e-CFR data is current as of January 14, 2021
TITLE 40—Protection of Environment
CHAPTER I—ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUBCHAPTER I—SOLID WASTES (CONTINUED) PART 270—EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM
Subpart A—GENERAL INFORMATION
|
Purpose and scope of the regulations in this part. |
|
|
Considerations under Federal law. |
|
|
Noncompliance and program reporting by the Director. |
|
Subpart B—PERMIT APPLICATION
|
General application requirements. |
|
|
Signatories to permit applications and reports. |
|
|
Confidentiality of information. |
|
|
Contents of part A of the permit application. |
|
|
Contents of part B: General requirements. |
|
|
Specific part B information requirements for containers. |
|
|
Specific part B information requirements for tank systems. |
|
|
Specific part B information requirements for surface impoundments. |
|
|
Specific part B information requirements for waste piles. |
|
|
Specific part B information requirements for incinerators. |
|
|
Specific part B information requirements for land treatment facilities. |
|
|
Specific part B information requirements for landfills. |
|
|
Specific part B information requirements for boilers and industrial furnaces burning hazardous waste. |
|
|
Specific part B information requirements for miscellaneous units. |
|
|
Specific part B information requirements for process vents. |
|
|
Specific part B information requirements for equipment. |
|
|
Special part B information requirements for drip pads. |
|
|
Specific Part B information requirements for air emission controls for tanks, surface impoundments, and containers. |
|
|
Part B information requirements for post-closure permits. |
|
Subpart C—PERMIT CONDITIONS
|
Conditions applicable to all permits. |
|
|
Requirements for recording and reporting of monitoring results. |
|
|
Establishing permit conditions. |
|
Subpart D—CHANGES TO PERMIT
|
Modification or revocation and reissuance of permits. |
|
|
Permit modification at the request of the permittee. |
|
Subpart E—EXPIRATION AND CONTINUATION OF PERMITS
|
Continuation of expiring permits. |
|
Subpart F—SPECIAL FORMS OF PERMITS
|
Hazardous waste incinerator permits. |
|
|
Permits for land treatment demonstrations using field test or laboratory analyses. |
|
|
Interim permits for UIC wells. |
|
|
Research, development, and demonstration permits. |
|
|
Permits for boilers and industrial furnaces burning hazardous waste. |
|
|
RCRA standardized permits for storage and treatment units. |
|
|
Remedial Action Plans (RAPs). |
|
Subpart G—INTERIM STATUS
|
Qualifying for interim status. |
|
|
Operation during interim status. |
|
|
Changes during interim status. |
|
|
Termination of interim status. |
|
Subpart H—REMEDIAL ACTION PLANS (RAPS)
|
Why is this subpart written in a special format? |
|
General Information
|
Does my RAP grant me any rights or relieve me of any obligations? |
|
Applying for a RAP
|
How do I apply for a RAP? |
|
|
Who must sign the application and any required reports for a RAP? |
|
|
What must I include in my application for a RAP? |
|
|
What if I want to keep this information confidential? |
|
|
To whom must I submit my RAP application? |
|
|
If I submit my RAP application as part of another document, what must I do? |
|
Getting a RAP Approved
|
What is the process for approving or denying my application for a RAP? |
|
|
What must the Director include in a draft RAP? |
|
|
What else must the Director prepare in addition to the draft RAP or notice of intent to deny? |
|
|
What are the procedures for public comment on the draft RAP or notice of intent to deny? |
|
|
How will the Director make a final decision on my RAP application? |
|
|
May the decision to approve or deny my RAP application be administratively appealed? |
|
|
When does my RAP become effective? |
|
|
When may I begin physical construction of new units permitted under the RAP? |
|
How May My RAP Be Modified, Revoked and Reissued, or Terminated?
|
After my RAP is issued, how may it be modified, revoked and reissued, or terminated? |
|
|
For what reasons may the Director choose to modify my final RAP? |
|
|
For what reasons may the Director choose to revoke and reissue my final RAP? |
|
|
For what reasons may the Director choose to terminate my final RAP, or deny my renewal application? |
|
|
May the decision to approve or deny a modification, revocation and reissuance, or termination of my RAP be administratively appealed? |
|
|
How may I renew my RAP if it is expiring? |
|
|
What happens if I have applied correctly for a RAP renewal but have not received approval by the time my old RAP expires? |
|
Operating Under Your RAP
|
What records must I maintain concerning my RAP? |
|
|
How are time periods in the requirements in this subpart and my RAP computed? |
|
|
How may I transfer my RAP to a new owner or operator? |
|
|
What must the State or EPA Region report about noncompliance with RAPs? |
|
Obtaining a RAP for an Off-Site Location
|
May I perform remediation waste management activities under a RAP at a location removed from the area where the remediation wastes originated? |
|
Subpart I—INTEGRATION WITH MAXIMUM ACHIEVABLE CONTROL TECHNOLOGY (MACT) STANDARDS
|
Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid fuel boilers and hydrochloric acid production furnaces to minimize emissions from startup, shutdown, and malfunction events. |
|
Subpart J—RCRA STANDARDIZED PERMITS FOR STORAGE AND TREATMENT UNITS
General Information About Standardized Permits
|
What is a RCRA standardized permit? |
|
|
Who is eligible for a standardized permit? |
|
|
What requirements of part 270 apply to a standardized permit? |
|
Applying for a Standardized Permit
|
How do I apply for a standardized permit? |
|
|
What information must I submit to the permitting agency to support my standardized permit application? |
|
|
What are the certification requirements? |
|
Information That Must Be Kept at Your Facility
|
What general types of information must I keep at my facility? |
|
|
What container information must I keep at my facility? |
|
|
What tank information must I keep at my facility? |
|
|
What equipment information must I keep at my facility? |
|
|
What air emissions control information must I keep at my facility? |
|
Modifying a Standardized Permit
|
How do I modify my RCRA standardized permit? |
|
|