of Performance for the Phosphate Fertilizer Industry: Triple Superphosphate Plants60.230 – 60.235
§ 60.230Applicability and designation of affected facility.
§ 60.231Definitions.
§ 60.232Standard for fluorides.
§ 60.233Monitoring of operations.
§ 60.234Test methods and procedures.
§ 60.235Recordkeeping.
Subpart XStandards of Performance for the Phosphate Fertilizer Industry: Granular Triple Superphosphate Storage Facilities60.240 – 60.245
§ 60.240Applicability and designation of affected facility.
§ 60.241Definitions.
§ 60.242Standard for fluorides.
§ 60.243Monitoring of operations.
§ 60.244Test methods and procedures.
§ 60.245Recordkeeping.
Subpart YStandards of Performance for Coal Preparation and Processing Plants60.250 – 60.258
§ 60.250Applicability and designation of affected facility.
§ 60.251Definitions.
§ 60.252Standards for thermal dryers.
§ 60.253Standards for pneumatic coal-cleaning equipment.
§ 60.254Standards for coal processing and conveying equipment, coal storage systems, transfer and loading systems, and open storage piles.
§ 60.255Performance tests and other compliance requirements.
§ 60.256Continuous monitoring requirements.
§ 60.257Test methods and procedures.
§ 60.258Reporting and recordkeeping.
Subpart ZStandards of Performance for Ferroalloy Production Facilities60.260 – 60.266
§ 60.260Applicability and designation of affected facility.
§ 60.261Definitions.
§ 60.262Standard for particulate matter.
§ 60.263Standard for carbon monoxide.
§ 60.264Emission monitoring.
§ 60.265Monitoring of operations.
§ 60.266Test methods and procedures.
Subpart AAStandards of Performance for Steel Plants: Electric Arc Furnaces Constructed After October 21, 1974, and On or Before August 17, 198360.270 – 60.276
§ 60.270Applicability and designation of affected facility.
§ 60.271Definitions.
§ 60.272Standard for particulate matter.
§ 60.273Emission monitoring.
§ 60.274Monitoring of operations.
§ 60.275Test methods and procedures.
§ 60.276Recordkeeping and reporting requirements.
Subpart AAaStandards of Performance for Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarbonization Vessels Constructed After August 17, 1983, and On or Before May 16, 202260.270a – 60.276a
§ 60.270aApplicability and designation of affected facility.
§ 60.271aDefinitions.
§ 60.272aStandard for particulate matter.
§ 60.273aEmission monitoring.
§ 60.274aMonitoring of operations.
§ 60.275aTest methods and procedures.
§ 60.276aRecordkeeping and reporting requirements.
Subpart AAbStandards of Performance for Steel Plants: Electric Arc Furnaces and Argon-Oxygen Decarbonization Vessels Constructed After May 16, 202260.270b – 60.276b
§ 60.270bApplicability and designation of affected facility.
§ 60.271bDefinitions.
§ 60.272bStandard for particulate matter.
§ 60.273bEmission monitoring.
§ 60.274bMonitoring of operations.
§ 60.275bTest methods and procedures.
§ 60.276bRecordkeeping and reporting requirements.
Subpart BBStandards of Performance for Kraft Pulp Mills60.280 – 60.285
§ 60.280Applicability and designation of affected facility.
§ 60.281Definitions.
§ 60.282Standard for particulate matter.
§ 60.283Standard for total reduced sulfur (TRS).
§ 60.284Monitoring of emissions and operations.
§ 60.285Test methods and procedures.
Subpart BBaStandards of Performance for Kraft Pulp Mill Affected Sources for Which Construction, Reconstruction, or Modification Commenced After May 23, 201360.280a – 60.288a
§ 60.280aApplicability and designation of affected facility.
§ 60.281aDefinitions.
§ 60.282aStandard for filterable particulate matter.
§ 60.283aStandard for total reduced sulfur (TRS).
§ 60.284aMonitoring of emissions and operations.
§ 60.285aTest methods and procedures.
§ 60.286aAffirmative defense for violations of emission standards during malfunction.
§ 60.287aRecordkeeping.
§ 60.288aReporting.
Subpart CCStandards of Performance for Glass Manufacturing Plants60.290 – 60.296
§ 60.290Applicability and designation of affected facility.
§ 60.291Definitions.
§ 60.292Standards for particulate matter.
§ 60.293Standards for particulate matter from glass melting furnace with modified-processes.
§§ 60.294-60.295 [Reserved]
§ 60.296Test methods and procedures.
Subpart DDStandards of Performance for Grain Elevators60.300 – 60.304
§ 60.300Applicability and designation of affected facility.
§ 60.301Definitions.
§ 60.302Standard for particulate matter.
§ 60.303Test methods and procedures.
§ 60.304Modifications.
Subpart EEStandards of Performance for Surface Coating of Metal Furniture60.310 – 60.316
§ 60.310Applicability and designation of affected facility.
§ 60.311Definitions and symbols.
§ 60.312Standard for volatile organic compounds (VOC).
§ 60.313Performance tests and compliance provisions.
§ 60.314Monitoring of emissions and operations.
§ 60.315Reporting and recordkeeping requirements.
§ 60.316Test methods and procedures.
Subpart FF [Reserved]
Subpart GGStandards of Performance for Stationary Gas Turbines60.330 – 60.335
§ 60.330Applicability and designation of affected facility.
§ 60.331Definitions.
§ 60.332Standard for nitrogen oxides.
§ 60.333Standard for sulfur dioxide.
§ 60.334Monitoring of operations.
§ 60.335Test methods and procedures.
Subpart HHStandards of Performance for Lime Manufacturing Plants60.340 – 60.344
§ 60.340Applicability and designation of affected facility.
§ 60.341Definitions.
§ 60.342Standard for particulate matter.
§ 60.343Monitoring of emissions and operations.
§ 60.344Test methods and procedures.
Subpart KKStandards of Performance for Lead-Acid Battery Manufacturing Plants for Which Construction, Reconstruction, or Modification Commenced After January 14, 1980, and On or Before February 23, 202260.370 – 60.374
§ 60.370Applicability and designation of affected facility.
§ 60.371Definitions.
§ 60.372Standards for lead.
§ 60.373Monitoring of emissions and operations.
§ 60.374Test methods and procedures.
Subpart KKaStandards of Performance for Lead Acid Battery Manufacturing Plants for Which Construction, Modification or Reconstruction Commenced After February 23, 202260.370a – 60.375a
§ 60.370aApplicability and designation of affected facility.
§ 60.371aDefinitions.
§ 60.372aStandards for lead.
§ 60.373aMonitoring of emissions and operations.
§ 60.374aTest methods and procedures.
§ 60.375aRecordkeeping and reporting requirements.
Subpart LLStandards of Performance for Metallic Mineral Processing Plants60.380 – 60.386
§ 60.380Applicability and designation of affected facility.
§ 60.381Definitions.
§ 60.382Standard for particulate matter.
§ 60.383Reconstruction.
§ 60.384Monitoring of operations.
§ 60.385Recordkeeping and reporting requirements.
§ 60.386Test methods and procedures.
Subpart MMStandards of Performance for Automobile and Light Duty Truck Surface Coating Operations for which Construction, Modification or Reconstruction Commenced After October 5, 1979, and On or Before May 18, 202260.390 – 60.398
§ 60.390Applicability and designation of affected facility.
§ 60.391Definitions.
§ 60.392Standards for volatile organic compounds.
§ 60.393Performance test and compliance provisions.
§ 60.394Monitoring of emissions and operations.
§ 60.395Reporting and recordkeeping requirements.
§ 60.396Reference methods and procedures.
§ 60.397Modifications.
§ 60.398Innovative technology waivers.
Subpart MMaStandards of Performance for Automobile and Light Duty Truck Surface Coating Operations for which Construction, Modification or Reconstruction Commenced After May 18, 202260.390a – 60.397a
§ 60.390aApplicability and designation of affected facility.
§ 60.391aDefinitions.
§ 60.392aStandards for volatile organic compounds.
§ 60.393aPerformance test and compliance provisions.
§ 60.394aAdd-on control device operating limits and monitoring requirements.
§ 60.395aNotifications, reports, and records.
§ 60.396aAdd-on control device destruction efficiency.
§ 60.397aEmission capture system efficiency.
Table 1 to Subpart MMa of Part 60
Operating Limits for Capture Systems and Add-On Control Devices
Appendix A to Subpart MMa of Part 60
Determination of Capture Efficiency of Automobile and Light-Duty Truck Spray Booth Emissions From Solvent-Borne Coatings Using Panel Testing
Subpart NNStandards of Performance for Phosphate Rock Plants60.400 – 60.404
§ 60.400Applicability and designation of affected facility.
§ 60.401Definitions.
§ 60.402Standard for particulate matter.
§ 60.403Monitoring of emissions and operations.
§ 60.404Test methods and procedures.
Subpart PPStandards of Performance for Ammonium Sulfate Manufacture60.420 – 60.424
§ 60.420Applicability and designation of affected facility.
§ 60.421Definitions.
§ 60.422Standards for particulate matter.
§ 60.423Monitoring of operations.
§ 60.424Test methods and procedures.
Subpart QQStandards of Performance for the Graphic Arts Industry: Publication Rotogravure Printing60.430 – 60.435
§ 60.430Applicability and designation of affected facility.
§ 60.431Definitions and notations.
§ 60.432Standard for volatile organic compounds.
§ 60.433Performance test and compliance provisions.
§ 60.434Monitoring of operations and recordkeeping.
§ 60.435Test methods and procedures.
Subpart RRStandards of Performance for Pressure Sensitive Tape and Label Surface Coating Operations60.440 – 60.447
§ 60.440Applicability and designation of affected facility.
§ 60.441Definitions and symbols.
§ 60.442Standard for volatile organic compounds.
§ 60.443Compliance provisions.
§ 60.444Performance test procedures.
§ 60.445Monitoring of operations and recordkeeping.
§ 60.446Test methods and procedures.
§ 60.447Reporting requirements.
Subpart SSStandards of Performance for Industrial Surface Coating: Large Appliances60.450 – 60.456
§ 60.450Applicability and designation of affected facility.
§ 60.451Definitions.
§ 60.452Standard for volatile organic compounds.
§ 60.453Performance test and compliance provisions.
§ 60.454Monitoring of emissions and operations.
§ 60.455Reporting and recordkeeping requirements.
§ 60.456Test methods and procedures.
Subpart TTStandards of Performance for Metal Coil Surface Coating60.460 – 60.466
§ 60.460Applicability and designation of affected facility.
§ 60.461Definitions.
§ 60.462Standards for volatile organic compounds.
§ 60.463Performance test and compliance provisions.
§ 60.464Monitoring of emissions and operations.
§ 60.465Reporting and recordkeeping requirements.
§ 60.466Test methods and procedures.
Subpart UUStandards of Performance for Asphalt Processing and Asphalt Roofing Manufacture60.470 – 60.474
§ 60.470Applicability and designation of affected facilities.
§ 60.471Definitions.
§ 60.472Standards for particulate matter.
§ 60.473Monitoring of operations.
§ 60.474Test methods and procedures.
Subpart VVStandards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for which Construction, Reconstruction, or Modification Commenced After January 5, 1981, and on or Before November 7, 200660.480 – 60.489
§ 60.480Applicability and designation of affected facility.
§ 60.481Definitions.
§ 60.482-1Standards: General.
§ 60.482-2Standards: Pumps in light liquid service.
§ 60.482-3Standards: Compressors.
§ 60.482-4Standards: Pressure relief devices in gas/vapor service.
§ 60.482-5Standards: Sampling connection systems.
§ 60.482-6Standards: Open-ended valves or lines.
§ 60.482-7Standards: Valves in gas/vapor service and in light liquid service.
§ 60.482-8Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and connectors.
§ 60.482-9Standards: Delay of repair.
§ 60.482-10Standards: Closed vent systems and control devices.
§ 60.483-1Alternative standards for valves—allowable percentage of valves leaking.
§ 60.483-2Alternative standards for valves—skip period leak detection and repair.
§ 60.484Equivalence of means of emission limitation.
§ 60.485Test methods and procedures.
§ 60.486Recordkeeping requirements.
§ 60.487Reporting requirements.
§ 60.488Reconstruction.
§ 60.489List of chemicals produced by affected facilities.
Subpart VVaStandards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After November 7, 2006, and on or Before April 25, 202360.480a – 60.489a
§ 60.480aApplicability and designation of affected facility.
§ 60.481aDefinitions.
§ 60.482-1aStandards: General.
§ 60.482-2aStandards: Pumps in light liquid service.
§ 60.482-3aStandards: Compressors.
§ 60.482-4aStandards: Pressure relief devices in gas/vapor service.
§ 60.482-5aStandards: Sampling connection systems.
§ 60.482-6aStandards: Open-ended valves or lines.
§ 60.482-7aStandards: Valves in gas/vapor service and in light liquid service.
§ 60.482-8aStandards: Pumps, valves, and connectors in heavy liquid service and pressure relief devices in light liquid or heavy liquid service.
§ 60.482-9aStandards: Delay of repair.
§ 60.482-10aStandards: Closed vent systems and control devices.
§ 60.483-1aAlternative standards for valves—allowable percentage of valves leaking.
§ 60.483-2aAlternative standards for valves—skip period leak detection and repair.
§ 60.484aEquivalence of means of emission limitation.
§ 60.485aTest methods and procedures.
§ 60.486aRecordkeeping requirements.
§ 60.487aReporting requirements.
§ 60.488aReconstruction.
§ 60.489aList of chemicals produced by affected facilities.
Subpart VVbStandards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After April 25, 202360.480b – 60.489b
§ 60.480bApplicability and designation of affected facility.
§ 60.481bDefinitions.
§ 60.482-1bStandards: General.
§ 60.482-2bStandards: Pumps in light liquid service.
§ 60.482-3bStandards: Compressors.
§ 60.482-4bStandards: Pressure relief devices in gas/vapor service.
§ 60.482-5bStandards: Sampling connection systems.
§ 60.482-6bStandards: Open-ended valves or lines.
§ 60.482-7bStandards: Valves in gas/vapor service and in light liquid service.
§ 60.482-8bStandards: Pumps, valves, and connectors in heavy liquid service and pressure relief devices in light liquid or heavy liquid service.
§ 60.482-9bStandards: Delay of repair.
§ 60.482-10bStandards: Closed vent systems and control devices.
§ 60.482-11bStandards: Connectors in gas/vapor service and in light liquid service.
§ 60.483-1bAlternative standards for valves—allowable percentage of valves leaking.
§ 60.483-2bAlternative standards for valves—skip period leak detection and repair.
§ 60.484bEquivalence of means of emission limitation.
§ 60.485bTest methods and procedures.
§ 60.486bRecordkeeping requirements.
§ 60.487bReporting requirements.
§ 60.488bReconstruction.
§ 60.489bList of chemicals produced by affected facilities.
Subpart WWStandards of Performance for the Beverage Can Surface Coating Industry60.490 – 60.496
§ 60.490Applicability and designation of affected facility.
§ 60.491Definitions.
§ 60.492Standards for volatile organic compounds.
§ 60.493Performance test and compliance provisions.
§ 60.494Monitoring of emissions and operations.
§ 60.495Reporting and recordkeeping requirements.
§ 60.496Test methods and procedures.
Subpart XXStandards of Performance for Bulk Gasoline Terminals That Commenced Construction, Modification, or Reconstruction After December 17, 1980, and On or Before June 10, 202260.500 – 60.506
§ 60.500Applicability and designation of affected facility.
§ 60.501Definitions.
§ 60.502Standard for Volatile Organic Compound (VOC) emissions from bulk gasoline terminals.
§ 60.503Test methods and procedures.
§ 60.504 [Reserved]
§ 60.505Reporting and recordkeeping.
§ 60.506Reconstruction.
Subpart XXaStandards of Performance for Bulk Gasoline Terminals that Commenced Construction, Modification, or Reconstruction After June 10, 202260.500a – 60.505a
§ 60.500aApplicability and designation of affected facility.
§ 60.501aDefinitions.
§ 60.502aStandard for volatile organic compound (VOC) emissions from bulk gasoline terminals.
§ 60.503aTest methods and procedures.
§ 60.504aMonitoring requirements.
§ 60.505aRecordkeeping and reporting.
Subparts YY-ZZ [Reserved]
Subpart AAAStandards of Performance for New Residential Wood Heaters60.530 – 60.539b
§ 60.530Am I subject to this subpart?
