The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Statements of General Policy and Interpretations Under the Federal Power Act

Authority:

Sections 2.2 through 2.13, issued under sec. 309, 49 Stat. 858; 16 U.S.C. 825h, unless otherwise noted.

§ 2.2 Transmission lines.

In a public statement dated March 7, 1941, the Commission announced its determination that transmission lines which are not primary lines transmitting power from the power house or appurtenant works of a project to the point of junction with the distribution system or with the interconnected primary transmission system as set forth in section 3(11) of the Act are not within the licensing authority of the Commission, and directed that future applications filed with it for such licenses be referred for appropriate action to the Federal department having supervision over the lands or waterways involved.

[Order 141, 12 FR 8471, Dec. 19, 1947. Redesignated by Order 147, 13 FR 8259, Dec. 23, 1948]

§ 2.4 Suspension of rate schedules.

The Commission approved and adopted on May 29, 1945, the following conclusions as to its powers of suspension of rate schedules under section 205 of the act:

(a) The Commission cannot suspend a rate schedule after its effective date.

(b) The Commission can suspend any new schedule making any change in an existing filed rate schedule, including any rate, charge, classification, or service, or in any rule, regulation, or contract relating thereto, contained in the filed schedule.

(c) Included in such changes which may be suspended are:

(1) Increases.

(2) Reductions.

(3) Discriminatory changes.

(4) Cancellation or notice of termination.

(5) Changes in classification, service, rule, regulation or contract.

(d) Immaterial, unimportant or routine changes will not be suspended.

(e) During suspension, the prior existing rate schedule continues in effect and should not be changed during suspension.

(f) Changes under escalator clauses may be suspended as changes in existing filed schedules.

(g) Suspension of a rate schedule, within the ambit of the Commission's statutory authority is a matter within the discretion of the Commission.

[Order 141, 12 FR 8471, Dec. 19, 1947. Redesignated by Order 147, 13 FR 8259, Dec. 23, 1948, and amended by Order 303, 48 FR 24361, June 1, 1983; Order 575, 60 FR 4852, Jan. 25, 1995]

§ 2.7 Recreational development at licensed projects.

The Commission will evaluate the recreational resources of all projects under Federal license or applications therefor and seek, within its authority, the ultimate development of these resources, consistent with the needs of the area to the extent that such development is not inconsistent with the primary purpose of the project. Reasonable expenditures by a licensee for public recreational development pursuant to an approved plan, including the purchase of land, will be included as part of the project cost. The Commission will not object to licensees and operators of recreational facilities within the boundaries of a project charging reasonable fees to users of such facilities in order to help defray the cost of constructing, operating, and maintaining such facilities. The Commission expects the licensee to assume the following responsibilities:

(a) To acquire in fee and include within the project boundary enough land to assure optimum development of the recreational resources afforded by the project. To the extent consistent with the other objectives of the license, such lands to be acquired in fee for recreational purposes shall include the lands adjacent to the exterior margin of any project reservoir plus all other project lands specified in any approved recreational use plan for the project.

(b) To develop suitable public recreational facilities upon project lands and waters and to make provisions for adequate public access to such project facilities and waters and to include therein consideration of the needs of persons with disabilities in the design and construction of such project facilities and access.

(c) To encourage and cooperate with appropriate local, State, and Federal agencies and other interested entities in the determination of public recreation needs and to cooperate in the preparation of plans to meet these needs, including those for sport fishing and hunting.

(d) To encourage governmental agencies and private interests, such as operators of user-fee facilities, to assist in carrying out plans for recreation, including operation and adequate maintenance of recreational areas and facilities.

(e) To cooperate with local, State, and Federal Government agencies in planning, providing, operating, and maintaining facilities for recreational use of public lands administered by those agencies adjacent to the project area.

(f)

(1) To comply with Federal, State and local regulations for health, sanitation, and public safety, and to cooperate with law enforcement authorities in the development of additional necessary regulations for such purposes.

