The Code of Federal Regulations (CFR) is the official legal print publication containing the codification of the general and permanent rules published in the Federal Register by the departments and agencies of the Federal Government. The Electronic Code of Federal Regulations (eCFR) is a continuously updated online version of the CFR. It is not an official legal edition of the CFR.

Learn more about the eCFR, its status, and the editorial process.

Title 10EnergyPart / Section
Chapter INuclear Regulatory Commission1 – 199
Part 50Domestic Licensing of Production and Utilization Facilities50.1 – 50.160
General Provisions50.1 – 50.9
§ 50.1Basis, purpose, and procedures applicable.
§ 50.2Definitions.
§ 50.3Interpretations.
§ 50.4Written communications.
§ 50.5Deliberate misconduct.
§ 50.7Employee protection.
§ 50.8Information collection requirements: OMB approval.
§ 50.9Completeness and accuracy of information.
Requirement of License, Exceptions50.10 – 50.13
§ 50.10License required; limited work authorization.
§ 50.11Exceptions and exemptions from licensing requirements.
§ 50.12Specific exemptions.
§ 50.13Attacks and destructive acts by enemies of the United States; and defense activities.
Classification and Description of Licenses50.20 – 50.23
§ 50.20Two classes of licenses.
§ 50.21Class 104 licenses; for medical therapy and research and development facilities.
§ 50.22Class 103 licenses; for commercial and industrial facilities.
§ 50.23Construction permits.
Applications for Licenses, Certifications, and Regulatory Approvals; Form; Contents; Ineligibility of Certain Applicants50.30 – 50.39
§ 50.30Filing of application; oath or affirmation.
§ 50.31Combining applications.
§ 50.32Elimination of repetition.
§ 50.33Contents of applications; general information.
§ 50.34Contents of applications; technical information.
§ 50.34aDesign objectives for equipment to control releases of radioactive material in effluents—nuclear power reactors.
§ 50.35Issuance of construction permits.
§ 50.36Technical specifications.
§ 50.36aTechnical specifications on effluents from nuclear power reactors.
§ 50.36bEnvironmental conditions.
§ 50.37Agreement limiting access to Classified Information.
§ 50.38Ineligibility of certain applicants.
§ 50.39Public inspection of applications.
Standards for Licenses, Certifications, and Regulatory Approvals50.40 – 50.49
§ 50.40Common standards.
§ 50.41Additional standards for class 104 licenses.
§ 50.42Additional standard for class 103 licenses.
§ 50.43Additional standards and provisions affecting class 103 licenses and certifications for commercial power.
§ 50.44Combustible gas control for nuclear power reactors.
§ 50.45Standards for construction permits, operating licenses, and combined licenses.
§ 50.46Acceptance criteria for emergency core cooling systems for light-water nuclear power reactors.
§ 50.46aAcceptance criteria for reactor coolant system venting systems.
§ 50.47Emergency plans.
§ 50.48Fire protection.
§ 50.49Environmental qualification of electric equipment important to safety for nuclear power plants.
Issuance, Limitations, and Conditions of Licenses and Construction Permits50.50 – 50.69
§ 50.50Issuance of licenses and construction permits.
§ 50.51Continuation of license.
§ 50.52Combining licenses.
§ 50.53Jurisdictional limitations.
§ 50.54Conditions of licenses.
§ 50.55Conditions of construction permits, early site permits, combined licenses, and manufacturing licenses.
§ 50.55aCodes and standards.
§ 50.56Conversion of construction permit to license; or amendment of license.
§ 50.57Issuance of operating license.
§ 50.58Hearings and report of the Advisory Committee on Reactor Safeguards.
§ 50.59Changes, tests, and experiments.
§ 50.60Acceptance criteria for fracture prevention measures for lightwater nuclear power reactors for normal operation.
§ 50.61Fracture toughness requirements for protection against pressurized thermal shock events.
§ 50.61aAlternate fracture toughness requirements for protection against pressurized thermal shock events.
§ 50.62Requirements for reduction of risk from anticipated transients without scram (ATWS) events for light-water-cooled nuclear power plants.
§ 50.63Loss of all alternating current power.