§ 60.531What definitions must I know?
§ 60.532What standards and associated requirements must I meet and by when?
§ 60.533What compliance and certification requirements must I meet and by when?
§ 60.534What test methods and procedures must I use to determine compliance with the standards and requirements for certification?
§ 60.535What procedures must I use for EPA approval of a test laboratory or EPA approval of a third-party certifier?
§ 60.536What requirements must I meet for permanent labels, temporary labels (hangtags), and owner's manuals?
§ 60.537What records must I keep and what reports must I submit?
§ 60.538What activities are prohibited under this subpart?
§ 60.539What hearing and appeal procedures apply to me?
§ 60.539aWho implements and enforces this subpart?
§ 60.539bWhat parts of the General Provisions do not apply to me?
Subpart BBBStandards of Performance for the Rubber Tire Manufacturing Industry60.540 – 60.548
§ 60.540Applicability and designation of affected facilities.
§ 60.541Definitions.
§ 60.542Standards for volatile organic compounds.
§ 60.542aAlternate standard for volatile organic compounds.
§ 60.543Performance test and compliance provisions.
§ 60.544Monitoring of operations.
§ 60.545Recordkeeping requirements.
§ 60.546Reporting requirements.
§ 60.547Test methods and procedures.
§ 60.548Delegation of authority.
Subpart CCC [Reserved]
Subpart DDDStandards of Performance for Volatile Organic Compound (VOC) Emissions from the Polymer Manufacturing Industry60.560 – 60.566
§ 60.560Applicability and designation of affected facilities.
§ 60.561Definitions.
§ 60.562-1Standards: Process emissions.
§ 60.562-2Standards: Equipment leaks of VOC.
§ 60.563Monitoring requirements.
§ 60.564Test methods and procedures.
§ 60.565Reporting and recordkeeping requirements.
§ 60.566Delegation of authority.
Subpart EEE [Reserved]
Subpart FFFStandards of Performance for Flexible Vinyl and Urethane Coating and Printing60.580 – 60.585
§ 60.580Applicability and designation of affected facility.
§ 60.581Definitions and symbols.
§ 60.582Standard for volatile organic compounds.
§ 60.583Test methods and procedures.
§ 60.584Monitoring of operations and recordkeeping requirements.
§ 60.585Reporting requirements.
Subpart GGGStandards of Performance for Equipment Leaks of VOC in Petroleum Refineries for which Construction, Reconstruction, or Modification Commenced After January 4, 1983, and on or Before November 7, 200660.590 – 60.593
§ 60.590Applicability and designation of affected facility.
§ 60.591Definitions.
§ 60.592Standards.
§ 60.593Exceptions.
Subpart GGGaStandards of Performance for Equipment Leaks of VOC in Petroleum Refineries for Which Construction, Reconstruction, or Modification Commenced After November 7, 200660.590a – 60.593a
§ 60.590aApplicability and designation of affected facility.
§ 60.591aDefinitions.
§ 60.592aStandards.
§ 60.593aExceptions.
Subpart HHHStandards of Performance for Synthetic Fiber Production Facilities60.600 – 60.604
§ 60.600Applicability and designation of affected facility.
§ 60.601Definitions.
§ 60.602Standard for volatile organic compounds.
§ 60.603Performance test and compliance provisions.
§ 60.604Reporting requirements.
Subpart IIIStandards of Performance for Volatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes After October 21, 1983, and on or Before April 25, 202360.610 – 60.618
§ 60.610Applicability and designation of affected facility.
§ 60.611Definitions.
§ 60.612Standards.
§ 60.613Monitoring of emissions and operations.
§ 60.614Test methods and procedures.
§ 60.615Reporting and recordkeeping requirements.
§ 60.616Reconstruction.
§ 60.617Chemicals affected by subpart III.
§ 60.618Delegation of authority.
Subpart IIIaStandards of Performance for Volatile Organic Compound (VOC) Emissions From the Synthetic Organic Chemical Manufacturing Industry (SOCMI) Air Oxidation Unit Processes for Which Construction, Reconstruction, or Modification Commenced After April 25, 202360.610a – 60.620a
§ 60.610aAm I subject to this subpart?
§ 60.611aWhat definitions must I know?
§ 60.612aWhat standards and associated requirements must I meet?
§ 60.613aWhat are my monitoring, installation, operation, and maintenance requirements?
§ 60.614aWhat test methods and procedures must I use to determine compliance with the standards?
§ 60.615aWhat records must I keep and what reports must I submit?
§ 60.616aWhat do the terms associated with reconstruction mean for this subpart?
§ 60.617aWhat are the chemicals that I must produce to be affected by subpart IIIa?
§ 60.618a [Reserved]
§ 60.619aWhat are my requirements if I use a flare to comply with this subpart?
§ 60.620aWhat are my requirements for closed vent systems?
Table 1 to Subpart IIIa of Part 60
Emission Limits and Standards for Vent Streams
Table 2 to Subpart IIIa of Part 60
Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts Per Million by Volume
Table 3 to Subpart IIIa of Part 60
Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies
Table 4 to Subpart IIIa of Part 60
Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS)
Subpart JJJStandards of Performance for Petroleum Dry Cleaners60.620 – 60.625
§ 60.620Applicability and designation of affected facility.
§ 60.621Definitions.
§ 60.622Standards for volatile organic compounds.
§ 60.623Equivalent equipment and procedures.
§ 60.624Test methods and procedures.
§ 60.625Recordkeeping requirements.
Subpart KKKStandards of Performance for Equipment Leaks of VOC From Onshore Natural Gas Processing Plants for Which Construction, Reconstruction, or Modification Commenced After January 20, 1984, and on or Before August 23, 201160.630 – 60.636
§ 60.630Applicability and designation of affected facility.
§ 60.631Definitions.
§ 60.632Standards.
§ 60.633Exceptions.
§ 60.634Alternative means of emission limitation.
§ 60.635Recordkeeping requirements.
§ 60.636Reporting requirements.
Subpart LLLStandards of Performance for SO2 Emissions From Onshore Natural Gas Processing for Which Construction, Reconstruction, or Modification Commenced After January 20, 1984, and on or Before August 23, 201160.640 – 60.648
§ 60.640Applicability and designation of affected facilities.
§ 60.641Definitions.
§ 60.642Standards for sulfur dioxide.
§ 60.643Compliance provisions.
§ 60.644Test methods and procedures.
§ 60.645 [Reserved]
§ 60.646Monitoring of emissions and operations.
§ 60.647Recordkeeping and reporting requirements.
§ 60.648Optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure.
Subpart MMM [Reserved]
Subpart NNNStandards of Performance for Volatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation Operations After December 30, 1983, and on or Before April 25, 202360.660 – 60.668
§ 60.660Applicability and designation of affected facility.
§ 60.661Definitions.
§ 60.662Standards.
§ 60.663Monitoring of emissions and operations.
§ 60.664Test methods and procedures.
§ 60.665Reporting and recordkeeping requirements.
§ 60.666Reconstruction.
§ 60.667Chemicals affected by subpart NNN.
§ 60.668Delegation of authority.
Subpart NNNaStandards of Performance for Volatile Organic Compound (VOC) Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Distillation Operations for Which Construction, Reconstruction, or Modification Commenced After April 25, 202360.660a – 60.670a
§ 60.660aAm I subject to this subpart?
§ 60.661aWhat definitions must I know?
§ 60.662aWhat standards and associated requirements must I meet?
§ 60.663aWhat are my monitoring, installation, operation, and maintenance requirements?
§ 60.664aWhat test methods and procedures must I use to determine compliance with the standards?
§ 60.665aWhat records must I keep and what reports must I submit?
§ 60.666aWhat do the terms associated with reconstruction mean for this subpart?
§ 60.667aWhat are the chemicals that I must produce to be affected by subpart NNNa?
§ 60.668a [Reserved]
§ 60.669aWhat are my requirements if I use a flare to comply with this subpart?
§ 60.670aWhat are my requirements for closed vent systems?
Table 1 to Subpart NNNa of Part 60
Emission Limits and Standards for Vent Streams
Table 2 to Subpart NNNa of Part 60
Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts per Million by Volume
Table 3 to Subpart NNNa of Part 60
Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies
Table 4 to Subpart NNNa of Part 60
Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS)
Subpart OOOStandards of Performance for Nonmetallic Mineral Processing Plants60.670 – 60.676
§ 60.670Applicability and designation of affected facility.
§ 60.671Definitions.
§ 60.672Standard for particulate matter (PM).
§ 60.673Reconstruction.
§ 60.674Monitoring of operations.
§ 60.675Test methods and procedures.
§ 60.676Reporting and recordkeeping.
Table 1 to Subpart OOO of Part 60
Exceptions to Applicability of Subpart A to Subpart OOO
Table 2 to Subpart OOO of Part 60
Stack Emission Limits for Affected Facilities With Capture Systems
Table 3 to Subpart OOO of Part 60
Fugitive Emission Limits
Subpart PPPStandard of Performance for Wool Fiberglass Insulation Manufacturing Plants60.680 – 60.685
§ 60.680Applicability and designation of affected facility.
§ 60.681Definitions.
§ 60.682Standard for particulate matter.
§ 60.683Monitoring of operations.
§ 60.684Recordkeeping and reporting requirements.
§ 60.685Test methods and procedures.
Subpart QQQStandards of Performance for VOC Emissions From Petroleum Refinery Wastewater Systems60.690 – 60.699
§ 60.690Applicability and designation of affected facility.
§ 60.691Definitions.
§ 60.692-1Standards: General.
§ 60.692-2Standards: Individual drain systems.
§ 60.692-3Standards: Oil-water separators.
§ 60.692-4Standards: Aggregate facility.
§ 60.692-5Standards: Closed vent systems and control devices.
§ 60.692-6Standards: Delay of repair.
§ 60.692-7Standards: Delay of compliance.
§ 60.693-1Alternative standards for individual drain systems.
§ 60.693-2Alternative standards for oil-water separators.
§ 60.694Permission to use alternative means of emission limitation.
§ 60.695Monitoring of operations.
§ 60.696Performance test methods and procedures and compliance provisions.
§ 60.697Recordkeeping requirements.
§ 60.698Reporting requirements.
§ 60.699Delegation of authority.
Subpart RRRSubpart RRR—Standards of Performance for Volatile Organic Compound Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes After June 29, 1990, and on or Before April 25, 202360.700 – 60.708
§ 60.700Applicability and designation of affected facility.
§ 60.701Definitions.
§ 60.702Standards.
§ 60.703Monitoring of emissions and operations.
§ 60.704Test methods and procedures.
§ 60.705Reporting and recordkeeping requirements.
§ 60.706Reconstruction.
§ 60.707Chemicals affected by subpart RRR.
§ 60.708Delegation of authority.
Subpart RRRaStandards of Performance for Volatile Organic Compound Emissions From Synthetic Organic Chemical Manufacturing Industry (SOCMI) Reactor Processes for Which Construction, Reconstruction, or Modification Commenced After April 25, 202360.700a – 60.710a
§ 60.700aAm I subject to this subpart?
§ 60.701aWhat definitions must I know?
§ 60.702aWhat standards and associated requirements must I meet?
§ 60.703aWhat are my monitoring, installation, operation, and maintenance requirements?
§ 60.704aWhat test methods and procedures must I use to determine compliance with the standards?
§ 60.705aWhat records must I keep and what reports must I submit?
§ 60.706aWhat do the terms associated with reconstruction mean for this subpart?
§ 60.707aWhat are the chemicals that I must produce to be affected by subpart RRRa?
§ 60.708a [Reserved]
§ 60.709aWhat are my requirements if I use a flare to comply with this subpart?
§ 60.710aWhat are my requirements for closed vent systems?
Table 1 to Subpart RRRa of Part 60
Emission Limits and Standards for Vent Streams
Table 2 to Subpart RRRa of Part 60
Monitoring Requirements for Complying With 98 Weight-Percent Reduction of Total Organic Compounds Emissions or a Limit of 20 Parts Per Million by Volume
Table 3 to Subpart RRRa of Part 60
Operating Parameters, Operating Parameter Limits and Data Monitoring, Recordkeeping and Compliance Frequencies
Table 4 to Subpart RRRa of Part 60
Calibration and Quality Control Requirements for Continuous Parameter Monitoring System (CPMS)
Subpart SSSStandards of Performance for Magnetic Tape Coating Facilities60.710 – 60.718
§ 60.710Applicability and designation of affected facility.
§ 60.711Definitions, symbols, and cross reference tables.
§ 60.712Standards for volatile organic compounds.
§ 60.713Compliance provisions.
§ 60.714Installation of monitoring devices and recordkeeping.
§ 60.715Test methods and procedures.
§ 60.716Permission to use alternative means of emission limitation.
§ 60.717Reporting and monitoring requirements.
§ 60.718Delegation of authority.
Subpart TTTStandards of Performance for Industrial Surface Coating: Surface Coating of Plastic Parts for Business Machines60.720 – 60.726
§ 60.720Applicability and designation of affected facility.
§ 60.721Definitions.
§ 60.722Standards for volatile organic compounds.
§ 60.723Performance tests and compliance provisions.
§ 60.724Reporting and recordkeeping requirements.
§ 60.725Test methods and procedures.
§ 60.726Delegation of authority.
Subpart TTTaStandards of Performance for Industrial Surface Coating: Surface Coating of Plastic Parts for Business Machines for Which Construction, Reconstruction, or Modification Commenced After June 21, 202260.720a – 60.726a
§ 60.720aApplicability and designation of affected facility.
§ 60.721aDefinitions.
§ 60.722aStandards for volatile organic compounds.
§ 60.723aPerformance tests and compliance provisions.
§ 60.724aReporting and recordkeeping requirements.
§ 60.725aTest methods and procedures.
§ 60.726aDelegation of authority.
Subpart UUUStandards of Performance for Calciners and Dryers in Mineral Industries60.730 – 60.737
§ 60.730Applicability and designation of affected facility.
§ 60.731Definitions.
§ 60.732Standards for particulate matter.
§ 60.733Reconstruction.
§ 60.734Monitoring of emissions and operations.
§ 60.735Recordkeeping and reporting requirements.
§ 60.736Test methods and procedures.
§ 60.737Delegation of authority.
Subpart VVVStandards of Performance for Polymeric Coating of Supporting Substrates Facilities60.740 – 60.748
§ 60.740Applicability and designation of affected facility.
§ 60.741Definitions, symbols, and cross-reference tables.
§ 60.742Standards for volatile organic compounds.
§ 60.743Compliance provisions.
§ 60.744Monitoring requirements.
§ 60.745Test methods and procedures.
§ 60.746Permission to use alternative means of emission limitation.
§ 60.747Reporting and recordkeeping requirements.
§ 60.748Delegation of authority.
Subpart WWWStandards of Performance for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification on or After May 30, 1991, but Before July 18, 201460.750 – 60.759
§ 60.750Applicability, designation of affected facility, and delegation of authority.
§ 60.751Definitions.
§ 60.752Standards for air emissions from municipal solid waste landfills.
§ 60.753Operational standards for collection and control systems.
§ 60.754Test methods and procedures.
§ 60.755Compliance provisions.
§ 60.756Monitoring of operations.
§ 60.757Reporting requirements.
§ 60.758Recordkeeping requirements.
§ 60.759Specifications for active collection systems.
Subpart XXXStandards of Performance for Municipal Solid Waste Landfills That Commenced Construction, Reconstruction, or Modification After July 17, 201460.760 – 60.769
§ 60.760Applicability, designation of affected source, and delegation of authority.
§ 60.761Definitions.
§ 60.762Standards for air emissions from municipal solid waste landfills.
§ 60.763Operational standards for collection and control systems.
§ 60.764Test methods and procedures.
§ 60.765Compliance provisions.
§ 60.766Monitoring of operations.
§ 60.767Reporting requirements.
§ 60.768Recordkeeping requirements.
§ 60.769Specifications for active collection systems.
Subparts YYY-ZZZ [Reserved]
Subpart AAAAStandards of Performance for Small Municipal Waste Combustion Units for Which Construction is Commenced After August 30, 1999 or for Which Modification or Reconstruction is Commenced After June 6, 200160.1000 – 60.1465
Introduction60.1000 – 60.1005
§ 60.1000What does this subpart do?
§ 60.1005When does this subpart become effective?
Applicability60.1010 – 60.1045
§ 60.1010Does this subpart apply to my municipal waste combustion unit?
§ 60.1015What is a new municipal waste combustion unit?