(2) To provide either by itself or through arrangement with others for facilities to process adequately sewage, litter, and other wastes from recreation facilities including wastes from watercraft, at recreation facilities maintained and operated by the licensee or its concessionaires.

(g) To ensure public access and recreational use of project lands and waters without regard to race, color, sex, religious creed or national origin.

(h) To inform the public of the opportunities for recreation at licensed projects, as well as of rules governing the accessibility and use of recreational facilities.

[Order 313, 30 FR 16198, Dec. 29, 1965, as amended by Order 375-B, 35 FR 6315, Apr. 18, 1970; Order 508, 39 FR 16338, May 8, 1974; Order 2002, 68 FR 51115, Aug. 25, 2003]

§ 2.8 [Reserved]

§ 2.9 Conditions in preliminary permits and licenses—list of and citations to “P—” and “L—” forms.

(a) The Commission has approved several sets of standard conditions for normal inclusion in preliminary permits or licenses for hydroelectric developments. In a special situation, of course, the Commission in issuing a permit or license for a project will modify or eliminate a particular article (condition). For reference purposes the sets of conditions are designated as “Forms”—those for preliminary permits are published in Form P-1, and those for licenses are published in Form L's. There are different Form L's for different types of licenses, and the forms have been revised from time to time. Thus at any given time there will be several series of standard forms applicable to the various vintages of different types of licenses. The forms and their revisions are published on the Commission's Web site (www.ferc.gov/industries/hydropower/gen-info/comp-admin/l-forms.asp).

(b) Forms currently in use may be obtained on the Commission's Web site or from Federal Energy Regulatory Commission, Washington, DC 20426.

[Order 348, 32 FR 8521, June 14, 1967, as amended by Order 540, 40 FR 51998, Nov. 7, 1975; Order 567, 42 FR 30612, June 16, 1977; Order 699, 72 FR 45323, Aug. 14, 2007; Order 737, 75 FR 43402, July 26, 2010; Order 756, 77 FR 4893, Feb. 1, 2012]

§ 2.12 Calculation of taxes for property of public utilities and licensees constructed or acquired after January 1, 1970.

Pursuant to the provisions of section 441(a)(4)(A) of the Tax Reform Act of 1969, 83 Stat. 487, 625, public utilities and licensees regulated by the Commission under the Federal Power Act which have exercised the option provided by that section to change from flow through accounting will be permitted by the Commission, with respect to liberalized depreciation, to employ a normalization method for computing federal income taxes in their accounts and annual reports with respect to property constructed or acquired after January 1, 1970, to the extent with which such property increases the productive or operational capacity of the utility and is not a replacement of existing capacity. Such normalization will also be permitted for ratemaking purposes to the extent such rates are subject to the Commission's ratemaking authority. As to balances in Account 282 of the Uniform System of Accounts, “Accumulated deferred income taxes—Other property,” it will remain the Commission's policy to deduct such balances from rate base in rate proceedings.

[Order 404, 35 FR 7964, May 23, 1970, as amended by Order 567, 42 FR 30612, June 16, 1977]

§ 2.13 Design and construction.

(a) The Commission recognizes the importance of protecting and enhancing natural, historic, scenic, and recreational values at projects licensed or proposed to be licensed under the Federal Power Act.

(b) In furtherance of these policies, the Commission will not

(1) permit the amendment of any license for the purpose of construction of additional facilities or

(2) authorize the disposition of any interest in project lands for construction of any type, unless a showing is made that the construction will be designed to avoid or minimize conflict with the natural, historic, and scenic values and resources of the project area.

[Order 414, 35 FR 18586, Dec. 8, 1970, as amended by Order 567, 42 FR 30612, June 16, 1977; Order 737, 75 FR 43402, July 26, 2010; Order 756, 77 FR 4893, Feb. 1, 2012; 77 FR 8095, Feb. 14, 2012]

§ 2.15 Specified reasonable rate of return.

