Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of September 25, 2020

Title 7Subtitle BChapter VISubchapter FPart 654 → Subpart D


Title 7: Agriculture
PART 654—OPERATION AND MAINTENANCE


Subpart D—Emergency Watershed Protection


Contents
§654.40   Responsibility for operation and maintenance.
§654.41   Performance of operation and maintenance.

return arrow Back to Top

§654.40   Responsibility for operation and maintenance.

(a) Non-Federal lands. The need for an O&M agreement will be determined by the State Conservationist. Where an O&M agreement is necessary, the sponsor(s) will provide the O&M and adopt standards for Federal grant property (34 CFR part 256). Where no O&M agreement is necessary, other arrangements will be made for complying with Federal property management.

(b) Federal lands. The Federal agency administering the Federal land is responsible for operating and maintaining emergency measures installed on Federal land.

return arrow Back to Top

§654.41   Performance of operation and maintenance.

(a) Arrangement. O&M is a prerequisite for approval of Federal emergency assistance when:

(1) The emergency measure needs to be operated and maintained in order to serve its intended purpose, or

(2) The emergency measure needs to be operated and maintained to insure that it will not become hazardous.

(b) Time of operation and maintenance. The sponsor(s)' obligations for O&M begin when the measure is installed and extend for the duration of the time required for the emergency measure to serve the purpose for which it is installed.

(c) Performance. Operation and maintenance is to be performed in a manner that will protect the environment and otherwise comply with NRCS, State, and local requirements. The method of performing O&M is at the option of the sponsor(s).

return arrow Back to Top

Need assistance?