§ 60.1020Does this subpart allow any exemptions?
§ 60.1025Do subpart E new source performance standards also apply to my municipal waste combustion unit?
§ 60.1030Can the Administrator delegate authority to enforce these Federal new source performance standards to a State agency?
§ 60.1035How are these new source performance standards structured?
§ 60.1040Do all five components of these new source performance standards apply at the same time?
§ 60.1045Are there different subcategories of small municipal waste combustion units within this subpart?
Preconstruction Requirements: Materials Separation Plan60.1050 – 60.1105
§ 60.1050Who must submit a materials separation plan?
§ 60.1055What is a materials separation plan?
§ 60.1060What steps must I complete for my materials separation plan?
§ 60.1065What must I include in my draft materials separation plan?
§ 60.1070How do I make my draft materials separation plan available to the public?
§ 60.1075When must I accept comments on the materials separation plan?
§ 60.1080Where and when must I hold a public meeting on my draft materials separation plan?
§ 60.1085What must I do with any public comments I receive during the public comment period on my draft materials separation plan?
§ 60.1090What must I do with my revised materials separation plan?
§ 60.1095What must I include in the public meeting on my revised materials separation plan?
§ 60.1100What must I do with any public comments I receive on my revised materials separation plan?
§ 60.1105How do I submit my final materials separation plan?
Preconstruction Requirements: Siting Analysis60.1110 – 60.1150
§ 60.1110Who must submit a siting analysis?
§ 60.1115What is a siting analysis?
§ 60.1120What steps must I complete for my siting analysis?
§ 60.1125What must I include in my siting analysis?
§ 60.1130How do I make my siting analysis available to the public?
§ 60.1135When must I accept comments on the siting analysis and revised materials separation plan?
§ 60.1140Where and when must I hold a public meeting on the siting analysis?
§ 60.1145What must I do with any public comments I receive during the public comment period on my siting analysis?
§ 60.1150How do I submit my siting analysis?
Good Combustion Practices: Operator Training60.1155 – 60.1180
§ 60.1155What types of training must I do?
§ 60.1160Who must complete the operator training course? By when?
§ 60.1165Who must complete the plant-specific training course?
§ 60.1170What plant-specific training must I provide?
§ 60.1175What information must I include in the plant-specific operating manual?
§ 60.1180Where must I keep the plant-specific operating manual?
Good Combustion Practices: Operator Certification60.1185 – 60.1195
§ 60.1185What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
§ 60.1190After the required date for operator certification, who may operate the municipal waste combustion unit?
§ 60.1195What if all the certified operators must be temporarily offsite?
Good Combustion Practices: Operating Requirements60.1200 – 60.1205
§ 60.1200What are the operating practice requirements for my municipal waste combustion unit?
§ 60.1205What happens to the operating requirements during periods of startup, shutdown, and malfunction?
Emission Limits60.1210 – 60.1220
§ 60.1210What pollutants are regulated by this subpart?
§ 60.1215What emission limits must I meet? By when?
§ 60.1220What happens to the emission limits during periods of startup, shutdown, and malfunction?
Continuous Emission Monitoring60.1225 – 60.1280
§ 60.1225What types of continuous emission monitoring must I perform?
§ 60.1230What continuous emission monitoring systems must I install for gaseous pollutants?
§ 60.1235How are the data from the continuous emission monitoring systems used?
§ 60.1240How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.1245Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems?
§ 60.1250What is my schedule for evaluating continuous emission monitoring systems?
§ 60.1255What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
§ 60.1260What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?
§ 60.1265How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.1270What is required for my continuous opacity monitoring system and how are the data used?
§ 60.1275What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
§ 60.1280What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
Stack Testing60.1285 – 60.1310
§ 60.1285What types of stack tests must I conduct?
§ 60.1290How are the stack test data used?
§ 60.1295What schedule must I follow for the stack testing?
§ 60.1300What test methods must I use to stack test?
§ 60.1305May I conduct stack testing less often?
§ 60.1310May I deviate from the 13-month testing schedule if unforeseen circumstances arise?
Other Monitoring Requirements60.1315 – 60.1335
§ 60.1315Must I meet other requirements for continuous monitoring?
§ 60.1320How do I monitor the load of my municipal waste combustion unit?
§ 60.1325How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
§ 60.1330How do I monitor the injection rate of activated carbon?
§ 60.1335What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable?
Recordkeeping60.1340 – 60.1370
§ 60.1340What records must I keep?
§ 60.1345Where must I keep my records and for how long?
§ 60.1350What records must I keep for the materials separation plan and siting analysis?
§ 60.1355What records must I keep for operator training and certification?
§ 60.1360What records must I keep for stack tests?
§ 60.1365What records must I keep for continuously monitored pollutants or parameters?
§ 60.1370What records must I keep for municipal waste combustion units that use activated carbon?
Reporting60.1375 – 60.1430
§ 60.1375What reports must I submit before I submit my notice of construction?
§ 60.1380What must I include in my notice of construction?
§ 60.1385What reports must I submit after I submit my notice of construction and in what form?
§ 60.1390What are the appropriate units of measurement for reporting my data?
§ 60.1395When must I submit the initial report?
§ 60.1400What must I include in my initial report?
§ 60.1405When must I submit the annual report?
§ 60.1410What must I include in my annual report?
§ 60.1415What must I do if I am out of compliance with the requirements of this subpart?
§ 60.1420If a semiannual report is required, when must I submit it?
§ 60.1425What must I include in the semiannual out-of-compliance reports?
§ 60.1430Can reporting dates be changed?
Air Curtain Incinerators that Burn 100 Percent Yard Waste60.1435 – 60.1455
§ 60.1435What is an air curtain incinerator?
§ 60.1440What is yard waste?
§ 60.1445What are the emission limits for air curtain incinerators that burn 100 percent yard waste?
§ 60.1450How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste?
§ 60.1455What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste?
Equations60.1460
§ 60.1460What equations must I use?
Definitions60.1465
§ 60.1465What definitions must I know?
Table 1 to Subpart AAAA of Part 60
Emission Limits for New Small Municipal Waste Combustion Units
Table 2 to Subpart AAAA of Part 60
Carbon Monoxide Emission Limits for New Small Municipal Waste Combustion Units
Table 3 to Subpart AAAA of Part 60
Requirements for Validating Continuous Emission Monitoring Systems (CEMS)
Table 4 to Subpart AAAA of Part 60
Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 5 to Subpart AAAA of Part 60
Requirements for Stack Tests
Subpart BBBBEmission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 199960.1500 – 60.1940
Introduction60.1500 – 60.1545
§ 60.1500What is the purpose of this subpart?
§ 60.1505Am I affected by this subpart?
§ 60.1510Is a State plan required for all States?
§ 60.1515What must I include in my State plan?
§ 60.1520Is there an approval process for my State plan?
§ 60.1525What if my State plan is not approvable?
§ 60.1530Is there an approval process for a negative declaration letter?
§ 60.1535What compliance schedule must I include in my State plan?
§ 60.1540Are there any State plan requirements for this subpart that supersede the requirements specified in subpart B?
§ 60.1545Does this subpart directly affect municipal waste combustion unit owners and operators in my State?
Applicability of State Plans60.1550 – 60.1565
§ 60.1550What municipal waste combustion units must I address in my State plan?
§ 60.1555Are any small municipal waste combustion units exempt from my State plan?
§ 60.1560Can an affected municipal waste combustion unit reduce its capacity to less than 35 tons per day rather than comply with my State plan?
§ 60.1565What subcategories of small municipal waste combustion units must I include in my State plan?
Use of Model Rule60.1570 – 60.1580
§ 60.1570What is the “model rule” in this subpart?
§ 60.1575How does the model rule relate to the required elements of my State plan?
§ 60.1580What are the principal components of the model rule?
Model Rule—Increments of Progress60.1585 – 60.1640
§ 60.1585What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.1590When must I complete each increment of progress?
§ 60.1595What must I include in the notifications of achievement of my increments of progress?
§ 60.1600When must I submit the notifications of achievement of increments of progress?
§ 60.1605What if I do not meet an increment of progress?
§ 60.1610How do I comply with the increment of progress for submittal of a control plan?
§ 60.1615How do I comply with the increment of progress for awarding contracts?
§ 60.1620How do I comply with the increment of progress for initiating onsite construction?
§ 60.1625How do I comply with the increment of progress for completing onsite construction?
§ 60.1630How do I comply with the increment of progress for achieving final compliance?
§ 60.1635What must I do if I close my municipal waste combustion unit and then restart my municipal waste combustion unit?
§ 60.1640What must I do if I plan to permanently close my municipal waste combustion unit and not restart it?
Model Rule—Good Combustion Practices: Operator Training60.1645 – 60.1670
§ 60.1645What types of training must I do?
§ 60.1650Who must complete the operator training course? By when?
§ 60.1655Who must complete the plant-specific training course?
§ 60.1660What plant-specific training must I provide?
§ 60.1665What information must I include in the plant-specific operating manual?
§ 60.1670Where must I keep the plant-specific operating manual?
Model Rule—Good Combustion Practices: Operator Certification60.1675 – 60.1685
§ 60.1675What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
§ 60.1680After the required date for operator certification, who may operate the municipal waste combustion unit?
§ 60.1685What if all the certified operators must be temporarily offsite?
Model Rule—Good Combustion Practices: Operating Requirements60.1690 – 60.1695
§ 60.1690What are the operating practice requirements for my municipal waste combustion unit?
§ 60.1695What happens to the operating requirements during periods of startup, shutdown, and malfunction?
Model Rule—Emission Limits60.1700 – 60.1710
§ 60.1700What pollutants are regulated by this subpart?
§ 60.1705What emission limits must I meet? By when?
§ 60.1710What happens to the emission limits during periods of startup, shutdown, and malfunction?
Model Rule—Continuous Emission Monitoring60.1715 – 60.1770
§ 60.1715What types of continuous emission monitoring must I perform?
§ 60.1720What continuous emission monitoring systems must I install for gaseous pollutants?
§ 60.1725How are the data from the continuous emission monitoring systems used?
§ 60.1730How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.1735Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems?
§ 60.1740What is my schedule for evaluating continuous emission monitoring systems?
§ 60.1745What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
§ 60.1750What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is the data collection requirement enforceable?
§ 60.1755How do I convert my 1-hour arithmetic averages into appropriate averaging times and units?
§ 60.1760What is required for my continuous opacity monitoring system and how are the data used?
§ 60.1765What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
§ 60.1770What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
Model Rule—Stack Testing60.1775 – 60.1800
§ 60.1775What types of stack tests must I conduct?
§ 60.1780How are the stack test data used?
§ 60.1785What schedule must I follow for the stack testing?
§ 60.1790What test methods must I use to stack test?
§ 60.1795May I conduct stack testing less often?
§ 60.1800May I deviate from the 13-month testing schedule if unforeseen circumstances arise?
Model Rule—Other Monitoring Requirements60.1805 – 60.1825
§ 60.1805Must I meet other requirements for continuous monitoring?
§ 60.1810How do I monitor the load of my municipal waste combustion unit?
§ 60.1815How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
§ 60.1820How do I monitor the injection rate of activated carbon?
§ 60.1825What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is the data collection requirement enforceable?
Model Rule—Recordkeeping60.1830 – 60.1855
§ 60.1830What records must I keep?
§ 60.1835Where must I keep my records and for how long?
§ 60.1840What records must I keep for operator training and certification?
§ 60.1845What records must I keep for stack tests?
§ 60.1850What records must I keep for continuously monitored pollutants or parameters?
§ 60.1855What records must I keep for municipal waste combustion units that use activated carbon?
Model Rule—Reporting60.1860 – 60.1905
§ 60.1860What reports must I submit and in what form?
§ 60.1865What are the appropriate units of measurement for reporting my data?
§ 60.1870When must I submit the initial report?
§ 60.1875What must I include in my initial report?
§ 60.1880When must I submit the annual report?
§ 60.1885What must I include in my annual report?
§ 60.1890What must I do if I am out of compliance with the requirements of this subpart?
§ 60.1895If a semiannual report is required, when must I submit it?
§ 60.1900What must I include in the semiannual out-of-compliance reports?
§ 60.1905Can reporting dates be changed?
Model Rule—Air Curtain Incinerators That Burn 100 Percent Yard Waste60.1910 – 60.1930
§ 60.1910What is an air curtain incinerator?
§ 60.1915What is yard waste?
§ 60.1920What are the emission limits for air curtain incinerators that burn 100 percent yard waste?
§ 60.1925How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste?
§ 60.1930What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard waste?
Equations60.1935
§ 60.1935What equations must I use?
Definitions60.1940
§ 60.1940What definitions must I know?
Table 1 to Subpart BBBB of Part 60
Model Rule—Compliance Schedules and Increments of Progress
Table 2 to Subpart BBBB of Part 60
Model Rule—Class I Emission Limits for Existing Small Municipal Waste Combustion Units a
Table 3 to Subpart BBBB of Part 60
Model Rule—Class I Nitrogen Oxides Emission Limits for Existing Small Municipal Waste Combustion Units a b c
Table 4 to Subpart BBBB of Part 60
Model Rule—Class II Emission Limits for Existing Small Municipal Waste Combustion Unit a
Table 5 to Subpart BBBB of Part 60
Model Rule—Carbon Monoxide Emission Limits for Existing Small Municipal Waste Combustion Units
Table 6 to Subpart BBBB of Part 60
Model Rule—Requirements for Validating Continuous Emission Monitoring Systems (CEMS)
Table 7 to Subpart BBBB of Part 60
Model Rule—Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 8 to Subpart BBBB of Part 60
Model Rule—Requirements for Stack Tests
Subpart CCCCStandards of Performance for Commercial and Industrial Solid Waste Incineration Units60.2000 – 60.2265
Introduction60.2000 – 60.2005
§ 60.2000What does this subpart do?
§ 60.2005When did this subpart become effective?
Applicability60.2010 – 60.2041
§ 60.2010Does this subpart apply to my incineration unit?
§ 60.2015What is a new incineration unit?
§ 60.2020What combustion units are exempt from this subpart?
§ 60.2030Who implements and enforces this subpart?
§ 60.2035How are these new source performance standards structured?
§ 60.2040Do all eleven components of these new source performance standards apply at the same time?
§ 60.2041 [Reserved]
Preconstruction Siting Analysis60.2045 – 60.2050
§ 60.2045Who must prepare a siting analysis?
§ 60.2050What is a siting analysis?
Waste Management Plan60.2055 – 60.2065
§ 60.2055What is a waste management plan?
§ 60.2060When must I submit my waste management plan?
§ 60.2065What should I include in my waste management plan?
Operator Training and Qualification60.2070 – 60.2100
§ 60.2070What are the operator training and qualification requirements?
§ 60.2075When must the operator training course be completed?
§ 60.2080How do I obtain my operator qualification?
§ 60.2085How do I maintain my operator qualification?
§ 60.2090How do I renew my lapsed operator qualification?
§ 60.2095What site-specific documentation is required?
§ 60.2100What if all the qualified operators are temporarily not accessible?
Emission Limitations and Operating Limits60.2105 – 60.2115
§ 60.2105What emission limitations must I meet and by when?
§ 60.2110What operating limits must I meet and by when?
§ 60.2115What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
Performance Testing60.2125 – 60.2130
§ 60.2125How do I conduct the initial and annual performance test?
§ 60.2130How are the performance test data used?
Initial Compliance Requirements60.2135 – 60.2141
§ 60.2135How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.2140By what date must I conduct the initial performance test?
§ 60.2141By what date must I conduct the initial air pollution control device inspection?
Continuous Compliance Requirements60.2145 – 60.2160
§ 60.2145How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.2150By what date must I conduct the annual performance test?
§ 60.2151By what date must I conduct the annual air pollution control device inspection?
§ 60.2155May I conduct performance testing less often?
§ 60.2160May I conduct a repeat performance test to establish new operating limits?
Monitoring60.2165 – 60.2170
§ 60.2165What monitoring equipment must I install and what parameters must I monitor?
§ 60.2170Is there a minimum amount of monitoring data I must obtain?
Recordkeeping and Reporting60.2175 – 60.2240
§ 60.2175What records must I keep?
§ 60.2180Where and in what format must I keep my records?
§ 60.2185What reports must I submit?
§ 60.2190What must I submit prior to commencing construction?
§ 60.2195What information must I submit prior to initial startup?
§ 60.2200What information must I submit following my initial performance test?
§ 60.2205When must I submit my annual report?