§ 50.64Limitations on the use of highly enriched uranium (HEU) in domestic non-power reactors.
§ 50.65Requirements for monitoring the effectiveness of maintenance at nuclear power plants.
§ 50.66Requirements for thermal annealing of the reactor pressure vessel.
§ 50.67Accident source term.
§ 50.68Criticality accident requirements.
§ 50.69Risk-informed categorization and treatment of structures, systems and components for nuclear power reactors.
Inspections, Records, Reports, Notifications50.70 – 50.76
§ 50.70Inspections.
§ 50.71Maintenance of records, making of reports.
§ 50.72Immediate notification requirements for operating nuclear power reactors.
§ 50.73Licensee event report system.
§ 50.74Notification of change in operator or senior operator status.
§ 50.75Reporting and recordkeeping for decommissioning planning.
§ 50.76Licensee's change of status; financial qualifications.
US/IAEA Safeguards Agreement50.78
§ 50.78Facility information and verification.
Transfers of Licenses—Creditors' Rights—Surrender of Licenses50.80 – 50.83
§ 50.80Transfer of licenses.
§ 50.81Creditor regulations.
§ 50.82Termination of license.
§ 50.83Release of part of a power reactor facility or site for unrestricted use.
Amendment of License or Construction Permit at Request of Holder50.90 – 50.92
§ 50.90Application for amendment of license, construction permit, or early site permit.
§ 50.91Notice for public comment; State consultation.
§ 50.92Issuance of amendment.
Revocation, Suspension, Modification, Amendment of Licenses and Construction Permits, Emergency Operations by the Commission50.100 – 50.103
§ 50.100Revocation, suspension, modification of licenses, permits, and approvals for cause.
§ 50.101Retaking possession of special nuclear material.
§ 50.102Commission order for operation after revocation.
§ 50.103Suspension and operation in war or national emergency.
Backfitting50.109
§ 50.109Backfitting.
Enforcement50.110 – 50.111
§ 50.110Violations.
§ 50.111Criminal penalties.
Additional Standards for Licenses, Certifications, and Regulatory Approvals50.120 – 50.155
§ 50.120Training and qualification of nuclear power plant personnel.
§ 50.135Renewal of non-power production or utilization facility licenses issued under § 50.22 and testing facility licenses.
§ 50.150Aircraft impact assessment.
§ 50.155Mitigation of beyond-design-basis events.
Small Modular Reactors, Non-Light-Water Reactors, and Non-Power Production or Utilization Facilities50.160
§ 50.160Emergency preparedness for small modular reactors, non-light-water reactors, and non-power production or utilization facilities.
Appendix A to Part 50
General Design Criteria for Nuclear Power Plants
Appendix B to Part 50
Quality Assurance Criteria for Nuclear Power Plants and Fuel Reprocessing Plants
Appendix C to Part 50
A Guide for the Financial Data and Related Information Required To Establish Financial Qualifications for Construction Permits and Combined Licenses
Appendix D to Part 50 [Reserved]
Appendix E to Part 50
Emergency Planning and Preparedness for Production and Utilization Facilities
Appendix F to Part 50
Policy Relating to the Siting of Fuel Reprocessing Plants and Related Waste Management Facilities
Appendix G to Part 50
Fracture Toughness Requirements
Appendix H to Part 50
Reactor Vessel Material Surveillance Program Requirements
Appendix I to Part 50
Numerical Guides for Design Objectives and Limiting Conditions for Operation To Meet the Criterion “As Low as is Reasonably Achievable” for Radioactive Material in Light-Water-Cooled Nuclear Power Reactor Effluents
Appendix J to Part 50
Primary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
Appendix K to Part 50
ECCS Evaluation Models
Appendixes L-M to Part 50 [Reserved]
Appendix N to Part 50
Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites
Appendixes O-P to Part 50 [Reserved]
Appendix Q to Part 50
Pre-Application Early Review of Site Suitability Issues
Appendix R to Part 50
Fire Protection Program for Nuclear Power Facilities Operating Prior to January 1, 1979
Appendix S to Part 50
Earthquake Engineering Criteria for Nuclear Power Plants