(a) Pursuant to section 10(d) of the Federal Power Act, the Commission has determined that the specified reasonable rate of return used in computing amortization reserves for hydroelectric project licenses shall be calculated annually based on current capital ratios developed from an average of 13 monthly balances of amounts properly includible in the licensee's long-term debt and proprietary capital accounts, as listed in the Commission's Uniform System of Accounts. The cost rate for such ratios shall be the weighted average cost of long-term debt and preferred stock for the year, and the cost of common equity shall be the interest rate on 10-year government bonds (reported as the Treasury Department's 10-year constant maturity series) computed on the monthly average for the year in question, plus four percentage points (400 basis points).

(b) The Statement of Policy adopted herein shall be effective upon issuance of this order.

(c) The Secretary shall cause prompt publication of this order to be made in the Federal Register.

(d) All requests and suggestions not specifically dealt with herein are hereby denied.

(e) The Secretary is hereby authorized to change the appropriate license article upon application by the licensees to reflect the specified reasonable rate of return as adopted herein.

(f) This section shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this section and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this section accordingly.

[Order 550, 41 FR 27032, July 1, 1976, as amended by Order 914, 90 FR 48401, Oct. 21, 2025]

§ 2.17 Price discrimination and anticompetitive effect (price squeeze issue).

To implement compliance with the Supreme Court decision in F.P.C. v. Con-Way Corp., 426 U.S. 271 (1976), aff'g 510 F. 2d 1264 (D.C. Cir. 1975) and to expedite the consideration of price squeeze issues in wholesale electric rate proceedings, the Commission adopts the following procedures for raising price squeeze issues which are to be followed unless they are demonstrated in an individual case to be inadequate:

(a) Any wholesale customer, state commission or other interested person may file petitions to intervene alleging price discrimination and anticompetitive effects of the wholesale rates. In order to have the issue of price discrimination considered in the rate proceeding, the intervening customer or other interested person must support its allegation by a prima facie case. The elements of the prima facie case shall include at a minimum:

(1) Specification of the filing utility's retail rate schedules with which the intervening wholesale customer is unable to compete due to purchased power costs;

(2) A showing that a competitive situation exists in that the wholesale customer competes in the same market as the filing utility;

(3) A showing that the retail rates are lower than the proposed wholesale rates for comparable service;

(4) The wholesale customer's prospective rate for comparable retail service, i.e. the rate necessary to recover bulk power costs (at the proposed wholesale rate) and distribution costs;

(5) An indication of the reduction in the wholesale rate necessary to eliminate the price squeeze alleged.

(b) Where price squeeze is alleged, the Commission shall, in the order granting intervention, direct the Administrative Law Judge to convene a prehearing conference within 15 days from the date of the order for the purpose of hearing intervenors' request for data required to present their case, including prima facie showing, on price squeeze issues.

(c) Within 30 days from the date of the conference the filing utility shall respond to the data requests authorized by the Administrative Law Judge.

(d) Within 30 days from the filing utility's response, the intervenors shall file their case-in-chief on price squeeze issues, which shall include their prima facie case, unless filed previously.

(e) The burden of proof (i.e. the risk of nonpersuasion) to rebut the allegations of price squeeze and to justify the proposed rates are on the utility proposing the rates under section 205(e) of the Federal Power Act.

(f) In proceedings where price squeeze is an issue, the Secretary shall include the state commission, agency or body which is responsible for regulation of retail rates in the state affected in the service list maintained under § 385.2010(c) of this chapter.

[Order 563, 42 FR 16132, Mar. 25, 1977, as amended by Order 225, 47 FR 19054, May 3, 1982]

§ 2.18 Phased electric rate increase filings.

(a) In general, when a public utility files a phased rate increase, the Commission will determine the appropriate suspension period based on the total increase requested in all phases. If a utility files a rate increase within sixty days after filing another rate increase, the Commission will consider the filings together to be a phased rate increase request.