§ 60.2210What information must I include in my annual report?
§ 60.2215What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2220What must I include in the deviation report?
§ 60.2225What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2230Are there any other notifications or reports that I must submit?
§ 60.2235In what form can I submit my reports?
§ 60.2240Can reporting dates be changed?
Title V Operating Permits60.2242
§ 60.2242Am I required to apply for and obtain a Title V operating permit for my unit?
Air Curtain Incinerators (ACIs)60.2245 – 60.2260
§ 60.2245What is an air curtain incinerator?
§ 60.2250What are the emission limitations for air curtain incinerators?
§ 60.2255How must I monitor opacity for air curtain incinerators?
§ 60.2260What are the recordkeeping and reporting requirements for air curtain incinerators?
Definitions60.2265
§ 60.2265What definitions must I know?
Table 1 to Subpart CCCC of Part 60
Emission Limitations for Incinerators for Which Construction is Commenced After November 30, 1999, But no Later Than June 4, 2010, or for Which Modification or Reconstruction is Commenced on or After June 1, 2001, But no Later Than August 7, 2013
Table 2 to Subpart CCCC of Part 60
Operating Limits for Wet Scrubbers
Table 3 to Subpart CCCC of Part 60
Toxic Equivalency Factors
Table 4 to Subpart CCCC of Part 60
Summary of Reporting Requirements 1
Table 5 to Subpart CCCC of Part 60
Emission Limitations for Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Table 6 to Subpart CCCC of Part 60
Emission Limitations for Energy Recovery Units That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Table 7 to Subpart CCCC of Part 60
Emission Limitations for Waste-Burning Kilns That Commenced Construction After June 4, 2010, or Reconstruction or Modification After August 7, 2013
Table 8 to Subpart CCCC of Part 60
Emission Limitations for Small, Remote Incinerators That Commenced Construction After June 4, 2010, or That Commenced Reconstruction or Modification After August 7, 2013
Subpart DDDDEmissions Guidelines and Compliance Times for Commercial and Industrial Solid Waste Incineration Units60.2500 – 60.2875
Introduction60.2500 – 60.2545
§ 60.2500What is the purpose of this subpart?
§ 60.2505Am I affected by this subpart?
§ 60.2510Is a state plan required for all states?
§ 60.2515What must I include in my state plan?
§ 60.2520Is there an approval process for my state plan?
§ 60.2525What if my state plan is not approvable?
§ 60.2530Is there an approval process for a negative declaration letter?
§ 60.2535What compliance schedule must I include in my state plan?
§ 60.2540Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B?
§ 60.2541In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d)/129(b)(2) obligations?
§ 60.2542What authorities will not be delegated to state, local, or tribal agencies?
§ 60.2545Does this subpart directly affect CISWI owners and operators in my state?
Applicability of State Plans60.2550 – 60.2556
§ 60.2550What CISWIs must I address in my state plan?
§ 60.2555What combustion units are exempt from my state plan?
§ 60.2556 [Reserved]
Use of Model Rule60.2560 – 60.2570
§ 60.2560What is the “model rule” in this subpart?
§ 60.2565How does the model rule relate to the required elements of my state plan?
§ 60.2570What are the principal components of the model rule?
Model Rule—Increments of Progress60.2575 – 60.2615
§ 60.2575What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.2580When must I complete each increment of progress?
§ 60.2585What must I include in the notifications of achievement of increments of progress?
§ 60.2590When must I submit the notifications of achievement of increments of progress?
§ 60.2595What if I do not meet an increment of progress?
§ 60.2600How do I comply with the increment of progress for submittal of a control plan?
§ 60.2605How do I comply with the increment of progress for achieving final compliance?
§ 60.2610What must I do if I close my CISWI and then restart it?
§ 60.2615What must I do if I plan to permanently close my CISWI and not restart it?
Model Rule—Waste Management Plan60.2620 – 60.2630
§ 60.2620What is a waste management plan?
§ 60.2625When must I submit my waste management plan?
§ 60.2630What should I include in my waste management plan?
Model Rule—Operator Training and Qualification60.2635 – 60.2665
§ 60.2635What are the operator training and qualification requirements?
§ 60.2640When must the operator training course be completed?
§ 60.2645How do I obtain my operator qualification?
§ 60.2650How do I maintain my operator qualification?
§ 60.2655How do I renew my lapsed operator qualification?
§ 60.2660What site-specific documentation is required?
§ 60.2665What if all the qualified operators are temporarily not accessible?
Model Rule—Emission Limitations and Operating Limits60.2670 – 60.2680
§ 60.2670What emission limitations must I meet and by when?
§ 60.2675What operating limits must I meet and by when?
§ 60.2680What if I do not use a wet scrubber, fabric filter, activated carbon injection, selective noncatalytic reduction, an electrostatic precipitator, or a dry scrubber to comply with the emission limitations?
Model Rule—Performance Testing60.2690 – 60.2695
§ 60.2690How do I conduct the initial and annual performance test?
§ 60.2695How are the performance test data used?
Model Rule—Initial Compliance Requirements60.2700 – 60.2706
§ 60.2700How do I demonstrate initial compliance with the amended emission limitations and establish the operating limits?
§ 60.2705By what date must I conduct the initial performance test?
§ 60.2706By what date must I conduct the initial air pollution control device inspection?
Model Rule—Continuous Compliance Requirements60.2710 – 60.2725
§ 60.2710How do I demonstrate continuous compliance with the amended emission limitations and the operating limits?
§ 60.2715By what date must I conduct the annual performance test?
§ 60.2716By what date must I conduct the annual air pollution control device inspection?
§ 60.2720May I conduct performance testing less often?
§ 60.2725May I conduct a repeat performance test to establish new operating limits?
Model Rule—Monitoring60.2730 – 60.2735
§ 60.2730What monitoring equipment must I install and what parameters must I monitor?
§ 60.2735Is there a minimum amount of monitoring data I must obtain?
Model Rule—Recordkeeping and Reporting60.2740 – 60.2800
§ 60.2740What records must I keep?
§ 60.2745Where and in what format must I keep my records?
§ 60.2750What reports must I submit?
§ 60.2755When must I submit my waste management plan?
§ 60.2760What information must I submit following my initial performance test?
§ 60.2765When must I submit my annual report?
§ 60.2770What information must I include in my annual report?
§ 60.2775What else must I report if I have a deviation from the operating limits or the emission limitations?
§ 60.2780What must I include in the deviation report?
§ 60.2785What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2790Are there any other notifications or reports that I must submit?
§ 60.2795In what form can I submit my reports?
§ 60.2800Can reporting dates be changed?
Model Rule—Title V Operating Permits60.2805
§ 60.2805Am I required to apply for and obtain a Title V operating permit for my unit?
Model Rule—Air Curtain Incinerators (ACIs)60.2810 – 60.2870
§ 60.2810What is an air curtain incinerator?
§ 60.2815What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.2820When must I complete each increment of progress?
§ 60.2825What must I include in the notifications of achievement of increments of progress?
§ 60.2830When must I submit the notifications of achievement of increments of progress?
§ 60.2835What if I do not meet an increment of progress?
§ 60.2840How do I comply with the increment of progress for submittal of a control plan?
§ 60.2845How do I comply with the increment of progress for achieving final compliance?
§ 60.2850What must I do if I close my air curtain incinerator and then restart it?
§ 60.2855What must I do if I plan to permanently close my air curtain incinerator and not restart it?
§ 60.2860What are the emission limitations for air curtain incinerators?
§ 60.2865How must I monitor opacity for air curtain incinerators?
§ 60.2870What are the recordkeeping and reporting requirements for air curtain incinerators?
Model Rule—Definitions60.2875
§ 60.2875What definitions must I know?
Table 1 to Subpart DDDD of Part 60
Model Rule—Increments of Progress and Compliance Schedules
Table 2 to Subpart DDDD of Part 60
Model Rule—Emission Limitations That Apply to Incinerators Before [Date To Be Specified in State Plan] 1
Table 3 to Subpart DDDD of Part 60
Model Rule—Operating Limits for Wet Scrubbers
Table 4 to Subpart DDDD of Part 60
Model Rule—Toxic Equivalency Factors
Table 5 to Subpart DDDD of Part 60
Model Rule—Summary of Reporting Requirements 1
Table 6 to Subpart DDDD of Part 60
Model Rule—Emission Limitations That Apply to Incinerators on and After [Date To Be Specified in State Plan] 1
Table 7 to Subpart DDDD of Part 60
Model Rule—Emission Limitations That Apply to Energy Recovery Units After May 20, 2011
Table 8 to Subpart DDDD of Part 60
Model Rule—Emission Limitations That Apply to Waste-Burning Kilns After May 20, 2011
Table 9 to Subpart DDDD of Part 60
Model Rule—Emission Limitations That Apply to Small, Remote Incinerators After May 20, 2011 [Date To Be Specified in State Plan] 1
Subpart EEEEStandards of Performance for Other Solid Waste Incineration Units60.2880 – 60.2977
Introduction60.2880 – 60.2881
§ 60.2880What does this subpart do?
§ 60.2881When does this subpart become effective?
Applicability60.2885 – 60.2891
§ 60.2885Does this subpart apply to my incineration unit?
§ 60.2886What is a new incineration unit?
§ 60.2887What combustion units are excluded from this subpart?
§ 60.2888Are air curtain incinerators regulated under this subpart?
§ 60.2889Who implements and enforces this subpart?
§ 60.2890How are these new source performance standards structured?
§ 60.2891Do all components of these new source performance standards apply at the same time?
Preconstruction Siting Analysis60.2894 – 60.2895
§ 60.2894Who must prepare a siting analysis?
§ 60.2895What is a siting analysis?
Waste Management Plan60.2899 – 60.2901
§ 60.2899What is a waste management plan?
§ 60.2900When must I submit my waste management plan?
§ 60.2901What should I include in my waste management plan?
Operator Training and Qualification60.2905 – 60.2911
§ 60.2905What are the operator training and qualification requirements?
§ 60.2906When must the operator training course be completed?
§ 60.2907How do I obtain my operator qualification?
§ 60.2908How do I maintain my operator qualification?
§ 60.2909How do I renew my lapsed operator qualification?
§ 60.2910What site-specific documentation is required?
§ 60.2911What if all the qualified operators are temporarily not accessible?
Emission Limitations and Operating Limits60.2915 – 60.2918
§ 60.2915What emission limitations must I meet and by when?
§ 60.2916What operating limits must I meet and by when?
§ 60.2917What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
§ 60.2918 [Reserved]
Performance Testing60.2922 – 60.2923
§ 60.2922How do I conduct the initial and annual performance test?
§ 60.2923How are the performance test data used?
Initial Compliance Requirements60.2927 – 60.2929
§ 60.2927How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.2928By what date must I conduct the initial performance test?
§ 60.2929What are the substitute means of compliance demonstration requirements for very small municipal waste combustion units and institutional waste incineration units with capacities less than or equal to 10 tons per day?
Continuous Compliance Requirements60.2932 – 60.2935
§ 60.2932How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.2933By what date must I conduct the annual performance test?
§ 60.2934May I conduct performance testing less often?
§ 60.2935May I conduct a repeat performance test to establish new operating limits?
Monitoring60.2939 – 60.2945
§ 60.2939What continuous emission monitoring systems must I install?
§ 60.2940How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.2941What is my schedule for evaluating continuous emission monitoring systems?
§ 60.2942What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.2943How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.2944What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?
§ 60.2945Is there a minimum amount of operating parameter monitoring data I must obtain?
Recordkeeping and Reporting60.2949 – 60.2962
§ 60.2949What records must I keep?
§ 60.2950Where and in what format must I keep my records?
§ 60.2951What reports must I submit?
§ 60.2952What must I submit prior to commencing construction?
§ 60.2953What information must I submit prior to initial startup?
§ 60.2954What information must I submit following my initial performance test?
§ 60.2955When must I submit my annual report?
§ 60.2956What information must I include in my annual report?
§ 60.2957What other reports must I submit if I have a deviation?
§ 60.2958What must I include in the deviation report?
§ 60.2959What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.2960Are there any other notifications or reports that I must submit?
§ 60.2961In what form can I submit my reports?
§ 60.2962Can reporting dates be changed?
Title V Operating Permits60.2966 – 60.2967
§ 60.2966Am I required to apply for and obtain a title V permit for my unit?
§ 60.2967When must I submit a title V permit application for my new unit?
Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery60.2969
§ 60.2969What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste60.2970 – 60.2974
§ 60.2970What is an air curtain incinerator?
§ 60.2971What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.2972How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.2973What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.2974 [Reserved]
Equations60.2975
§ 60.2975What equations must I use?
Definitions60.2977
§ 60.2977What definitions must I know?
Table 1 to Subpart EEEE of Part 60
Emission Limitations for OSWI Units That Commenced Construction on or Before August 31, 2020
Table 1a to Subpart EEEE of Part 60
Emission Limitations for OSWI Units With Capacities Greater Than 10 Tons per Day That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
Table 1b to Subpart EEEE of Part 60
Emission Limitations for OSWI Units With Capacities Less Than or Equal to 10 Tons per Day With That Commenced Construction After August 31, 2020 or Commenced Reconstruction or Modification on or After December 29, 2025
Table 2 to Subpart EEEE of Part 60
Operating Limits for Incinerators
Table 3 to Subpart EEEE of Part 60
Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 4 to Subpart EEEE of Part 60
Summary of Reporting Requirements
Subpart FFFFEmission Guidelines and Compliance Times for Other Solid Waste Incineration Units60.2980 – 60.3078
Introduction60.2980 – 60.2990
§ 60.2980What is the purpose of this subpart?
§ 60.2981Am I affected by this subpart?
§ 60.2982Is a state plan required for all States?
§ 60.2983What must I include in my State plan?
§ 60.2984Is there an approval process for my State plan?
§ 60.2985What if my state plan is not approvable?
§ 60.2986Is there an approval process for a negative declaration letter?
§ 60.2987What compliance schedule must I include in my state plan?
§ 60.2988Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B of this part?
§ 60.2989Does this subpart directly affect incineration unit owners and operators in my state?
§ 60.2990What Authorities are withheld by EPA?
Applicability of State Plans60.2991 – 60.2994
§ 60.2991What incineration units must I address in my state plan?
§ 60.2992What is an existing incineration unit?
§ 60.2993Are any combustion units excluded from my state plan?
§ 60.2994Are air curtain incinerators regulated under this subpart?
Model Rule—Use of Model Rule60.2996 – 60.2998
§ 60.2996What is the purpose of the “model rule” in this subpart?
§ 60.2997How does the model rule relate to the required elements of my State plan?
§ 60.2998What are the principal components of the model rule?
Model Rule—Compliance Schedule60.3000 – 60.3003
§ 60.3000When must I comply?
§ 60.3001What must I do if I close my OSWI unit and then restart it?
§ 60.3002What must I do if I plan to permanently close my OSWI unit and not restart it?
§ 60.3003What else must I do prior to the compliance date if I meet the substitute means of compliance demonstration?
Model Rule—Waste Management Plan60.3010 – 60.3012
§ 60.3010What is a waste management plan?
§ 60.3011When must I submit my waste management plan?
§ 60.3012What should I include in my waste management plan?
Model Rule—Operator Training and Qualification60.3014 – 60.3020
§ 60.3014What are the operator training and qualification requirements?
§ 60.3015When must the operator training course be completed?
§ 60.3016How do I obtain my operator qualification?
§ 60.3017How do I maintain my operator qualification?
§ 60.3018How do I renew my lapsed operator qualification?
§ 60.3019What site-specific documentation is required?
§ 60.3020What if all the qualified operators are temporarily not accessible?
Model Rule—Emission Limitations and Operating Limits60.3022 – 60.3025
§ 60.3022What emission limitations must I meet and by when?
§ 60.3023What operating limits must I meet and by when?
§ 60.3024What if I do not use a wet scrubber, dry scrubber, electrostatic precipitator, or fabric filter to comply with the emission limitations?
§ 60.3025 [Reserved]
Model Rule—Performance Testing60.3027 – 60.3028
§ 60.3027How do I conduct the initial and annual performance test?
§ 60.3028How are the performance test data used?
Model Rule—Initial Compliance Requirements60.3030 – 60.3032
§ 60.3030How do I demonstrate initial compliance with the emission limitations and establish the operating limits?
§ 60.3031By what date must I conduct the initial performance test?
§ 60.3032What are the substitute means of compliance demonstration requirements for very small municipal waste combustion units and institutional waste incineration units with capacities less than or equal to 10 tons per day?
