Title 7Subtitle BChapter XLIIPart 4279Subpart C → Subject Group


Title 7: Agriculture
PART 4279—GUARANTEED LOANMAKING
Subpart C—Biorefinery, Renewable Chemical, and Biobased Product Manufacturing Assistance Loans


Applications

§4279.260   Guarantee applications—general.

(a) Application submittal. (1) For each guarantee request, the Lender or the Borrower must submit to the Agency a non-binding letter of intent to apply for loan guarantee not less than 30 calendar days prior to the application deadline as provided in paragraph (b) of this section. The letter must identify the Borrower, the Lender and Project sponsors; describe the Project and Project location; describe the proposed feedstock, primary technologies of the facility and primary products produced; estimate the Total Project Cost and amount of loan requested; and any additional information specified in the annual Federal Register notice, if any. Applications that do not submit a letter of intent may be accepted by the Agency at the Agency's discretion.

(2) For each guarantee request, the Lender must submit to the Agency an application that is in conformance with §4279.261. The methods of application submittal will be specified in the annual Federal Register notice.

(b) Application deadline. Unless otherwise specified by the Agency in a notice published in the Federal Register, application deadlines are October 1 and April 1 of each year. Complete applications must be received by the Agency on or before April 1 of each year to be considered for funding for that fiscal year. If the application deadline falls on a weekend or an observed holiday, the deadline will be the next Federal business day. The deadlines in this paragraph (b) relate to Phase 1 applications in accordance with §4279.261.

(c) Incomplete applications. Incomplete applications will be rejected. Lenders will be informed of the elements that made the application incomplete. If a resubmitted application is received by the applicable application deadline, the Agency will reconsider the application.

(d) Application withdrawal. During the period between the submission of an application and closing, the Lender must notify the Agency, in writing, if the Project is no longer viable or the Borrower is no longer requesting financial assistance for the Project. When the Lender so notifies the Agency, the Agency will rescind the selection or withdraw the application.

(e) Application revisions and updates. During the period between the submission of an application and closing, the Lender must notify the Agency, in writing, of revisions to the Project including but not limited to revisions to technology utilized in the Project, feedstock, Off-Take Agreements, ownership structure, and Project financing. The Agency may require submittal of updated application and supporting materials. The Agency will complete the application priority scoring in accordance with §4279.266 based on the application materials received by the Agency prior to the application deadline. Subsequent changes to an application that result in a lower priority score could result in the Agency discontinuing processing of the application.

§4279.261   Application for loan guarantee content.

Lenders must submit a complete application for each loan guarantee sought under this subpart. Components of an application are submitted in two phases. Phase I applications, which are the initial application submissions, must contain the information specified in paragraphs (a) through (j) of this section, organized pursuant to a table of contents in a chapter format. Phase 2 application components may be submitted after the Agency invites the Lender and Borrower to make the phase 2 submittal and must contain the information specified in paragraph (k) of this section.

(a) Project Summary. Provide a concise summary of the proposed Project and application information, Project purpose and need, and Project goals, including the following:

(1) Title. Provide a descriptive title of the Project.

(2) Borrower eligibility. Describe how the Borrower meets the eligibility criteria identified in §4279.209.

(3) Project eligibility. Describe how the Project meets the eligibility criteria identified in §4279.210. Clearly state whether the application is for the construction and development of a Biorefinery or for the Retrofitting of an existing facility. Additional Project description information will be needed later in the application process.

(4) Project funds. Submit a Spreadsheet identifying sources, amounts, and availability of funds. The Spreadsheet must also include a directory of funds source contact information. Attach any applications, correspondence, or other written communication between Borrower and fund source.

(5) Project timeline. A projected timeline detailing the timeline commencing with the loan application phase 1, including the loan application phase 2, final Project planning and engineering, obtaining required permits, loan closing, plant construction, commissioning and ramp up through stabilized state of operation.

(b) Application form. Form RD 4279-1 or other Agency-approved application form if specified in a Federal Register notice.

(c) Financial statements. (1) The most recent audited financial statements of the Borrower, unless alternative financial statements are authorized by the Agency; and

(2) A current (not more than 90 days old) balance sheet and a pro forma balance sheet at startup.

(d) Financial model. Submit a financial model for the Project in the form of a financial modeling software program in an active electronic format which includes, but is not limited to, a projected Project budget and projected balance sheets, income and expense statements, cash flow statements, and Working Capital and capital expense projections for not less than the term of the loan. The projections must be displayed in a monthly format for a period of three years after stabilized operation and annually thereafter. Projections should be supported by a list of assumptions showing the basis for the projections. Depending on the complexity of the Project and the financial condition of the Borrower, the Agency may require additional financial statements and additional related information.