(b) This policy will not be applied if the increase is phased:

(1) To coordinate with new facilities coming on line;

(2) To implement a rate moderation plan;

(3) To avoid price squeeze;

(4) To comply with a settlement approved by the Commission; or

(5) If the utility makes a convincing showing that application of the policy would be harsh and inequitable and that, therefore, good cause has been shown not to apply the policy in the case.

(c) This section shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this section and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this section accordingly.

[52 FR 11, Jan. 11, 1987, as amended by Order 914, 90 FR 48401, Oct. 21, 2025]

§ 2.19 State and Federal comprehensive plans.

(a) In determining whether the proposed hydroelectric project is best adapted to a comprehensive plan under section (10)(a)(1) of the Federal Power Act for improving or developing a waterway, the Commission will consider the extent to which the project is consistent with a comprehensive plan (where one exists) for improving, developing, or conserving a waterway or waterways affected by the project that is prepared by:

(1) An agency established pursuant to Federal law that has the authority to prepare such a plan, or

(2) A state agency, of the state in which the facility is or will be located, authorized to conduct such planning pursuant to state law.

(b) The Commission will treat as a state or Federal comprehensive plan a plan that:

(1) Is a comprehensive study of one or more of the beneficial uses of a waterway or waterways;

(2) Includes a description of the standards applied, the data relied upon, and the methodology used in preparing the plan; and

(3) Is filed with the Secretary of the Commission.

[Order 481-A, 53 FR 15804, May 4, 1988]

§ 2.20 Good faith requests for transmission services and good faith responses by transmitting utilities.

(a) General Policy.

(1) This Statement of Policy is adopted in furtherance of the goals of sections 211(a) and 213(a) of the Federal Power Act, as amended and added by the Energy Policy Act of 1992.

(2) Under section 211(a), the Commission may issue an order requiring a transmitting utility to provide transmission services (including any enlargement of transmission capacity necessary to provide such services) only if an applicant has made a request for transmission services to the transmitting utility that would be the subject of such order at least 60 days prior to its filing of an application for such order. The requirement in section 211(a) that an applicant make such a request will be met if such an applicant has, pursuant to section 213(a) of the FPA, made a good faith request to a transmitting utility to provide wholesale transmission services and requests specific rates and charges, and other terms and conditions.

(3) It is the Commission's intention to apply the standards of this Statement of Policy when determining whether and when a valid “good faith” request for service was made.

(4) It is the Commission's intention to encourage an open exchange of information that exhibits a reasonable degree of specificity and completeness between the party requesting transmission services and the transmitting utility.

(5) The Commission intends to apply this Statement of Policy so as to carry out Congress' objective that, subject to appropriate terms and conditions and just and reasonable rates, in conformance with section 212 of the FPA, access to the electric transmission system for the purposes of wholesale transactions be more widely available.

(b) The Components of a good faith request. The Commission generally considers the following to constitute the minimum components of a good faith request for transmission services:

(1) The identity, address, telephone number, and facsimile number of the party requesting transmission services, and the same information, if different, for the party's contact person or persons.

(2) A statement that the party requesting transmission services is, or will be upon commencement of service, an entity eligible to request transmission under sections 211(a) and 213(a) of the FPA.

(3) A statement that the request for transmission services is intended to satisfy the “request for transmission services” requirement under sections 211(a) and 213(a) of the FPA, and that the request is not a request for mandatory retail wheeling prohibited under section 212(h) of the FPA.

(4) The party requesting transmission services should specify the character and nature of the services requested. Some types of service may require more detailed information than others. Where point-to-point service is requested, the party requesting transmission services should specify the anticipated point(s) of receipt to the transmitting utility's grid and the anticipated point(s) of delivery from the transmitting utility's grid. Where a party requesting transmission services requests additional flexibility to schedule multiple resources to meet its needs (e.g., network service), the request for services should contain a description of the requested services in sufficient detail to permit the transmitting utility to model the additional services on its transmission system.

(5) The names of any other parties likely to provide transmission service to deliver electric energy to, and receive electric energy from, the transmitting utility's grid in connection with the requested transmission services.