Model Rule—Continuous Compliance Requirements60.3033 – 60.3036
§ 60.3033How do I demonstrate continuous compliance with the emission limitations and the operating limits?
§ 60.3034By what date must I conduct the annual performance test?
§ 60.3035May I conduct performance testing less often?
§ 60.3036May I conduct a repeat performance test to establish new operating limits?
Model Rule—Monitoring60.3038 – 60.3044
§ 60.3038What continuous emission monitoring systems must I install?
§ 60.3039How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.3040What is my schedule for evaluating continuous emission monitoring systems?
§ 60.3041What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.3042How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.3043What operating parameter monitoring equipment must I install, or what operating parameters must I monitor?
§ 60.3044Is there a minimum amount of operating parameter monitoring data I must obtain?
Model Rule—Recordkeeping and Reporting60.3046 – 60.3057
§ 60.3046What records must I keep?
§ 60.3047Where and in what format must I keep my records?
§ 60.3048What reports must I submit?
§ 60.3049What information must I submit following my initial performance test?
§ 60.3050When must I submit my annual report?
§ 60.3051What information must I include in my annual report?
§ 60.3052What other reports must I submit if I have a deviation?
§ 60.3053What must I include in the deviation report?
§ 60.3054What else must I report if I have a deviation from the requirement to have a qualified operator accessible?
§ 60.3055Are there any other notifications or reports that I must submit?
§ 60.3056In what form can I submit my reports?
§ 60.3057Can reporting dates be changed?
Model Rule—Title V Operating Permits60.3059 – 60.3060
§ 60.3059Am I required to apply for and obtain a title V operating permit for my unit?
§ 60.3060When must I submit a title V permit application for my existing unit?
Model Rule—Temporary-Use Incinerators and Air Curtain Incinerators Used in Disaster Recovery60.3061
§ 60.3061What are the requirements for temporary-use incinerators and air curtain incinerators used in disaster recovery?
Model Rule—Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard Waste60.3062 – 60.3069
§ 60.3062What is an air curtain incinerator?
§ 60.3063When must I comply if my air curtain incinerator burns only wood waste, clean lumber, and yard waste?
§ 60.3064What must I do if I close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and then restart it?
§ 60.3065What must I do if I plan to permanently close my air curtain incinerator that burns only wood waste, clean lumber, and yard waste and not restart it?
§ 60.3066What are the emission limitations for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3067How must I monitor opacity for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3068What are the recordkeeping and reporting requirements for air curtain incinerators that burn only wood waste, clean lumber, and yard waste?
§ 60.3069 [Reserved]
Model Rule—Equations60.3076
§ 60.3076What equations must I use?
Model Rule—Definitions60.3078
§ 60.3078What definitions must I know?
Table 1 to Subpart FFFF of Part 60
Model Rule—Compliance Schedule
Table 2 to Subpart FFFF of Part 60
Model Rule—Emission Limitations for That Apply to OSWI Units With Capacities Greater Than 10 Tons per Day
Table 2a to Subpart FFFF of Part 60
Model Rule—Emission Limitations That Apply to OSWI Units With Capacities Less Than or Equal to 10 Tons per Day On or After [Date To Be Specified in State Plan] a
Table 3 to Subpart FFFF of Part 60
Model Rule—Operating Limits for Incinerators
Table 4 to Subpart FFFF of Part 60
Model Rule—Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 5 to Subpart FFFF of Part 60
Model Rule—Summary of Reporting Requirements
Subparts GGGG-HHHH [Reserved]
Subpart IIIIStandards of Performance for Stationary Compression Ignition Internal Combustion Engines60.4200 – 60.4219
What This Subpart Covers60.4200
§ 60.4200Am I subject to this subpart?
Emission Standards for Manufacturers60.4201 – 60.4203
§ 60.4201What emission standards must I meet for non-emergency engines if I am a stationary CI internal combustion engine manufacturer?
§ 60.4202What emission standards must I meet for emergency engines if I am a stationary CI internal combustion engine manufacturer?
§ 60.4203How long must my engines meet the emission standards if I am a manufacturer of stationary CI internal combustion engines?
Emission Standards for Owners and Operators60.4204 – 60.4206
§ 60.4204What emission standards must I meet for non-emergency engines if I am an owner or operator of a stationary CI internal combustion engine?
§ 60.4205What emission standards must I meet for emergency engines if I am an owner or operator of a stationary CI internal combustion engine?
§ 60.4206How long must I meet the emission standards if I am an owner or operator of a stationary CI internal combustion engine?
Fuel Requirements for Owners and Operators60.4207
§ 60.4207What fuel requirements must I meet if I am an owner or operator of a stationary CI internal combustion engine subject to this subpart?
Other Requirements for Owners and Operators60.4208 – 60.4209
§ 60.4208What is the deadline for importing or installing stationary CI ICE produced in previous model years?
§ 60.4209What are the monitoring requirements if I am an owner or operator of a stationary CI internal combustion engine?
Compliance Requirements60.4210 – 60.4211
§ 60.4210What are my compliance requirements if I am a stationary CI internal combustion engine manufacturer?
§ 60.4211What are my compliance requirements if I am an owner or operator of a stationary CI internal combustion engine?
Testing Requirements for Owners and Operators60.4212 – 60.4213
§ 60.4212What test methods and other procedures must I use if I am an owner or operator of a stationary CI internal combustion engine with a displacement of less than 30 liters per cylinder?
§ 60.4213What test methods and other procedures must I use if I am an owner or operator of a stationary CI internal combustion engine with a displacement of greater than or equal to 30 liters per cylinder?
Notification, Reports, and Records for Owners and Operators60.4214
§ 60.4214What are my notification, reporting, and recordkeeping requirements if I am an owner or operator of a stationary CI internal combustion engine?
Special Requirements60.4215 – 60.4217
§ 60.4215What requirements must I meet for engines used in Guam, American Samoa, or the Commonwealth of the Northern Mariana Islands?
§ 60.4216What requirements must I meet for engines used in Alaska?
§ 60.4217What emission standards must I meet if I am an owner or operator of a stationary internal combustion engine using special fuels?
General Provisions60.4218
§ 60.4218What General Provisions and confidential information provisions apply to me?
Definitions60.4219
§ 60.4219What definitions apply to this subpart?
Table 1 to Subpart IIII of Part 60
Emission Standards for Stationary Pre-2007 Model Year Engines With a Displacement of <10 Liters per Cylinder and 2007-2010 Model Year Engines >2,237 KW (3,000 HP) and With a Displacement of <10 Liters per Cylinder
Table 2 to Subpart IIII of Part 60
Emission Standards for 2008 Model Year and Later Emergency Stationary CI ICE <37 KW (50 HP) With a Displacement of <10 Liters per Cylinder
Table 3 to Subpart IIII of Part 60
Certification Requirements for Stationary Fire Pump Engines
Table 4 to Subpart IIII of Part 60
Emission Standards for Stationary Fire Pump Engines
Table 5 to Subpart IIII of Part 60
Labeling and Recordkeeping Requirements for New Stationary Emergency Engines
Table 6 to Subpart IIII of Part 60
Optional 3-Mode Test Cycle for Stationary Fire Pump Engines
Table 7 to Subpart IIII of Part 60
Requirements for Performance Tests for Stationary CI ICE With a Displacement of ≥30 Liters per Cylinder
Table 8 to Subpart IIII of Part 60
Applicability of General Provisions to Subpart IIII
Subpart JJJJStandards of Performance for Stationary Spark Ignition Internal Combustion Engines60.4230 – 60.4248
What This Subpart Covers60.4230
§ 60.4230Am I subject to this subpart?
Emission Standards for Manufacturers60.4231 – 60.4232
§ 60.4231What emission standards must I meet if I am a manufacturer of stationary SI internal combustion engines or equipment containing such engines?
§ 60.4232How long must my engines meet the emission standards if I am a manufacturer of stationary SI internal combustion engines?
Emission Standards for Owners and Operators60.4233 – 60.4234
§ 60.4233What emission standards must I meet if I am an owner or operator of a stationary SI internal combustion engine?
§ 60.4234How long must I meet the emission standards if I am an owner or operator of a stationary SI internal combustion engine?
Other Requirements for Owners and Operators60.4235 – 60.4237
§ 60.4235What fuel requirements must I meet if I am an owner or operator of a stationary SI gasoline fired internal combustion engine subject to this subpart?
§ 60.4236What is the deadline for importing or installing stationary SI ICE produced in previous model years?
§ 60.4237What are the monitoring requirements if I am an owner or operator of an emergency stationary SI internal combustion engine?
Compliance Requirements for Manufacturers60.4238 – 60.4242
§ 60.4238What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines 19 KW (25 HP) or a manufacturer of equipment containing such engines?
§ 60.4239What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines >19 KW (25 HP) that use gasoline or a manufacturer of equipment containing such engines?
§ 60.4240What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines >19 KW (25 HP) that are rich burn engines that use LPG or a manufacturer of equipment containing such engines?
§ 60.4241What are my compliance requirements if I am a manufacturer of stationary SI internal combustion engines participating in the voluntary certification program or a manufacturer of equipment containing such engines?
§ 60.4242What other requirements must I meet if I am a manufacturer of stationary SI internal combustion engines or equipment containing stationary SI internal combustion engines or a manufacturer of equipment containing such engines?
Compliance Requirements for Owners and Operators60.4243
§ 60.4243What are my compliance requirements if I am an owner or operator of a stationary SI internal combustion engine?
Testing Requirements for Owners and Operators60.4244
§ 60.4244What test methods and other procedures must I use if I am an owner or operator of a stationary SI internal combustion engine?
Notification, Reports, and Records for Owners and Operators60.4245
§ 60.4245What are my notification, reporting, and recordkeeping requirements if I am an owner or operator of a stationary SI internal combustion engine?
General Provisions60.4246
§ 60.4246What General Provisions and confidential information provisions apply to me?
Mobile Source Provisions60.4247
§ 60.4247What parts of the mobile source provisions apply to me if I am a manufacturer of stationary SI internal combustion engines or a manufacturer of equipment containing such engines?
Definitions60.4248
§ 60.4248What definitions apply to this subpart?
Table 1 to Subpart JJJJ of Part 60
NOX, CO, and VOC Emission Standards for Stationary Non-Emergency SI Engines ≥100 HP (Except Gasoline and Rich Burn LPG), Stationary SI Landfill/Digester Gas Engines, and Stationary Emergency Engines >25 HP
Table 2 to Subpart JJJJ of Part 60
Requirements for Performance Tests
Table 3 to Subpart JJJJ of Part 60
Applicability of General Provisions to Subpart JJJJ
Table 4 to Subpart JJJJ of Part 60
Applicability of Mobile Source Provisions for Manufacturers Participating in the Voluntary Certification Program and Certifying Stationary SI ICE to Emission Standards in Table 1 of Subpart JJJJ
Subpart KKKKStandards of Performance for Stationary Combustion Turbines60.4300 – 60.4420
Introduction60.4300
§ 60.4300What is the purpose of this subpart?
Applicability60.4305 – 60.4310
§ 60.4305Does this subpart apply to my stationary combustion turbine?
§ 60.4310What types of operations are exempt from these standards of performance?
Emission Limits60.4315 – 60.4331
§ 60.4315What pollutants are regulated by this subpart?
§ 60.4320What emission limits must I meet for nitrogen oxides (NOX)?
§ 60.4325What emission limits must I meet for NOX if my turbine burns both natural gas and distillate oil (or some other combination of fuels)?
§ 60.4330What emission limits must I meet for sulfur dioxide (SO2)?
§ 60.4331What are the requirements for operating a stationary temporary combustion turbine?
General Compliance Requirements60.4333
§ 60.4333What are my general requirements for complying with this subpart?
Monitoring60.4335 – 60.4370
§ 60.4335How do I demonstrate compliance for NOX if I use water or steam injection?
§ 60.4340How do I demonstrate continuous compliance for NOX if I do not use water or steam injection?
§ 60.4345What are the requirements for the continuous emission monitoring system equipment, if I choose to use this option?
§ 60.4350How do I use data from the continuous emission monitoring equipment to identify excess emissions?
§ 60.4355How do I establish and document a proper parameter monitoring plan?
§ 60.4360How do I determine the total sulfur content of the turbine's combustion fuel?
§ 60.4365How can I be exempted from monitoring the total sulfur content of the fuel?
§ 60.4370How often must I determine the sulfur content of the fuel?
Reporting60.4375 – 60.4395
§ 60.4375What reports must I submit?
§ 60.4380How are excess emissions and monitor downtime defined for NOX?
§ 60.4385How are excess emissions and monitoring downtime defined for SO2?
§ 60.4390What are my reporting requirements if I operate an emergency combustion turbine or a research and development turbine?
§ 60.4395What must I submit my reports?
Performance Tests60.4400 – 60.4415
§ 60.4400How do I conduct the initial and subsequent performance tests, regarding NOX?
§ 60.4405How do I perform the initial performance test if I have chosen to install a NOX-diluent CEMS?
§ 60.4410How do I establish a valid parameter range if I have chosen to continuously monitor parameters?
§ 60.4415How do I conduct the initial and subsequent performance tests for sulfur?
Definitions60.4420
§ 60.4420What definitions apply to this subpart?
Table 1 to Subpart KKKK of Part 60
Nitrogen Oxide Emission Limits for New Stationary Combustion Turbines
Subpart KKKKaStandards of Performance for Stationary Combustion Turbines60.4300a – 60.4420a
Introduction60.4300a
§ 60.4300aWhat is the purpose of this subpart?
Applicability60.4305a – 60.4310a
§ 60.4305aDoes this subpart apply to my stationary combustion turbine?
§ 60.4310aWhat stationary combustion turbines are not subject to this subpart?
Emission Standards60.4315a – 60.4331a
§ 60.4315aWhat pollutants are regulated by this subpart?
§ 60.4320aWhat NOX emissions standard must I meet?
§ 60.4325aWhat emission limit must I meet for NOX if my turbine burns both natural gas and distillate oil (or some other combination of fuels)?
§ 60.4330aWhat SO2 emissions standard must I meet?
§ 60.4331aWhat are the requirements for operating a stationary temporary combustion turbine?
General Compliance Requirements60.4333a
§ 60.4333aWhat are my general requirements for complying with this subpart?
Monitoring60.4335a – 60.4374a
§ 60.4335aHow do I demonstrate compliance with my NOX emissions standard without using a NOX CEMS if I use water or steam injection?
§ 60.4340aHow do I demonstrate compliance with my NOX emissions standard without using a NOX CEMS if I do not use water or steam injection?
§ 60.4342aHow do I monitor NOX control operating parameters?
§ 60.4345aHow do I demonstrate compliance with my NOX emissions standard using a NOX CEMS?
§ 60.4350aHow do I use the NOX CEMS data to determine excess emissions?
§ 60.4360aHow do I use fuel sulfur analysis to determine the total sulfur content of the fuel combusted in my stationary combustion turbine?
§ 60.4370aHow frequently must I determine the fuel sulfur content?
§ 60.4372aHow can I demonstrate compliance with my SO2 emissions standard using records of the fuel sulfur content?
§ 60.4374aHow do I demonstrate compliance with my SO2 emissions standard and determine excess emissions using a SO2 CEMS?
Recordkeeping and Reporting60.4375a – 60.4395a
§ 60.4375aWhat reports must I submit?
§ 60.4380aHow are NOX excess emissions and monitor downtime reported?
§ 60.4385aHow are SO2 excess emissions and monitor downtime reported?
§ 60.4390aWhat records must I maintain?
§ 60.4395aWhen must I submit my reports?
Performance Tests60.4400a – 60.4415a
§ 60.4400aHow do I conduct performance tests to demonstrate compliance with my NOX emissions standard if I do not have a NOX CEMS?
§ 60.4405aHow do I conduct a performance test if I use a NOX CEMS?
§ 60.4415aHow do I conduct performance tests to demonstrate compliance with my SO2 emissions standard?
Other Requirements and Information60.4416a – 60.4420a
§ 60.4416aWhat parts of the general provisions apply to my affected EGU?
§ 60.4417aWho implements and enforces this subpart?
§ 60.4420aWhat definitions apply to this subpart?