(e) Feasibility Study. The Feasibility Study should be prepared by a qualified, independent third party using information gathered from other qualified parties and documents such as: independent engineer reports, marketing studies, feedstock studies, business plans and financial statements prepared by a certified public accountant. Any information used to prepare the Feasibility Study should be submitted as attachments. Elements in an acceptable Feasibility Study include, but are not limited to, the elements outlined in Table 1 of this section.

Table 1—Feasibility Study Components

   
(A) Executive summary
Introduction/Project Overview (Brief general overview of Project location, size, etc.).
Economic feasibility determination.
Market feasibility determination.
Technical feasibility determination.
Financial feasibility determination.
Management feasibility determination.
Recommendations for implementation.
(B) Economic Feasibility
Description of feedstock and confirmation that the feedstock is not used elsewhere in the production of Advanced Biofuels or Biobased Products including Renewable Chemicals.
Feedstock:
Feedstock source management,
Estimates of feedstock volumes and costs,
Collection, pre-treatment, transportation, and storage, and
Feedstock risks.
Documentation that woody biomass feedstock from National Forest system lands or public lands cannot be used for a higher-value product.
Impacts on any other similar Biorefineries in the area in which the Borrower proposes to place the Project, defined as the area that will supply the feedstock to the proposed Project, if any.
Impacts on existing manufacturing plants or other facilities that use similar feedstock if the Borrower's proposed production technology is adopted.
Projected impact on resource conservation, public health, and the environment.
Information regarding Project site.
Availability of trained or trainable labor.
Availability of infrastructure, including utilities, and rail, air and road service to the site.
Overall economic impact of the Project, including direct jobs, indirect jobs, additional markets created for agricultural and forestry products and agricultural waste material and the potential for Rural economic development.
Feasibility/plans of Project to work with producer associations or cooperatives and the estimated amount of annual feedstock purchased from or sold to producer associations and cooperatives.
(C) Market Feasibility
Information on the sales organization and management.
Nature and extent of market and market area.
Marketing plans for sale of projected output—principal products and Byproducts.
Extent of competition, including other similar facilities in the market area.
Commitments from purchasers of off-take—principal products and secondary products, degree of commitment, duration or terms of Off-Take Agreements, and financial strength of counterparties.
Risks related to the industry, including:
Industry status;
Specific market risks; and
Competitive threats and advantages.
(D) Technical Feasibility
Suitability of the selected site for the intended use.
Scale of development for which the process technology has been proven (i.e., pilot, demonstration, or Semi-Work Scale Facility). Provide results from pilot, demonstration, or Semi-Work Scale Facilities that prove that the technology proposed to be used is feasible and stands a good chance of being successful. The proposed technology must meet the definition of Eligible technology.
The degree of integration of all processes should be detailed and a summary of any integrated demonstration unit test results should be submitted.
Specific volume produced from the technology of the process (expressed either as volume of feedstock processed [tons per unit of time] or as product [gallons per unit of time]).
Identification and estimation of Project operation and development costs. Specify the level of accuracy of these estimates and the assumptions on which these estimates have been based. Detailed analysis of Project costs including: Project management and professional services; resource assessment; Project design and permitting; land agreements and site preparation; equipment requirements and system installation; startup and shakedown; and warranties, insurance, financing and operation and maintenance costs.
A projected timeline detailing Borrower plans from the time of loan application through plant construction, commissioning and ramp up should be included.
Ability of the proposed system to be commercially replicated.
Risks related to:
Construction of the Biorefinery;
Production of the Advanced Biofuel and Biobased Product including Renewable Chemical;
Regulation and governmental action;
Design-related factors that may affect Project success; and
Technology scale up risk.
(E) Financial Feasibility
Reliability of the financial projections and the assumptions on which the financial statements are based, including all sources and uses of Project capital, private or public Federal and non-Federal funds. Provide detailed analysis and description of projected balance sheets, income and expense statements, and cash flow statements over the useful life of the Project.
A detailed description of and the degree financial feasibility is dependent on:
Investment incentives;
Productivity incentives;
Loans and grants; and
Other Project authorities RINs value, tax credits, other credits, and subsidies that affect the Project.
Any constraints or limitations in the financial projections.
Ability of the business to achieve the projected income and cash flow.
Assessment of the cost accounting system.
Availability of short-term credit or other means to meet seasonal business costs.
Adequacy of raw materials and supplies.
Sensitivity analysis, including feedstock and energy costs and product and Byproduct prices.
Risks related to:
The Project;
Borrower financing plan;
The operational units; and
Tax issues.
(F) Management Feasibility
Borrower and/or management's previous experience concerning:
Production of Advanced Biofuel, and Biobased Product including Renewable Chemicals, as applicable;
Acquisition of feedstock;
Marketing and sale of off-take; and
The receipt of Federal financial assistance, including amount of funding, date received, purpose, and outcome.
Management plan for procurement of feedstock and labor, marketing of the off-take, and management succession.
Risks related to:
Borrower as a company (e.g., development-stage);
Conflicts of Interest; and
Management strengths and weaknesses.
(G) Qualifications
A resume or statement of qualifications of the author and contributors of the Feasibility Study, including prior experience, must be submitted.