(6) The proposed dates for initiating and terminating the requested transmission services.

(7) The total amount of transmission capacity being requested.

(8) To the extent it is known or can be estimated, a description of the “expected transaction profile” including load factor data describing the hourly quantities of power and energy the party requesting transmission services would expect to deliver to the transmitting utility's grid at relevant points of interconnection. In the event delivery is to multiple points within the transmitting utility's electric control area, the requestor should describe, to the extent it is known or can be estimated, the expected load (over a given duration of time) at each such delivery point.

(9) Whether firm or non-firm service is being requested. Where a party requests non-firm service, it should specify the priority of service it is willing to accept, or the conditions under which it is willing to accept interruption or curtailment, if known.

(10) A statement as to whether the request is being made in response to a solicitation and a copy of the solicitation if publicly available. This will help the transmitting utility determine whether requests for transmission service are duplicative or mutually exclusive of requests filed by other parties.

(11) The proposed rates, terms and conditions for the requested transmission services as required by section 213(a). It is not necessary for the requestor to propose a specific numerical rate. Rather, a party requesting transmission services can fulfill the rates, terms and conditions requirement by specifying a rate methodology (e.g., embedded or incremental cost) or by referencing an existing formula rate, transmission tariff, or transmission contract. The validity of the good faith request will not depend on the rates proposed by the party requesting transmission services. This requirement is not intended to allow utilities to delay responses to requests for transmission services, or to deny requests for transmission services on the basis of an overly rigid or technical approach to the “rates, terms and conditions” element of the request.

(12) Any other information to facilitate the expeditious processing of its request. Such information will improve the negotiation process, reduce costs, and will improve chances to arrange the requested transmission without resorting to section 211 application procedures before the Commission.

(c) Components of a Reply to a Good Faith Request. The Commission generally considers the following to constitute the minimum components of a reply to a good faith request for transmission services under section 213(a):

(1) Unless the parties agree to a different time frame, the transmitting utility must acknowledge the request within 10 days of receipt. The acknowledgement must include a date by which a response will be sent to the party requesting transmission services and a statement of any fees associated with responding to the request (e.g., initial studies).

(2) The transmitting utility may ask the applicant to provide clarification of only the information needed to evaluate and process a “good faith” request. If the person requesting transmission services believes the transmitting utility is attempting to frustrate the process by making excessive requests for clarification, it may raise this issue if, and when, it files a request for a section 211 order with the Commission.

(3) The transmitting utility must respond to a request within 60 days of receipt or some other mutually agreed upon response date. If both parties agree to an alternative schedule, the agreement must be in writing and signed by both parties.

(4) If the transmitting utility determines that it can provide all the requested services from existing capacity, it should respond by offering the party requesting transmission services an executable service agreement that at a minimum contains the following information:

(i) A description of the proposed transmission rate and any other costs. It is not necessary for the proposed service agreement to contain a fully developed cost-of-service. However, the agreement should explain the basis for the charges for each component of service, including the unbundled components of any transmission rate as well as any other charges.

(ii) The proposed service agreement should explicitly describe all of the applicable terms and conditions of the transmission services provided under the agreement.

(iii) The transmitting utility should accompany the proposed service agreement with a clear statement of the time during which the offer to provide the transmission services will remain open. An open agreement offer may obligate the seller while imposing no countervailing obligation on the purchaser, and an unexecuted contract potentially ties up transmission facilities, thus jeopardizing the availability and price for subsequent requests that would use the same facilities. However, at a minimum, a transmitting utility should permit the party requesting transmission services sufficient time to review service agreements and coordinate multiple stages of joint transactions.

(5) If the transmitting utility determines that it must construct additional facilities or modify existing facilities to provide all or part of the requested services, it must:

(i) Identify the specific constraints and their duration that prevent it from providing all the requested services and explain how these constraints prevent it from providing all the requested services or the desired level of firmness.

(ii) Provide to the applicant all studies, computer input and output data, planning, operating and other documents, work papers, assumptions and any other material that forms the basis for determining the constraints.