Table 1 to Subpart KKKKa of Part 60
Nitrogen Oxide Emission Standards for Stationary Combustion Turbines
Table 2 to Subpart KKKKa of Part 60
Alternative Mass-Based NOX Emission Standards for Stationary Combustion Turbines
Table 3 to Subpart KKKKa of Part 60
Applicability of Subpart A of This Part to This Subpart
Subpart LLLLStandards of Performance for New Sewage Sludge Incineration Units60.4760 – 60.4930
Introduction60.4760 – 60.4765
§ 60.4760What does this subpart do?
§ 60.4765When does this subpart become effective?
Applicability and Delegation of Authority60.4770 – 60.4795
§ 60.4770Does this subpart apply to my sewage sludge incineration unit?
§ 60.4775What is a new sewage sludge incineration unit?
§ 60.4780What sewage sludge incineration units are exempt from this subpart?
§ 60.4785Who implements and enforces this subpart?
§ 60.4790How are these new source performance standards structured?
§ 60.4795Do all nine components of these new source performance standards apply at the same time?
Preconstruction Siting Analysis60.4800 – 60.4805
§ 60.4800Who must prepare a siting analysis?
§ 60.4805What is a siting analysis?
Operator Training and Qualification60.4810 – 60.4840
§ 60.4810What are the operator training and qualification requirements?
§ 60.4815When must the operator training course be completed?
§ 60.4820How do I obtain my operator qualification?
§ 60.4825How do I maintain my operator qualification?
§ 60.4830How do I renew my lapsed operator qualification?
§ 60.4835What if all the qualified operators are temporarily not accessible?
§ 60.4840What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
Emission Limits, Emission Standards, and Operating Limits and Requirements60.4845 – 60.4861
§ 60.4845What emission limits and standards must I meet and by when?
§ 60.4850What operating limits and requirements must I meet and by when?
§ 60.4855How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, or activated carbon injection, or if I limit emissions in some other manner, to comply with the emission limits?
§ 60.4860Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
§ 60.4861How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?
Initial Compliance Requirements60.4865 – 60.4880
§ 60.4865How and when do I demonstrate initial compliance with the emission limits and standards?
§ 60.4870How do I establish my operating limits?
§ 60.4875By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
§ 60.4880How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
Continuous Compliance Requirements60.4885 – 60.4895
§ 60.4885How and when do I demonstrate continuous compliance with the emission limits and standards?
§ 60.4890How do I demonstrate continuous compliance with my operating limits?
§ 60.4895By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
Performance Testing, Monitoring, and Calibration Requirements60.4900 – 60.4905
§ 60.4900What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
§ 60.4905What are the monitoring and calibration requirements for compliance with my operating limits?
Recordkeeping and Reporting60.4910 – 60.4915
§ 60.4910What records must I keep?
§ 60.4915What reports must I submit?
Title V Operating Permits60.4920 – 60.4925
§ 60.4920Am I required to apply for and obtain a title V operating permit for my unit?
§ 60.4925When must I submit a title V permit application for my new SSI unit?
Definitions60.4930
§ 60.4930What definitions must I know?
Table 1 to Subpart LLLL of Part 60
Emission Limits and Standards for New Fluidized Bed Sewage Sludge Incineration Units
Table 2 to Subpart LLLL of Part 60
Emission Limits and Standards for New Multiple Hearth Sewage Sludge Incineration Units
Table 3 to Subpart LLLL of Part 60
Operating Parameters for New Sewage Sludge Incineration Units a
Table 4 to Subpart LLLL of Part 60
Toxic Equivalency Factors
Table 5 to Subpart LLLL of Part 60
Summary of Reporting Requirements for New Sewage Sludge Incineration Units a
Subpart MMMMEmission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units60.5000 – 60.5250
Introduction60.5000 – 60.5055
§ 60.5000What is the purpose of this subpart?
§ 60.5005Am I affected by this subpart?
§ 60.5010Is a state plan required for all states?
§ 60.5015What must I include in my state plan?
§ 60.5020Is there an approval process for my state plan?
§ 60.5025What if my state plan is not approvable?
§ 60.5030Is there an approval process for a negative declaration letter?
§ 60.5035What compliance schedule must I include in my state plan?
§ 60.5040Are there any state plan requirements for this subpart that apply instead of the requirements specified in subpart B?
§ 60.5045In lieu of a state plan submittal, are there other acceptable option(s) for a state to meet its section 111(d)/129 (b)(2) obligations?
§ 60.5050What authorities will not be delegated to state, local, or tribal agencies?
§ 60.5055Does this subpart directly affect SSI unit owners and operators in my state?
Applicability of State Plans60.5060 – 60.5065
§ 60.5060What SSI units must I address in my state plan?
§ 60.5065What SSI units are exempt from my state plan?
Use of Model Rule60.5070 – 60.5080
§ 60.5070What is the “model rule” in this subpart?
§ 60.5075How does the model rule relate to the required elements of my state plan?
§ 60.5080What are the principal components of the model rule?
Model Rule—Increments of Progress60.5085 – 60.5125
§ 60.5085What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.5090When must I complete each increment of progress?
§ 60.5095What must I include in the notifications of achievement of increments of progress?
§ 60.5100When must I submit the notifications of achievement of increments of progress?
§ 60.5105What if I do not meet an increment of progress?
§ 60.5110How do I comply with the increment of progress for submittal of a control plan?
§ 60.5115How do I comply with the increment of progress for achieving final compliance?
§ 60.5120What must I do if I close my SSI unit and then restart it?
§ 60.5125What must I do if I plan to permanently close my SSI unit and not restart it?
Model Rule—Operator Training and Qualification60.5130 – 60.5160
§ 60.5130What are the operator training and qualification requirements?
§ 60.5135When must the operator training course be completed?
§ 60.5140How do I obtain my operator qualification?
§ 60.5145How do I maintain my operator qualification?
§ 60.5150How do I renew my lapsed operator qualification?
§ 60.5155What if all the qualified operators are temporarily not accessible?
§ 60.5160What site-specific documentation is required and how often must it be reviewed by qualified operators and plant personnel?
Model Rule—Emission Limits, Emission Standards, and Operating Limits and Requirements60.5165 – 60.5181
§ 60.5165What emission limits and standards must I meet and by when?
§ 60.5170What operating limits and requirements must I meet and by when?
§ 60.5175How do I establish operating limits if I do not use a wet scrubber, fabric filter, electrostatic precipitator, activated carbon injection, or afterburner, or if I limit emissions in some other manner, to comply with the emission limits?
§ 60.5180Do the emission limits, emission standards, and operating limits apply during periods of startup, shutdown, and malfunction?
§ 60.5181How do I establish an affirmative defense for exceedance of an emission limit or standard during malfunction?
Model Rule—Initial Compliance Requirements60.5185 – 60.5200
§ 60.5185How and when do I demonstrate initial compliance with the emission limits and standards?
§ 60.5190How do I establish my operating limits?
§ 60.5195By what date must I conduct the initial air pollution control device inspection and make any necessary repairs?
§ 60.5200How do I develop a site-specific monitoring plan for my continuous monitoring, bag leak detection, and ash handling systems, and by what date must I conduct an initial performance evaluation?
Model Rule—Continuous Compliance Requirements60.5205 – 60.5215
§ 60.5205How and when do I demonstrate continuous compliance with the emission limits and standards?
§ 60.5210How do I demonstrate continuous compliance with my operating limits?
§ 60.5215By what date must I conduct annual air pollution control device inspections and make any necessary repairs?
Model Rule—Performance Testing, Monitoring, and Calibration Requirements60.5220 – 60.5225
§ 60.5220What are the performance testing, monitoring, and calibration requirements for compliance with the emission limits and standards?
§ 60.5225What are the monitoring and calibration requirements for compliance with my operating limits?
Model Rule—Recordkeeping and Reporting60.5230 – 60.5235
§ 60.5230What records must I keep?
§ 60.5235What reports must I submit?
Model Rule—Title V Operating Permits60.5240 – 60.5245
§ 60.5240Am I required to apply for and obtain a Title V operating permit for my existing SSI unit?
§ 60.5245When must I submit a title V permit application for my existing SSI unit?
Model Rule-Definitions60.5250
§ 60.5250What definitions must I know?
Table 1 to Subpart MMMM of Part 60
Model Rule—Increments of Progress and Compliance Schedules for Existing Sewage Sludge Incineration Units
Table 2 to Subpart MMMM of Part 60
Model Rule—Emission Limits and Standards for Existing Fluidized Bed Sewage Sludge Incineration Units
Table 3 to Subpart MMMM of Part 60
Model Rule—Emission Limits and Standards for Existing Multiple Hearth Sewage Sludge Incineration Units
Table 4 to Subpart MMMM of Part 60
Model Rule—Operating Parameters for Existing Sewage Sludge Incineration Units a
Table 5 to Subpart MMMM of Part 60
Model Rule—Toxic Equivalency Factors
Table 6 to Subpart MMMM of Part 60
Model Rule—Summary of Reporting Requirements for Existing Sewage Sludge Incineration Units a
Subpart NNNN [Reserved]
Subpart OOOOStandards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification, or Reconstruction Commenced After August 23, 2011, and on or Before September 18, 201560.5360 – 60.5430
§ 60.5360What is the purpose of this subpart?
§ 60.5365Am I subject to this subpart?
§ 60.5370When must I comply with this subpart?
§ 60.5371What standards apply to super-emitter events?
§ 60.5375What standards apply to gas well affected facilities?
§ 60.5380What standards apply to centrifugal compressor affected facilities?
§ 60.5385What standards apply to reciprocating compressor affected facilities?
§ 60.5390What standards apply to pneumatic controller affected facilities?
§ 60.5395What standards apply to storage vessel affected facilities?
§ 60.5400What equipment leak standards apply to affected facilities at an onshore natural gas processing plant?
§ 60.5401What are the exceptions to the equipment leak standards for affected facilities at onshore natural gas processing plants?
§ 60.5402What are the alternative emission limitations for equipment leaks from onshore natural gas processing plants?
§ 60.5405What standards apply to sweetening units at onshore natural gas processing plants?
§ 60.5406What test methods and procedures must I use for my sweetening units affected facilities at onshore natural gas processing plants?
§ 60.5407What are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities at onshore natural gas processing plants?
§ 60.5408What is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure?
§ 60.5410How do I demonstrate initial compliance with the standards for my gas well affected facility, my centrifugal compressor affected facility, my reciprocating compressor affected facility, my pneumatic controller affected facility, my storage vessel affected facility, and my equipment leaks and sweetening unit affected facilities at onshore natural gas processing plants?
§ 60.5411What additional requirements must I meet to determine initial compliance for my covers and closed vent systems routing materials from storage vessels, reciprocating compressors and centrifugal compressor wet seal degassing systems?
§ 60.5412What additional requirements must I meet for determining initial compliance with control devices used to comply with the emission standards for my storage vessel or centrifugal compressor affected facility?
§ 60.5413What are the performance testing procedures for control devices used to demonstrate compliance at my storage vessel or centrifugal compressor affected facility?
§ 60.5415How do I demonstrate continuous compliance with the standards for my gas well affected facility, my centrifugal compressor affected facility, my stationary reciprocating compressor affected facility, my pneumatic controller affected facility, my storage vessel affected facility, and my affected facilities at onshore natural gas processing plants?
§ 60.5416What are the initial and continuous cover and closed vent system inspection and monitoring requirements for my storage vessel, centrifugal compressor and reciprocating compressor affected facilities?
§ 60.5417What are the continuous control device monitoring requirements for my storage vessel or centrifugal compressor affected facility?
§ 60.5420What are my notification, reporting, and recordkeeping requirements?
§ 60.5421What are my additional recordkeeping requirements for my affected facility subject to VOC requirements for onshore natural gas processing plants?
§ 60.5422What are my additional reporting requirements for my affected facility subject to VOC requirements for onshore natural gas processing plants?
§ 60.5423What additional recordkeeping and reporting requirements apply to my sweetening unit affected facilities at onshore natural gas processing plants?
§ 60.5425What part of the General Provisions apply to me?
§ 60.5430What definitions apply to this subpart?
Table 1 to Subpart OOOO of Part 60
Required Minimum Initial SO2 Emission Reduction Efficiency (Zi)
Table 2 to Subpart OOOO of Part 60
Required Minimum SO2 Emission Reduction Efficiency (Zc)
Table 3 to Subpart OOOO of Part 60
Applicability of General Provisions to Subpart OOOO
Subpart OOOOaStandards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After September 18, 2015 and On or Before December 6, 202260.5360a – 60.5439a
§ 60.5360aWhat is the purpose of this subpart?
§ 60.5365aAm I subject to this subpart?
§ 60.5370aWhen must I comply with this subpart?
§ 60.5371aWhat standards apply to super-emitter events?
§ 60.5375aWhat GHG and VOC standards apply to well affected facilities?
§ 60.5380aWhat GHG and VOC standards apply to centrifugal compressor affected facilities?
§ 60.5385aWhat GHG and VOC standards apply to reciprocating compressor affected facilities?
§ 60.5390aWhat GHG and VOC standards apply to pneumatic controller affected facilities?
§ 60.5393aWhat GHG and VOC standards apply to pneumatic pump affected facilities?
§ 60.5395aWhat VOC standards apply to storage vessel affected facilities?
§ 60.5397aWhat fugitive emissions GHG and VOC standards apply to the affected facility which is the collection of fugitive emissions components at a well site and the affected facility which is the collection of fugitive emissions components at a compressor station?
§ 60.5398aWhat are the alternative means of emission limitations for GHG and VOC from well completions, reciprocating compressors, the collection of fugitive emissions components at a well site and the collection of fugitive emissions components at a compressor station?
§ 60.5399aWhat alternative fugitive emissions standards apply to the affected facility which is the collection of fugitive emissions components at a well site and the affected facility which is the collection of fugitive emissions components at a compressor station: Equivalency with state, local, and tribal programs?
§ 60.5400aWhat equipment leak GHG and VOC standards apply to affected facilities at an onshore natural gas processing plant?
§ 60.5401aWhat are the exceptions to the equipment leak GHG and VOC standards for affected facilities at onshore natural gas processing plants?
§ 60.5402aWhat are the alternative means of emission limitations for GHG and VOC equipment leaks from onshore natural gas processing plants?
§ 60.5405aWhat standards apply to sweetening unit affected facilities?
§ 60.5406aWhat test methods and procedures must I use for my sweetening unit affected facilities?
§ 60.5407aWhat are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities?
§ 60.5408aWhat is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure?
§ 60.5410aHow do I demonstrate initial compliance with the standards for my well, centrifugal compressor, reciprocating compressor, pneumatic controller, pneumatic pump, storage vessel, collection of fugitive emissions components at a well site, collection of fugitive emissions components at a compressor station, and equipment leaks at onshore natural gas processing plants and sweetening unit affected facilities?
§ 60.5411aWhat additional requirements must I meet to determine initial compliance for my covers and closed vent systems routing emissions from centrifugal compressor wet seal fluid degassing systems, reciprocating compressors, pneumatic pumps and storage vessels?
§ 60.5412aWhat additional requirements must I meet for determining initial compliance with control devices used to comply with the emission standards for my centrifugal compressor, and storage vessel affected facilities?
§ 60.5413aWhat are the performance testing procedures for control devices used to demonstrate compliance at my centrifugal compressor and storage vessel affected facilities?
§ 60.5415aHow do I demonstrate continuous compliance with the standards for my well, centrifugal compressor, reciprocating compressor, pneumatic controller, pneumatic pump, storage vessel, collection of fugitive emissions components at a well site, and collection of fugitive emissions components at a compressor station affected facilities, equipment leaks at onshore natural gas processing plants and sweetening unit affected facilities?
§ 60.5416aWhat are the initial and continuous cover and closed vent system inspection and monitoring requirements for my centrifugal compressor, reciprocating compressor, pneumatic pump, and storage vessel affected facilities?
§ 60.5417aWhat are the continuous control device monitoring requirements for my centrifugal compressor and storage vessel affected facilities?
§ 60.5420aWhat are my notification, reporting, and recordkeeping requirements?
§ 60.5421aWhat are my additional recordkeeping requirements for my affected facility subject to GHG and VOC requirements for onshore natural gas processing plants?
§ 60.5422aWhat are my additional reporting requirements for my affected facility subject to GHG and VOC requirements for onshore natural gas processing plants?
§ 60.5423aWhat additional recordkeeping and reporting requirements apply to my sweetening unit affected facilities?
§ 60.5425aWhat parts of the General Provisions apply to me?
§ 60.5430aWhat definitions apply to this subpart?
§ 60.5432aHow do I determine whether a well is a low pressure well using the low pressure well equation?