(f) Business Plan. The Lender must submit the Borrower's business plan that includes the information specified in paragraphs (f)(1) through (10) of this section. Any or all of this information may be omitted if it is included in the Feasibility Study specified in paragraph (e) of this section.

(1) Describe or provide an organizational chart of the Borrower's ownership structure and affiliation with other entities, if any. The names and a description of the relationship of the Borrower's parent, Affiliates, and subsidiaries. Identify local ownership.

(2) The Borrower's succession planning, addressing both ownership and management.

(3) The Borrower's experience and management experience.

(4) The products and services to be provided and the Borrower's business strategy.

(5) Possible vendors and models of major system components.

(6) The availability of the resources (e.g., labor, raw materials, supplies) necessary to provide the planned products and services.

(7) Site location and its relation to product distribution (e.g., rail lines or highways) and any land use or other permits necessary to operate the facility.

(8) The market for the product and its competition, including any and all competitive threats and advantages.

(9) Projected balance sheets, income and expense statements, and cash flow statements for a period of not less than three years of stabilized operation.

(10) A description of the proposed use of funds.

(g) Scoring information. The application must contain information in a format that is responsive to the scoring criteria specified in §4279.266.

(h) Intergovernmental consultation. Intergovernmental consultation comments in accordance with 2 CFR part 415, subpart C or successor regulation.

(i) DUNS Number. For Borrowers other than individuals, a Dun and Bradstreet Universal Numbering System (DUNS) number, which can be obtained online at http://fedgov.dnb.com/webform.

(j) Other information. Any other information determined by the Agency to be necessary to evaluate the application.

(k) Phase 2 application contents. (1) Updates, as appropriate, to contents of application materials submitted in application phase 1.

(2) An appraisal conducted as specified under §4279.244.

(3) A proposed Loan Agreement or a sample Loan Agreement with an attached list of the proposed Loan Agreement provisions as specified in paragraphs (k)(3)(i) through (ix) of this section.

(i) Prohibition against assuming liabilities or obligations of others.

(ii) Restriction on dividend payments.

(iii) Limitation on the purchase or sale of equipment and fixed assets.

(iv) Limitation on compensation of officers and owners.

(v) Minimum Working Capital or current ratio requirement.

(vi) Maximum debt-to-net worth ratio.

(vii) Restrictions concerning consolidations, mergers, or other circumstances.

(viii) Limitations on selling the business without the concurrence of the Lender.

(ix) Repayment and amortization of the loan.

(4) Environmental documentation in accordance with 7 CFR part 1970.

(5) Under the direction of the Agency, an evaluation and rating of the total Project's indebtedness, without consideration for a government guarantee, from a nationally-recognized statistical rating organization (NRSRO), as defined by the U.S. Security and Exchange Commission, for all Projects with total Eligible Project Costs of $25 million or more unless as otherwise specified by the Agency in a notice published in the Federal Register. The evaluation and rating must be in the form of an indicative private rating, private credit analysis, or comparable analysis report and include a rating in accordance with the NRSRO's credit rating scales and include a recovery analysis. An updated rating may be required at the Agency's discretion if changes are subsequently made to the Project including changes to any contracts and agreements or changes to loan terms and conditions.

(6) Lender's analysis and credit evaluation that conforms to §4279.215 and must include the information specified in paragraphs (k)(6)(i) and (ii) of this section.

(i) The credit reports of the Borrower, its principals, and any parent, Affiliate, or subsidiary as follows:

(A) Unless otherwise determined by the Agency, a personal credit report from an Agency-approved credit reporting company for individuals who are key employees of the Borrower, as determined by the Agency, and for individuals owning 20 percent or more interest in the Borrower or any owner with more than 10 percent ownership interest in the Borrower if there is no owner with more than 20 percent ownership interest in the Borrower, except for when the Borrower is a corporation listed on a major stock exchange; and

(B) Commercial credit reports on the Borrower and any parent, Affiliate, and subsidiary firms.