(iii) Offer to the applicant an executable agreement under which the applicant agrees to reimburse the transmitting utility for all costs of performing any studies necessary to determine what changes to the transmitting utility's grid are needed to overcome the constraint and provide the requested services, their cost, and the estimated time to complete them. At a minimum, the proposed agreement should contain the following:

(A) An estimate of the cost of the study and the time required to complete it, and

(B) A commitment to supply to the party requesting transmission services all computer input and output data, planning, operating and other documents, work papers, assumptions and any other material used to perform the study.

(iv) If a transmitting utility determines that it can provide part but not all of the requested services without building new facilities, it should inform the applicant of any portion of the requested services that can be performed without constructing additional facilities or modifying existing facilities. In effect, the transmitting utility may be able to treat such a request as two separate transactions—one for service on existing facilities and the other as a request involving expansion decisions. Furthermore, where there are alternative, less expensive means of satisfying all or a portion of a transmission request, the Commission expects the transmitting utility to explore such alternatives (e.g., redispatching certain generating units to alleviate a constraint).

[58 FR 38969, July 21, 1993]

§ 2.21 Regional Transmission Groups.

(a) General policy. The Commission encourages Regional Transmission Groups (RTGs) as a means of enabling the market for electric power to operate in a more competitive and efficient way. The Commission believes that RTGs can provide a means of coordinating regional planning of the transmission system and assuring that system capabilities are always adequate to meet system demands. RTG agreements that contain components that satisfy paragraphs (b) and (c) of this section generally will be considered to be just, reasonable, and not unduly discriminatory or preferential under the Federal Power Act (FPA). The Commission encourages RTG agreements that contain as much detail as possible in all of the components listed, particularly if the RTG participants will be seeking Commission deference to decisions reached under an RTG agreement.

(b) Organizational components.

(1) An RTG agreement should provide for broad membership and, at a minimum, allow any entity that is subject to, or eligible to apply for, an order under section 211 of the FPA to be a member. An RTG agreement should encompass an area of sufficient size and contiguity to enable members to provide transmission services in a reliable, efficient, and competitive manner.

(2) An RTG agreement should provide a means of adequate consultation and coordination with relevant state regulatory, siting, and other authorities.

(3) An RTG agreement should include fair and nondiscriminatory governance and decision making procedures, including voting procedures.

(c) Other components.

(1) An RTG agreement should impose on member transmitting utilities an obligation to provide transmission services for other members, including the obligation to enlarge facilities, on a basis that is consistent with sections 205, 206, 211, 212 and 213 of the FPA. To the extent practicable and known, the RTG agreement should specify the terms and conditions under which transmission services will be offered.

(2) An RTG agreement should require, at a minimum, the development of a coordinated transmission plan on a regional basis and the sharing of transmission planning information, with the goal of efficient use, expansion, and coordination of the interconnected electric system on a grid-wide basis. An RTG agreement should provide mechanisms to incorporate the transmission needs of non-members into regional plans. An RTG agreement should include as much detail as possible with regard to operational and planning procedures.

(3) An RTG agreement should include voluntary dispute resolution procedures that provide a fair alternative to resorting in the first instance to section 206 complaints or section 211 proceedings.

(4) An RTG agreement should include an exit provision for RTG members that leave the RTG, specifying the obligations of a departing member.

(d) Filing procedures. Any proposed RTG agreement that in any manner affects or relates to the transmission of electric energy in interstate commerce by a public utility, or rates or charges for such transmission, must be filed with the Commission. Any public utility member of a proposed RTG may file the RTG agreement with the Commission on behalf of the other public utility members under section 205 of the FPA.

(e) Sunsetting provisions. This section shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this section and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this section accordingly.

[58 FR 41632, Aug. 5, 1993, as amended by Order 914, 90 FR 48401, Oct. 21, 2025]

§ 2.22 Pricing policy for transmission services provided under the Federal Power Act.

