e-CFR data is current as of March 4, 2021
TITLE 46—Shipping
CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBCHAPTER Q—EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL PART 162—ENGINEERING EQUIPMENT
Subpart 162.017—GENERAL PROVISIONS; VALVES, PRESSURE-VACUUM RELIEF, FOR TANK VESSELS
|
Preemptive effect; incorporation by reference. |
|
|
Materials, construction, and workmanship. |
|
Subpart 162.018—SAFETY RELIEF VALVES, LIQUEFIED COMPRESSED GAS
|
Applicable specifications, and referenced material. |
|
|
Construction and workmanship. |
|
|
Blow-down adjustment and popping tolerance. |
|
Subpart 162.027—COMBINATION FIREHOSE NOZZLES
|
Incorporation by reference. |
|
|
Design, construction, testing, and marking requirements. |
|
Subpart 162.028—EXTINGUISHERS, FIRE, PORTABLE, MARINE TYPE
|
Incorporation by reference. |
|
|
Examinations, tests, and inspections. |
|
|
Procedure for listing and labeling. |
|
|
Termination of listing or labeling. |
|
Subpart 162.039—EXTINGUISHERS, FIRE, SEMI-PORTABLE, MARINE TYPE
|
Incorporation by reference. |
|
|
Examinations, tests, and inspections. |
|
|
Procedure for listing and labeling. |
|
|
Termination of listing or labeling. |
|
Subpart 162.050—POLLUTION PREVENTION EQUIPMENT
|
Incorporation by reference: Where can I get a copy of the publications mentioned in this part? |
|
|
Factory production and inspection. |
|
|
Designation of facilities. |
|
|
Oil content meter and bilge alarm test rig. |
|
|
Separator and bilge alarm test fluids. |
|
|
Separator: Design specification. |
|
|
Separator: Approval tests. |
|
|
Cargo monitor: Design specification. |
|
|
Oil content meter: Approval tests. |
|
|
Bilge alarm: Design specification. |
|
|
Bilge alarm: Approval tests. |
|
|
Measurement of oil content. |
|
Subpart 162.060—BALLAST WATER MANAGEMENT SYSTEMS
|
Incorporation by reference. |
|
|
Use and acceptance of existing test data. |
|
|
Information requirements for the ballast water management system (BWMS) application. |
|
|
Changes to an approved ballast water management system (BWMS). |
|
|
Suspension, withdrawal, or termination of approval. |
|
|
Design and construction requirements. |
|
|
Land-based testing requirements. |
|
|
Shipboard testing requirements. |
|
|
Testing requirements for ballast water management system (BWMS) components. |
|
|
Testing and evaluation requirements for active substances, preparations, and relevant chemicals. |
|
|
Test Report requirements. |
|
|
Quality Assurance Project Plan (QAPP) requirements. |
|
|
Operation, Maintenance, and Safety Manual (OMSM). |
|
|
Requirements for Independent Laboratories (ILs). |
|
|
Responsibilities for Independent Laboratories (ILs). |
|
Subpart 162.161—FIXED CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
|
Incorporation by reference. |
|
|
Instruction manual for design, installation, operation, and maintenance. |
|
|
Inspections at production. |
|
Subpart 162.163—PORTABLE FOAM APPLICATORS
|
Incorporation by reference. |
|
|
Performance, design, construction, testing, and marking requirements. |
|
|