§§ 60.5433a-60.5439a [Reserved]
Table 1 to Subpart OOOOa of Part 60
Required Minimum Initial SO2 Emission Reduction Efficiency (Zi)
Table 2 to Subpart OOOOa of Part 60
Required Minimum SO2 Emission Reduction Efficiency (Zc)
Table 3 to Subpart OOOOa of Part 60
Applicability of General Provisions to Subpart OOOOa
Subpart OOOObStandards of Performance for Crude Oil and Natural Gas Facilities for Which Construction, Modification or Reconstruction Commenced After December 6, 202260.5360b – 60.5439b
§ 60.5360bWhat is the purpose of this subpart?
§ 60.5365bAm I subject to this subpart?
§ 60.5370bWhen must I comply with this subpart?
§ 60.5371bWhat GHG and VOC standards apply to super-emitter events?
§ 60.5375bWhat GHG and VOC standards apply to well completions at well affected facilities?
§ 60.5376bWhat GHG and VOC standards apply to gas well liquids unloading operations at well affected facilities?
§ 60.5377bWhat GHG and VOC standards apply to associated gas wells at well affected facilities?
§ 60.5380bWhat GHG and VOC standards apply to centrifugal compressor affected facilities?
§ 60.5385bWhat GHG and VOC standards apply to reciprocating compressor affected facilities?
§ 60.5386bWhat test methods and procedures must I use for my centrifugal compressor and reciprocating compressor affected facilities?
§ 60.5390bWhat GHG and VOC standards apply to process controller affected facilities?
§ 60.5393bWhat GHG and VOC standards apply to pump affected facilities?
§ 60.5395bWhat GHG and VOC standards apply to storage vessel affected facilities?
§ 60.5397bWhat GHG and VOC standards apply to fugitive emissions components affected facilities?
§ 60.5398bWhat alternative GHG and VOC standards apply to fugitive emissions components affected facilities and what inspection and monitoring requirements apply to covers and closed vent systems when using an alternative technology?
§ 60.5399bWhat are the alternative means of emission limitations for GHG and VOC emissions from well completions, liquids unloading operations, centrifugal compressors, reciprocating compressors, fugitive emissions components, and process unit equipment affected facilities; and what are the alternative fugitive emissions standards based on State, local, and Tribal programs?
§ 60.5400bWhat GHG and VOC standards apply to process unit equipment affected facilities?
§ 60.5401bWhat are the alternative GHG and VOC standards for process unit equipment affected facilities?
§ 60.5402bWhat are the exceptions to the GHG and VOC standards for process unit equipment affected facilities?
§ 60.5403bWhat test methods and procedures must I use for my process unit equipment affected facilities?
§ 60.5405bWhat standards apply to sweetening unit affected facilities?
§ 60.5406bWhat test methods and procedures must I use for my sweetening unit affected facilities?
§ 60.5407bWhat are the requirements for monitoring of emissions and operations from my sweetening unit affected facilities?
§ 60.5408bWhat is an optional procedure for measuring hydrogen sulfide in acid gas—Tutwiler Procedure?
§ 60.5410bHow do I demonstrate initial compliance with the standards for each of my affected facilities?
§ 60.5411bWhat additional requirements must I meet to determine initial compliance for my covers and closed vent systems?
§ 60.5412bWhat additional requirements must I meet for determining initial compliance of my control devices?
§ 60.5413bWhat are the performance testing procedures for control devices?
§ 60.5415bHow do I demonstrate continuous compliance with the standards for each of my affected facilities?
§ 60.5416bWhat are the initial and continuous cover and closed vent system inspection and monitoring requirements?
§ 60.5417bWhat are the continuous monitoring requirements for my control devices?
§ 60.5420bWhat are my notification, reporting, and recordkeeping requirements?
§ 60.5421bWhat are my additional recordkeeping requirements for process unit equipment affected facilities?
§ 60.5422bWhat are my additional reporting requirements for process unit equipment affected facilities?
§ 60.5423bWhat are my additional recordkeeping and reporting requirements for sweetening unit affected facilities?
§ 60.5424bWhat are my additional recordkeeping and reporting requirements if I comply with the alternative GHG and VOC standards for fugitive emissions components affected facilities and covers and closed vent systems?
§ 60.5425bWhat parts of the General Provisions apply to me?
§ 60.5430bWhat definitions apply to this subpart?
§ 60.5432bHow do I determine whether a well is a low pressure well using the low pressure well equation?
§§ 60.5433b-60.5439b [Reserved]
Table 1 to Subpart OOOOb of Part 60
Alternative Technology Periodic Screening Frequency at Well Sites, Centralized Production Facilities, and Compressor Stations Subject to AVO Inspections With Quarterly OGI or EPA Method 21 Monitoring
Table 2 to Subpart OOOOb of Part 60
Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 Monitoring
Table 3 to Subpart OOOOb of Part 60
Required Minimum Initial SO2 Emission Reduction Efficiency (Zi)
Table 4 to Subpart OOOOb of Part 60
Required Minimum SO2 Emission Reduction Efficiency (Zc)
Table 5 to Subpart OOOOb of Part 60
Applicability of General Provisions to Subpart OOOOb
Subpart OOOOcEmissions Guidelines for Greenhouse Gas Emissions From Existing Crude Oil and Natural Gas Facilities60.5360c – 60.5439c
Introduction60.5360c – 60.5374c
§ 60.5360cWhat is the purpose of this subpart?
§ 60.5361cWhich pollutants are regulated by this subpart?
§ 60.5362cAm I affected by this subpart?
§ 60.5363cWhat must I include in my state or Tribal plan?
§ 60.5364cHow do I apply to use my state standards as part of my state or Tribal plan submission?
§ 60.5365cHow do I apply for a less stringent standard taking into consideration the remaining useful life of a designated facility and other factors?
§ 60.5366c [Reserved]
§ 60.5367cIs there an approval process for my state or Tribal plan?
§ 60.5368cWhat if my state or Tribal plan is not approvable?
§ 60.5369cIs there an approval process for a negative declaration letter?
§ 60.5370cWhat compliance schedule must I include in my state or Tribal plan?
§ 60.5371cWhat requirements apply to revisions to my state or Tribal plan?
§ 60.5372cIn lieu of a state or Tribal plan submittal, are there other acceptable option(s) for a state to meet its Clean Air Act section 111(d) obligations?
§ 60.5373cWhat authorities will not be delegated to state, local, or Tribal agencies?
§ 60.5374cDoes this subpart directly affect designated facility owners and operators in my state?
Applicability of State or Tribal Plans60.5375c
§ 60.5375cWhat designated facilities must I address in my state or Tribal plan?
Use of Model Rule60.5376c – 60.5378c
§ 60.5376cWhat is the “model rule” in this subpart?
§ 60.5377cHow does the model rule relate to the required elements of my state or Tribal plan?
§ 60.5378cWhat are the principal components of the model rule?
Model Rule—Increments of Progress60.5379c – 60.5381c
§ 60.5379cWhat are my requirements for meeting increments of progress and achieving final compliance?
§ 60.5380cWhat if I do not meet the final control plan increment of progress compliance date?
§ 60.5381cHow do I comply with the increment of progress for submittal of a final compliance control plan?
Model Rule—Applicability60.5385c – 60.5387c
§ 60.5385cWhat is the purpose of this subpart?
§ 60.5386cAm I subject to this subpart?
§ 60.5387cWhen must I comply with this subpart?
Model Rule—Emission and Work Practice Standards60.5388c – 60.5402c
§ 60.5388cWhat standards apply to super-emitter events?
§ 60.5390cWhat GHG standards apply to gas well liquids unloading operations at well designated facilities?
§ 60.5391cWhat GHG standards apply to associated gas wells at well designated facilities?
§ 60.5392cWhat GHG standards apply to centrifugal compressor designated facilities?
§ 60.5393cWhat GHG standards apply to reciprocating compressor designated facilities?
§ 60.5394cWhat GHG standards apply to process controller designated facilities?
§ 60.5395cWhat GHG standards apply to pump designated facilities?
§ 60.5396cWhat GHG standards apply to storage vessel designated facilities?
§ 60.5397cWhat GHG standards apply to fugitive emissions components designated facilities?
§ 60.5398cWhat alternative GHG standards apply to fugitive emissions components designated facilities and what inspection and monitoring requirements apply to covers and closed vent systems when using an alternative technology?
§ 60.5400cWhat GHG standards apply to process unit equipment designated facilities?
§ 60.5401cWhat are the alternative GHG standards for process unit equipment designated facilities?
§ 60.5402cWhat are the exceptions to the GHG standards for process unit equipment designated facilities?
Model Rule—Test Methods and Performance Testing60.5405c – 60.5406c
§ 60.5405cWhat test methods and procedures must I use for my centrifugal compressor and reciprocating compressor designated facilities?
§ 60.5406cWhat test methods and procedures must I use for my process unit equipment designated facilities?
Model Rule—Initial Compliance Requirements60.5410c – 60.5413c
§ 60.5410cHow do I demonstrate initial compliance with the standards for each of my designated facilities?
§ 60.5411cWhat additional requirements must I meet to determine initial compliance for my covers and closed vent systems?
§ 60.5412cWhat additional requirements must I meet for determining initial compliance of my control devices?
§ 60.5413cWhat are the performance testing procedures for control devices?
Model Rule—Continuous Compliance Requirements60.5415c – 60.5417c
§ 60.5415cHow do I demonstrate continuous compliance with the standards for each of my designated facilities?
§ 60.5416cWhat are the initial and continuous cover and closed vent system inspection and monitoring requirements?
§ 60.5417cWhat are the continuous monitoring requirements for my control devices?
Model Rule—Recordkeeping and Reporting60.5420c – 60.5425c
§ 60.5420cWhat are my notification, reporting, and recordkeeping requirements?
§ 60.5421cWhat are my additional recordkeeping requirements for process unit equipment designated facilities?
§ 60.5422cWhat are my additional reporting requirements for process unit equipment designated facilities?
§ 60.5424cWhat are my additional recordkeeping and reporting requirements if I comply with the alternative GHG standards for fugitive emissions components designated facilities and covers and closed vent systems?
§ 60.5425cWhat parts of the General Provisions apply to me?
Model Rule—Definitions60.5430c – 60.5439c
§ 60.5430cWhat definitions apply to this subpart?
§§ 60.5431c-60.5439c [Reserved]
Table 1 to Subpart OOOOc of Part 60
Designated Facility Presumptive Standards and Regulated Entity Compliance Dates
Table 2 to Subpart OOOOc of Part 60
Alternative Technology Periodic Screening Frequency at Well Sites, Centralized Production Facilities, and Compressor Stations Subject to AVO Inspections With Quarterly OGI or EPA Method 21 Monitoring
Table 3 to Subpart OOOOc of Part 60
Alternative Technology Periodic Screening Frequency at Well Sites and Centralized Production Facilities Subject to AVO Inspections and/or Semiannual OGI or EPA Method 21 Monitoring
Table 4 to Subpart OOOOc of Part 60
Applicability of General Provisions to Subpart OOOOc
Subpart PPPP [Reserved]
Subpart QQQQStandards of Performance for New Residential Hydronic Heaters and Forced-Air Furnaces60.5472 – 60.5483
§ 60.5472Am I subject to this subpart?
§ 60.5473What definitions must I know?
§ 60.5474What standards and requirements must I meet and by when?
§ 60.5475What compliance and certification requirements must I meet and by when?
§ 60.5476What test methods and procedures must I use to determine compliance with the standards and requirements for certification?
§ 60.5477What procedures must I use for EPA approval of a test laboratory or EPA approval of a third-party certifier?
§ 60.5478What requirements must I meet for permanent labels, temporary labels (hangtags), and owner's manuals?
§ 60.5479What records must I keep and what reports must I submit?
§ 60.5480What activities are prohibited under this subpart?
§ 60.5481What hearing and appeal procedures apply to me?
§ 60.5482Who implements and enforces this subpart?
§ 60.5483What parts of the General Provisions do not apply to me?
Subpart TTTTStandards of Performance for Greenhouse Gas Emissions for Electric Generating Units60.5508 – 60.5580
Applicability60.5508 – 60.5509
§ 60.5508What is the purpose of this subpart?
§ 60.5509What are my general requirements for complying with this subpart?
Emission Standards60.5515 – 60.5520
§ 60.5515Which pollutants are regulated by this subpart?
§ 60.5520What CO2 emissions standard must I meet?
General Compliance Requirements60.5525
§ 60.5525What are my general requirements for complying with this subpart?
Monitoring and Compliance Determination Procedures60.5535 – 60.5540
§ 60.5535How do I monitor and collect data to demonstrate compliance?
§ 60.5540How do I demonstrate compliance with my CO2 emissions standard and determine excess emissions?
Notification, Reports, and Records60.5550 – 60.5565
§ 60.5550What notifications must I submit and when?
§ 60.5555What reports must I submit and when?
§ 60.5560What records must I maintain?
§ 60.5565In what form and how long must I keep my records?
Other Requirements and Information60.5570 – 60.5580
§ 60.5570What parts of the general provisions apply to my affected EGU?
§ 60.5575Who implements and enforces this subpart?
§ 60.5580What definitions apply to this subpart?
Table 1 to Subpart TTTT of Part 60
CO2 Emission Standards for Affected Steam Generating Units and Integrated Gasification Combined Cycle Facilities That Commenced Construction After January 8, 2014, and Reconstruction or Modification After June 18, 2014
Table 2 to Subpart TTTT of Part 60
CO2 Emission Standards for Affected Stationary Combustion Turbines That Commenced Construction After January 8, 2014, and Reconstruction After June 18, 2014 (Net Energy Output-Based Standards Applicable as Approved by the Administrator)
Table 3 to Subpart TTTT of Part 60
Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTT
Subpart TTTTaStandards of Performance for Greenhouse Gas Emissions for Modified Coal-Fired Steam Electric Generating Units and New Construction and Reconstruction Stationary Combustion Turbine Electric Generating Units60.5508a – 60.5580a
Applicability60.5508a – 60.5509a
§ 60.5508aWhat is the purpose of this subpart?
§ 60.5509aAm I subject to this subpart?
Emission Standards60.5515a – 60.5525a
§ 60.5515aWhich pollutants are regulated by this subpart?
§ 60.5520aWhat CO2 emissions standard must I meet?
§ 60.5525aWhat are my general requirements for complying with this subpart?
Monitoring and Compliance Determination Procedures60.5535a – 60.5540a
§ 60.5535aHow do I monitor and collect data to demonstrate compliance?
§ 60.5540aHow do I demonstrate compliance with my CO2 emissions standard and determine excess emissions?
Notification, Reports, and Records60.5550a – 60.5565a
§ 60.5550aWhat notifications must I submit and when?
§ 60.5555aWhat reports must I submit and when?
§ 60.5560aWhat records must I maintain?
§ 60.5565aIn what form and how long must I keep my records?
Other Requirements and Information60.5570a – 60.5580a
§ 60.5570aWhat parts of the general provisions apply to my affected EGU?
§ 60.5575aWho implements and enforces this subpart?
§ 60.5580aWhat definitions apply to this subpart?
Table 1 to Subpart TTTTa of Part 60
CO2 Emission Standards for Affected Stationary Combustion Turbines That Commenced Construction or Reconstruction After May 23, 2023 (Gross or Net Energy Output-Based Standards Applicable as Approved by the Administrator)
Table 2 to Subpart TTTTa of Part 60
CO2 Emission Standards for Affected Steam Generating Units or IGCC That Commenced Modification After May 23, 2023
Table 3 to Subpart TTTTa of Part 60
Applicability of Subpart A of Part 60 (General Provisions) to Subpart TTTTa
Subpart UUUUa [Reserved]
Subpart UUUUbEmission Guidelines for Greenhouse Gas Emissions for Electric Utility Generating Units60.5700b – 60.5880b
Introduction60.5700b – 60.5730b
§ 60.5700bWhat is the purpose of this subpart?
§ 60.5705bWhich pollutants are regulated by this subpart?
§ 60.5710bAm I affected by this subpart?
§ 60.5715bWhat is the review and approval process for my State plan?
§ 60.5720bWhat if I do not submit a State plan or my State plan is not approvable?
§ 60.5725bIn lieu of a State plan submittal, are there other acceptable option(s) for a State to meet its CAA section 111(d) obligations?
§ 60.5730bIs there an approval process for a negative declaration letter?
State Plan Requirements60.5740b – 60.5795b
§ 60.5740bWhat must I include in my federally enforceable State plan?