(a) The Commission has adopted a Policy Statement on its pricing policy for transmission services provided under the Federal Power Act. That Policy Statement can be found at 69 FERC 61,086. The Policy Statement constitutes a complete description of the Commission's guidelines for assessing the pricing proposals. Paragraph (b) of this section is only a brief summary of the Policy Statement.

(b) The Commission endorses transmission pricing flexibility, consistent with the principles and procedures set forth in the Policy Statement. It will entertain transmission pricing proposals that do not conform to the traditional revenue requirement as well as proposals that conform to the traditional revenue requirement. The Commission will evaluate “conforming” transmission pricing proposals using the following five principles, described more fully in the Policy Statement.

(1) Transmission pricing must meet the traditional revenue requirement.

(2) Transmission pricing must reflect comparability.

(3) Transmission pricing should promote economic efficiency.

(4) Transmission pricing should promote fairness.

(5) Transmission pricing should be practical.

(c) Under these principles, the Commission will also evaluate “non-conforming” proposals which do not meet the traditional revenue requirement, and will require such proposals to conform to the comparability principle. Non-conforming proposals must include an open access comparability tariff and will not be allowed to go into effect prior to review and approval by the Commission under procedures described in the Policy Statement.

[59 FR 55039, Nov. 3, 1994]

§ 2.23 Use of reserved authority in hydropower licenses to ameliorate cumulative impacts.

The Commission will address and consider cumulative impact issues at original licensing and relicensing to the fullest extent possible consistent with the Commission's statutory responsibility to avoid undue delay in the relicensing process and to avoid undue delay in the amelioration of individual project impacts at relicensing. To the extent, if any, that it is not possible to explore and address all cumulative impacts at relicensing, the Commission will reserve authority to examine and address such impacts after the new license has been issued, but will define that reserved authority as narrowly and with as much specificity as possible, particularly with respect to the purpose of reserving that authority. The Commission intends that such articles will describe, to the maximum extent possible, reasonably foreseeable future resource concerns that may warrant modifications of the licensed project. Before taking any action pursuant to such reserved authority, the Commission will publish notice of its proposed action and will provide an opportunity for hearing by the licensee and all interested parties. Hydropower licenses also contain standard “reopener” articles (see § 2.9 of this part) which reserve authority to the Commission to require, among other things, licensees of projects located in the same river basin to mitigate the cumulative impacts of those projects on the river basin. In light of the policy described above, the Commission will use the standard “reopener” articles to explore and address cumulative impacts only (except in extraordinary circumstances) where such impacts were not known at the time of licensing or are the result of changed circumstances. The Commission has authority under the Federal Power Act to require licensees, during the term of the license, to develop and provide data to the Commission on the cumulative impacts of licensed projects located in the same river basin. In issuing both new and original licenses, the Commission will coordinate the expiration dates of the licenses to the maximum extent possible, to maximize future consideration of cumulative impacts at the same time in contemporaneous proceedings at relicensing. The Commission's intention is to consider to the extent practicable cumulative impacts at the time of licensing and relicensing, and to eliminate the need to resort to the use of reserved authority.

[59 FR 66718, Dec. 28, 1994]

§ 2.24 Project decommissioning at relicensing.

The Commission issued a statement of policy on project decommissioning at relicensing in Docket No. RM93-23-000 on December 14, 1994.

[60 FR 347, Jan. 4, 1995]

§ 2.25 Ratemaking treatment of the cost of emissions allowances in coordination transactions.

(a) General Policy. This Statement of Policy is adopted in furtherance of the goals of Title IV of the Clean Air Act Amendments of 1990, Pub. L. 101-549, Title IV, 104 Stat. 2399, 2584 (1990).

(b) Costing Emissions Allowances in Coordination Sales. If a public utility's coordination rate on file with the Commission provides for recovery of variable costs on an incremental basis, the Commission will allow recovery of the incremental costs of emissions allowances associated with a coordination sale. If a coordination rate does not reflect incremental costs, the public utility should propose alternative allowance costing methods or demonstrate that the coordination rate does not produce unreasonable results. The Commission finds that the cost to replace an allowance is an appropriate basis to establish the incremental cost.

