Site Feedback

Title 30

Displaying title 30, up to date as of 7/14/2026. Title 30 was last amended 6/29/2026.
eCFR Content

The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 30Mineral ResourcesPart / Section
Chapter IIBureau of Safety and Environmental Enforcement, Department of the Interior200 – 299
Subchapter BOffshore250 – 285
Part 250Oil and Gas and Sulphur Operations in the Outer Continental Shelf250.101 – 250.1933
Subpart AGeneral250.101 – 250.199
Authority and Definition of Terms250.101 – 250.105
§ 250.101Authority and applicability.
§ 250.102What does this part do?
§ 250.103Where can I find more information about the requirements in this part?
§ 250.104How may I appeal a decision made under BSEE regulations?
§ 250.105Definitions.
Performance Standards250.106 – 250.117
§ 250.106What standards will the Director use to regulate lease operations?
§ 250.107What must I do to protect health, safety, property, and the environment?
§ 250.108What requirements must I follow for cranes and other material-handling equipment?
§ 250.109What documents must I prepare and maintain related to welding?
§ 250.110What must I include in my welding plan?
§ 250.111Who oversees operations under my welding plan?
§ 250.112What standards must my welding equipment meet?
§ 250.113What procedures must I follow when welding?
§ 250.114How must I install, maintain, and operate electrical equipment?
§ 250.115What are the procedures for, and effects of, incorporation of documents by reference in this part?
§§ 250.116-250.117 [Reserved]
Gas Storage or Injection250.118 – 250.124
§ 250.118Will BSEE approve gas injection?
§ 250.119 [Reserved]
§ 250.120How does injecting, storing, or treating gas affect my royalty payments?
§ 250.121What happens when the reservoir contains both original gas in place and injected gas?
§ 250.122What effect does subsurface storage have on the lease term?
§ 250.123 [Reserved]
§ 250.124Will BSEE approve gas injection into the cap rock containing a sulphur deposit?
Fees250.125 – 250.126
§ 250.125Service fees.
§ 250.126Electronic payment instructions.
Inspections of Operations250.130 – 250.133
§ 250.130Why does BSEE conduct inspections?
§ 250.131Will BSEE notify me before conducting an inspection?
§ 250.132What must I do when BSEE conducts an inspection?
§ 250.133Will BSEE reimburse me for my expenses related to inspections?
Disqualification250.135 – 250.136
§ 250.135What will BSEE do if my operating performance is unacceptable?
§ 250.136How will BSEE determine if my operating performance is unacceptable?
Special Types of Approvals250.140 – 250.146
§ 250.140When will I receive an oral approval?
§ 250.141May I ever use alternate procedures or equipment?
§ 250.142How do I receive approval for departures?
§§ 250.143-250.144 [Reserved]
§ 250.145How do I designate an agent or a local agent?
§ 250.146Who is responsible for fulfilling leasehold obligations?
Naming and Identifying Facilities and Wells (Does Not Include MODUs)250.150 – 250.167
§ 250.150How do I name facilities and wells in the Gulf of America Region?
§ 250.151How do I name facilities in the Pacific Region?
§ 250.152How do I name facilities in the Alaska Region?
§ 250.153Do I have to rename an existing facility or well?
§ 250.154What identification signs must I display?
§§ 250.160-250.167 [Reserved]
Suspensions250.168 – 250.177
§ 250.168May operations or production be suspended?
§ 250.169What effect does suspension have on my lease?
§ 250.170How long does a suspension last?
§ 250.171How do I request a suspension?
§ 250.172When may the Regional Supervisor grant or direct an SOO or SOP?
§ 250.173When may the Regional Supervisor direct an SOO or SOP?
§ 250.174When may the Regional Supervisor grant or direct an SOP?
§ 250.175When may the Regional Supervisor grant an SOO?
§ 250.176Does a suspension affect my royalty payment?
§ 250.177What additional requirements may the Regional Supervisor order for a suspension?
Primary Lease Requirements, Lease Term Extensions, and Lease Cancellations250.180 – 250.185
§ 250.180What am I required to do to keep my lease term in effect?
§§ 250.181-250.185 [Reserved]
Information and Reporting Requirements250.186 – 250.197
§ 250.186What reporting information and report forms must I submit?
§ 250.187What are BSEE's incident reporting requirements?
§ 250.188What incidents must I report to BSEE and when must I report them?
§ 250.189Reporting requirements for incidents requiring immediate notification.
§ 250.190Reporting requirements for incidents requiring written notification.
§ 250.191How does BSEE conduct incident investigations?
§ 250.192What reports and statistics must I submit relating to a hurricane, earthquake, or other natural occurrence?
§ 250.193Reports and investigations of possible violations.
§ 250.194How must I protect archaeological resources?
§ 250.195What notification does BSEE require on the production status of wells?
§ 250.196Reimbursements for reproduction and processing costs.
§ 250.197Data and information to be made available to the public or for limited inspection.
References250.198 – 250.199
§ 250.198Documents incorporated by reference.
§ 250.199Paperwork Reduction Act statements—information collection.