§ 60.5775bWhat standards of performance must I include in my State plan?
§ 60.5780bWhat compliance dates and compliance periods must I include in my State plan?
§ 60.5785bWhat are the timing requirements for submitting my State plan?
§ 60.5790bWhat is the procedure for revising my State plan?
§ 60.5795bCommitment to review emission guidelines for coal-fired affected EGUs
Applicability of State Plans to Affected EGUs60.5840b – 60.5850b
§ 60.5840bDoes this subpart directly affect EGU owners or operators in my State?
§ 60.5845bWhat affected EGUs must I address in my State plan?
§ 60.5850bWhat EGUs are excluded from being affected EGUs?
Recordkeeping and Reporting Requirements60.5860b – 60.5876b
§ 60.5860bWhat applicable monitoring, recordkeeping, and reporting requirements do I need to include in my State plan for affected EGUs?
§ 60.5865bWhat are my recordkeeping requirements?
§ 60.5870bWhat are my reporting and notification requirements?
§ 60.5875bHow do I submit information required by these emission guidelines to the EPA?
§ 60.5876bWhat are the recordkeeping and reporting requirements for EGUs that have committed to permanently cease operations by January 1, 2032?
Definitions60.5880b
§ 60.5880bWhat definitions apply to this subpart?
Subpart VVVVStandards of Performance for Large Municipal Waste Combustors60.5680 – 60.6145
Introduction60.5680 – 60.5685
§ 60.5680What does this subpart do?
§ 60.5685When does this subpart become effective?
Applicability60.5690 – 60.5725
§ 60.5690Does this subpart apply to my municipal waste combustor?
§ 60.5695What is a new municipal waste combustor?
§ 60.5700Does this subpart allow any exemptions?
§ 60.5705Do other new source performance standards also apply to my municipal waste combustor?
§ 60.5710What authorities to enforce these federal new source performance standards can the Administrator delegate to a state agency?
§ 60.5715How are these new source performance standards structured?
§ 60.5720Do all five components of these new source performance standards apply at the same time?
§ 60.5725Are there different subcategories of municipal waste combustors within this subpart?
Preconstruction Requirements: Materials Separation Plan60.5730 – 60.5785
§ 60.5730Who must submit a materials separation plan?
§ 60.5735What is a materials separation plan?
§ 60.5740What steps must I complete for my materials separation plan?
§ 60.5745What must I include in my draft materials separation plan?
§ 60.5750How do I make my draft materials separation plan available to the public?
§ 60.5755When must I accept comments on the materials separation plan?
§ 60.5760Where and when must I hold a public meeting on my draft materials separation plan?
§ 60.5765What must I do with any public comments I receive during the public comment period on my draft materials separation plan?
§ 60.5770What must I do with my revised materials separation plan?
§ 60.5775What must I include in the public meeting on my revised materials separation plan and siting analysis?
§ 60.5780What must I do with any public comments I receive on my revised materials separation plan?
§ 60.5785How do I submit my final materials separation plan?
Preconstruction Requirements: Siting Analysis60.5790 – 60.5830
§ 60.5790Who must submit a siting analysis?
§ 60.5795What is a siting analysis?
§ 60.5800What steps must I complete for my siting analysis?
§ 60.5805What must I include in my siting analysis?
§ 60.5810How do I make my siting analysis available to the public?
§ 60.5815When must I accept comments on the siting analysis and revised materials separation plan?
§ 60.5820Where and when must I hold a public meeting on the siting analysis?
§ 60.5825What must I do with any public comments I receive during the public comment period on my siting analysis?
§ 60.5830How do I submit my siting analysis?
Good Combustion Practices: Operator Training60.5835 – 60.5860
§ 60.5835What types of training must I do?
§ 60.5840Who must complete the operator training course? By when?
§ 60.5845Who must complete the site-specific training course?
§ 60.5850What site-specific training must I provide?
§ 60.5855What information must I include in the site-specific operating manual?
§ 60.5860Where must I keep the site-specific operating manual?
Good Combustion Practices: Operator Certification60.5865 – 60.5875
§ 60.5865What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
§ 60.5870After the required date for operator certification, who may operate the municipal waste combustor?
§ 60.5875What if all the certified operators must be temporarily offsite?
Good Combustion Practices: Operating Requirements60.5880 – 60.5885
§ 60.5880What are the operating practice requirements for my municipal waste combustor?
§ 60.5885What happens to the operating requirements during periods of startup, shutdown, and malfunction?
Emission Limits60.5890 – 60.5900
§ 60.5890What pollutants are regulated by this subpart?
§ 60.5895What emission limits must I meet? By when?
§ 60.5900What happens to the emission limits during periods of startup, shutdown, and malfunction?
Continuous Emission Monitoring60.5905 – 60.5955
§ 60.5905What types of continuous emission monitoring must I perform?
§ 60.5910What continuous emission monitoring systems must I install for gaseous pollutants?
§ 60.5915How are the data from the continuous emission monitoring systems used?
§ 60.5920How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.5925What is my schedule for evaluating continuous emission monitoring systems?
§ 60.5930What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
§ 60.5935What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.5940How do I convert my 1-hour arithmetic averages into the appropriate averaging times and units?
§ 60.5945What is required for my continuous opacity monitoring system and how are the data used?
§ 60.5950What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
§ 60.5955What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
Stack Testing60.5960 – 60.5985
§ 60.5960What types of stack tests must I conduct?
§ 60.5965How are the stack test data used?
§ 60.5970What schedule must I follow for the stack testing?
§ 60.5975What procedures and test methods must I use to stack test?
§ 60.5980May I conduct stack testing less often?
§ 60.5985May I conduct continuous monitoring or sampling in lieu of stack testing?
Other Monitoring Requirements60.5990 – 60.6015
§ 60.5990Must I meet other requirements for continuous monitoring?
§ 60.5995How do I monitor the load of my municipal waste combustor?
§ 60.6000How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
§ 60.6005How do I monitor the injection rate of activated carbon?
§ 60.6010What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
§ 60.6015What requirements must I meet for estimating my municipal waste combustor capacity?
Recordkeeping60.6020 – 60.6050
§ 60.6020What records must I keep?
§ 60.6025Where must I keep my records and for how long?
§ 60.6030What records must I keep for the materials separation plan and siting analysis?
§ 60.6035What records must I keep for operator training and certification?
§ 60.6040What records must I keep for stack tests?
§ 60.6045What records must I keep for continuously monitored pollutants or parameters?
§ 60.6050What records must I keep for municipal waste combustors that use activated carbon?
Reporting60.6055 – 60.6110
§ 60.6055What reports must I submit before I submit my notice of construction?
§ 60.6060What must I include in my notice of construction?
§ 60.6065What reports must I submit after I submit my notice of construction and in what form?
§ 60.6070What are the appropriate units of measurement for reporting my data?
§ 60.6075When must I submit the initial performance test report?
§ 60.6080What must I include in my initial performance test report?
§ 60.6085When must I submit the annual report?
§ 60.6090What must I include in my annual report?
§ 60.6095What must I do if I am out of compliance with the requirements of this subpart?
§ 60.6100If a semiannual report is required, when must I submit it?
§ 60.6105What must I include in the semiannual out-of-compliance reports?
§ 60.6110Can reporting dates be changed?
Air Curtain Incinerators That Burn 100 Percent Wood Waste, Clean Lumber, and/or Yard Waste60.6115 – 60.6135
§ 60.6115What is an air curtain incinerator?
§ 60.6120What is yard waste?
§ 60.6125What are the emission limits for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6130How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6135What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
Equations60.6140
§ 60.6140What equations must I use?
Definitions60.6145
§ 60.6145What definitions apply to this subpart?
Table 1 to Subpart VVVV
Large Municipal Waste Combustor Carbon Monoxide Limits
Table 2 to Subpart VVVV
Emission Limitations for New Large Municipal Waste Combustors
Table 3 to Subpart VVVV of Part 60
Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 4 to Subpart VVVV
Performance Test Requirements for Compliance With Emissions Limits under § 60.5895
Subpart WWWWEmission Guidelines and Compliance Times for Large Municipal Waste Combustors Constructed on or Before January 23, 202460.6250 – 60.6685
Introduction60.6250 – 60.6295
§ 60.6250What is the purpose of this subpart?
§ 60.6255Am I affected by this subpart? What authorities does the EPA Administrator retain?
§ 60.6260Is a state plan required for all states?
§ 60.6265What must I include in my state plan?
§ 60.6270Is there an approval process for my state plan?
§ 60.6275What if my state plan is not approvable?
§ 60.6280Is there an approval process for a negative declaration letter?
§ 60.6285What compliance schedule must I include in my state plan?
§ 60.6290Are there any state plan requirements for this subpart that supersede the requirements specified in subpart B?
§ 60.6295Does this subpart directly affect municipal waste combustor owners and operators in my state?
Applicability of State Plans60.6300 – 60.6310
§ 60.6300What municipal waste combustors must I address in my state plan?
§ 60.6305Are any large municipal waste combustors exempt from my state plan?
§ 60.6310What subcategories of large municipal waste combustors must I include in my state plan?
Use of Model Rule60.6315 – 60.6325
§ 60.6315What is the “model rule” in this subpart?
§ 60.6320How does the model rule relate to the required elements of my state plan?
§ 60.6325What are the principal components of the model rule?
Model Rule—Increments or Progress60.6330 – 60.6385
§ 60.6330What are my requirements for meeting increments of progress and achieving final compliance?
§ 60.6335When must I complete each increment of progress?
§ 60.6340What must I include in the notifications of achievement of my increments of progress?
§ 60.6345When must I submit the notifications of achievement of increments of progress?
§ 60.6350What if I do not meet an increment of progress?
§ 60.6355How do I comply with the increment of progress for submittal of a control plan?
§ 60.6360How do I comply with the increment of progress for awarding contracts?
§ 60.6365How do I comply with the increment of progress for initiating onsite construction?
§ 60.6370How do I comply with the increment of progress for completing onsite construction?
§ 60.6375How do I comply with the increment of progress for achieving final compliance?
§ 60.6380What must I do if I close my municipal waste combustor and then restart my municipal waste combustor?
§ 60.6385What must I do if I plan to permanently close my municipal waste combustor and not restart it?
Model Rule—Good Combustion Practices: Operator Training60.6390 – 60.6415
§ 60.6390What types of training must I do?
§ 60.6395Who must complete the operator training course? By when?
§ 60.6400Who must complete the site-specific training course?
§ 60.6405What site-specific training must I provide?
§ 60.6410What information must I include in the site-specific operating manual?
§ 60.6415Where must I keep the site-specific operating manual?
Model Rule—Good Combustion Practices: Operator Certification60.6420 – 60.6430
§ 60.6420What types of operator certification must the chief facility operator and shift supervisor obtain and by when must they obtain it?
§ 60.6425After the required date for operator certification, who may operate the municipal waste combustor?
§ 60.6430What if all the certified operators must be temporarily offsite?
Model Rule—Good Combustion Practices: Operating Requirements60.6435 – 60.6440
§ 60.6435What are the operating practice requirements for my municipal waste combustor?
§ 60.6440What happens to the operating requirements during periods of startup, shutdown, and malfunction?
Model Rule—Emission Limits60.6445 – 60.6455
§ 60.6445What pollutants are regulated by this subpart?
§ 60.6450What emission limits must I meet? By when?
§ 60.6455What happens to the emission limits during periods of startup, shutdown, and malfunction?
Model Rule—Continuous Emission Monitoring60.6460 – 60.6510
§ 60.6460What types of continuous emission monitoring must I perform?
§ 60.6465What continuous emission monitoring systems must I install for gaseous pollutants?
§ 60.6470How are the data from the continuous emission monitoring systems used?
§ 60.6475How do I make sure my continuous emission monitoring systems are operating correctly?
§ 60.6480What is my schedule for evaluating continuous emission monitoring systems?
§ 60.6485What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas?
§ 60.6490What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems?
§ 60.6495How do I convert my 1-hour arithmetic averages into appropriate averaging times and units?
§ 60.6500What is required for my continuous opacity monitoring system and how are the data used?
§ 60.6505What additional requirements must I meet for the operation of my continuous emission monitoring systems and continuous opacity monitoring system?
§ 60.6510What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data collection requirements?
Model Rule—Stack Testing60.6515 – 60.6540
§ 60.6515What types of stack tests must I conduct?
§ 60.6520How are the stack test data used?
§ 60.6525What schedule must I follow for the stack testing?
§ 60.6530What procedures and test methods must I use to stack test?
§ 60.6535May I conduct stack testing less often?
§ 60.6540May I conduct continuous monitoring or sampling in lieu of stack testing?
Model Rule—Other Monitoring Requirements60.6545 – 60.6570
§ 60.6545Must I meet other requirements for continuous monitoring?
§ 60.6550How do I monitor the load of my municipal waste combustor?
§ 60.6555How do I monitor the temperature of flue gases at the inlet of my particulate matter control device?
§ 60.6560How do I monitor the injection rate of activated carbon?
§ 60.6565What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems?
§ 60.6570What requirements must I meet for estimating my municipal waste combustor capacity?
Model Rule—Recordkeeping60.6575 – 60.6600
§ 60.6575What records must I keep?
§ 60.6580Where must I keep my records and for how long?
§ 60.6585What records must I keep for operator training and certification?
§ 60.6590What records must I keep for stack tests?
§ 60.6595What records must I keep for continuously monitored pollutants or parameters?
§ 60.6600What records must I keep for municipal waste combustors that use activated carbon?
Model Rule—Reporting60.6605 – 60.6650
§ 60.6605What reports must I submit and in what form?
§ 60.6610What are the appropriate units of measurement for reporting my data?
§ 60.6615When must I submit the initial performance test report?
§ 60.6620What must I include in my initial performance test report?
§ 60.6625When must I submit the annual report?
§ 60.6630What must I include in my annual report?
§ 60.6635What must I do if I am out of compliance with the requirements of this subpart?
§ 60.6640If a semiannual report is required, when must I submit it?
§ 60.6645What must I include in the semiannual out-of-compliance reports?
§ 60.6650Can reporting dates be changed?
Model Rule—Air Curtain Incinerators That Burn 100 Percent Wood Waste, Clean Lumber, and Yard Waste60.6655 – 60.6680
§ 60.6655What is an air curtain incinerator?
§ 60.6660What is yard waste?
§ 60.6665What are the emission limits for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6670How must I monitor opacity for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6675What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent wood waste, clean lumber, and/or yard waste?
§ 60.6680What equations must I use?
Definitions60.6685
§ 60.6685What definitions apply to this subpart?
Table 1 to Subpart WWWW of Part 60
Model Rule—Compliance Schedules and Increments of Progress
Table 2 to Subpart WWWW
Municipal Waste Combustor Carbon Monoxide Guidelines
Table 3 to Subpart WWWW of Part 60
Model Rule—Emission Limits for Existing Large Municipal Waste Combustors
Table 4 to Subpart WWWW of Part 60
Requirements for Continuous Emission Monitoring Systems (CEMS)
Table 5 to Subpart WWWW
Performance Test Requirements for Compliance With Emissions Limits Under § 60.6450
Appendix A-1 to Part 60
Test Methods 1 through 2F
Appendix A-2 to Part 60
Test Methods 2G through 3C
Appendix A-3 to Part 60
Test Methods 4 through 5I
Appendix A-4 to Part 60
Test Methods 6 through 10B
Appendix A-5 to Part 60
Test Methods 11 through 15A
Appendix A-6 to Part 60
Test Methods 16 through 18
Appendix A-7 to Part 60
Test Methods 19 through 25E
Appendix A-8 to Part 60
Test Methods 26 through 30B
Appendix B to Part 60
Performance Specifications
Appendix C to Part 60
Determination of Emission Rate Change
Appendix D to Part 60
Required Emission Inventory Information
Appendix E to Part 60 [Reserved]
Appendix F to Part 60
Quality Assurance Procedures
Appendix G to Part 60
Provisions for an Alternative Method of Demonstrating Compliance With 40 CFR 60.43 for the Newton Power Station of Central Illinois Public Service Company
Appendix H to Part 60 [Reserved]
Appendix I to Part 60
Owner's Manuals and Temporary Labels for Wood Heaters Subject to Subparts AAA and QQQQ of Part 60
Appendix J to Part 60 [Reserved]
Appendix K to Part 60
Determination of Volatile Organic Compound and Greenhouse Gas Leaks Using Optical Gas Imaging