(c) Use of Indices. The Commission will allow public utilities to determine emissions allowance costs on the basis of an index or combination of indices of the current price of emissions allowances, provided that the public utility affords purchasing utilities the option of providing emissions allowances. Public utilities should explain and justify any use of different incremental cost indices for pricing coordination sales and making dispatch decisions.

(d) Calculation of Amount of Emissions Allowances Associated With Coordination Transactions. Public utilities should explain the methods used to compute the amount of emissions allowances included in coordination transactions.

(e) Timing.

(1) Public utilities should provide information to purchasing utilities regarding the timing of opportunities for purchasers to stipulate whether they will purchase or return emissions allowances. A public utility may require a purchasing utility to declare, no later than the beginning of the coordination transaction:

(i) Whether it will purchase or return emissions allowances; and

(ii) If it will return emissions allowances, the date on which those allowances will be returned.

(2) Public utilities may include in agreements with purchasing utilities non-discriminatory provisions for indemnification if the purchasing utility fails to provide emissions allowances by the date on which it declares that the allowances will be returned.

(f) Other Costing Methods Not Precluded. The ratemaking treatment of emissions allowance costs endorsed in this Policy Statement does not preclude other approaches proposed by individual utilities on a case-by-case basis.

(g) Sunsetting provisions. This section shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this section and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this section accordingly.

[59 FR 65938, Dec. 22, 1994, as amended by Order 579, 60 FR 22261, May 5, 1995; Order 914, 90 FR 48402, Oct. 21, 2025]

§ 2.26 Policies concerning review of applications under section 203.

(a) The Commission has adopted a Policy Statement on its policies for reviewing transactions subject to section 203. That Policy Statement can be found at 77 FERC ¶ 61,263 (1996). The Policy Statement is a complete description of the relevant guidelines. Paragraphs (b)-(e) of this section are only a brief summary of the Policy Statement.

(b) Factors Commission will generally consider. In determining whether a proposed transaction subject to section 203 is consistent with the public interest, the Commission will generally consider the following factors; it may also consider other factors:

(1) The effect on competition;

(2) The effect on rates; and

(3) The effect on regulation.

(c) Effect on competition. Applicants should provide data adequate to allow analysis under the Department of Justice/Federal Trade Commission Merger Guidelines, as described in the Policy Statement and Appendix A to the Policy Statement.

(d) Effect on rates. Applicants should propose mechanisms to protect customers from costs due to the merger. If the proposal raises substantial issues of relevant fact, the Commission may set this issue for hearing.

(e) Effect on regulation.

(1) Where the affected state commissions have authority to act on the transaction, the Commission will not set for hearing whether the transaction would impair effective regulation by the state commissions. The application should state whether the state commissions have this authority.

(2) Where the affected state commissions do not have authority to act on the transaction, the Commission may set for hearing the issue of whether the transaction would impair effective state regulation.

(f) Under section 203(a)(4) of the Federal Power Act (16 U.S.C. 824b), in reviewing a proposed transaction subject to section 203, the Commission will also consider whether the proposed transaction will result in cross-subsidization of a non-utility associate company or pledge or encumbrance of utility assets for the benefit of an associate company, unless that cross-subsidization, pledge, or encumbrance will be consistent with the public interest.

(g) Sunsetting provisions. This section shall cease to have effect on December 5, 2026, unless the Commission determines that the cessation deadline should be extended to a date not more than 5 years in the future after offering the public an opportunity to provide input on the costs and benefits of this section and considering that input. The Commission will publish a document in the Federal Register announcing its determination and revising or removing this section accordingly.

[Order 592, 61 FR 68606, Dec. 30, 1996, as amended by Order 669-A, 71 FR 28443, May 16, 2006; Order 914, 90 FR 48402, Oct. 21, 2025]