Site Feedback

Title 30

Displaying title 30, up to date as of 6/11/2026. Title 30 was last amended 6/10/2026.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

§ 250.601 Definitions.

When used in this subpart, the following terms shall have the meanings given below:

Expected surface pressure means the highest pressure predicted to be exerted upon the surface of a well. In calculating expected surface pressure, you must consider reservoir pressure as well as applied surface pressure.

Routine operations mean any of the following operations conducted on a well with the tree installed:

(a) Cutting paraffin;

(b) Removing and setting pump-through-type tubing plugs, gas-lift valves, and subsurface safety valves which can be removed by wireline operations;

(c) Bailing sand;

(d) Pressure surveys;

(e) Swabbing;

(f) Scale or corrosion treatment;

(g) Caliper and gauge surveys;

(h) Corrosion inhibitor treatment;

(i) Removing or replacing subsurface pumps;

(j) Through-tubing logging (diagnostics);

(k) Wireline fishing; and

(l) Setting and retrieving other subsurface flow-control devices.

(m) Acid treatments.

Workover operations mean the work conducted on wells after the initial completion for the purpose of maintaining or restoring the productivity of a well.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21976, May 15, 2019]