(ii) Financial and sensitivity review using a financial modeling software program or a banking industry software analysis program with industry standards, when appropriate.

(7) Whether the Loan Note Guarantee is requested prior to construction or after completion of construction of the Project.

(8) The technical assessment must be completed by a qualified independent engineer and must demonstrate that the design, procurement, installation, startup, operation and maintenance of the Project will permit it to operate or perform as specified over its useful life in a reliable and a cost effective manner, and must identify what the useful life of the Project is. The technical assessment must also identify all necessary Project agreements, demonstrate that those agreements will be in place at or before the time of loan closing, and demonstrate that necessary Project equipment and services will be available over the useful life of the Project. The technical assessment must be based upon verifiable data and contain sufficient information and analysis so that a determination can be made on the technical feasibility of achieving the levels of income or production that are projected in the financial statements. All technical information provided must follow the format specified in paragraphs (k)(8)(i) through (ix) of this section. Supporting information may be submitted in other formats. Design drawings and process flow charts are required as exhibits. A discussion of a topic identified in paragraphs (k)(8)(i) through (ix) of this section is not necessary if the topic is not applicable to the specific Project. Questions identified in the Agency's technical review of the Project must be answered to the Agency's satisfaction before the application will be approved. All Projects require the services of an independent, third-party professional engineer.

(i) Qualifications of Project team. The Project team will vary according to the complexity and scale of the Project. The Project team must have demonstrated expertise in similar Advanced Biofuel and Biobased Product including Renewable Chemical, as applicable, technology development, engineering, installation, and maintenance. Identify Borrower's, including its principals', prior experience in bioenergy projects and the receipt of Federal financial assistance, including the amount of funding, date received, purpose, and outcome, for such projects. Authoritative evidence that Project team service providers have the necessary professional credentials or relevant experience to perform the required services for the development, construction, and Retrofitting, as applicable, of technology for producing Advanced Biofuels and Biobased Products including Renewable Chemicals, if applicable, must be provided. In addition, authoritative evidence that vendors of proprietary components can provide necessary equipment and spare parts for the facility to operate over its useful life must be provided. The application must:

(A) Discuss the proposed Project delivery method. Such methods include a design-bid-build method, where a separate engineering firm may design the Project and prepare a request for bids and the successful bidder constructs the Project at the Borrower's risk, and a design -build method, often referred to as “turnkey,” where the Borrower establishes the specifications for the Project and secures the services of a developer who will design and build the Project at the developer's risk;

(B) Discuss the manufacturers of major components of Advanced Biofuels and Biobased Product including Renewable Chemical technology equipment being considered in terms of the length of time in business and the number of units installed at the capacity and scale being considered;

(C) Discuss the Project team members' qualifications for engineering, designing, and installing similar projects, including any relevant certifications by recognized organizations or bodies. Provide a list of the same or similar projects designed, installed, or supplied and currently operating, with references if available; and

(D) Describe the facility operator's qualifications and experience for servicing, operating, and maintaining such equipment or projects. Provide a list of the same or similar projects designed, installed, or supplied and currently operating, with references if available.

(ii) Agreements and permits. The application must identify all necessary agreements and permits required for the Project and the status and schedule for securing those agreements and permits, including the items specified in paragraphs (k)(8)(ii)(A) through (F) of this section.

(A) All facilities funded under this subpart must be installed in accordance with applicable local, State, and national codes and applicable local, State, and Federal regulations. Identify zoning and code requirements and necessary permits and the schedule for meeting those requirements and securing those permits.

(B) Identify licenses where required and the schedule for obtaining those licenses.

(C) Identify land use agreements required for the Project, the schedule for securing those agreements, and the term of those agreements.

(D) Identify any permits or agreements required for solid, liquid, and gaseous emissions or effluents and the schedule for securing those permits and agreements.

(E) Identify available component warranties for the specific Project location and size.

(F) Identify all environmental issues, including environmental compliance issues, associated with the Project.

(iii) Resource assessment. The application must provide adequate and appropriate evidence of the availability of the feedstocks required for the facility to operate as designed. Indicate the type and quantity of the feedstock, and discuss storage of the feedstock, where applicable, and competing uses for the feedstock. Indicate shipping or receiving methods and required infrastructure for shipping, and other appropriate transportation mechanisms including methods and systems to prevent the spread of invasive species. For proposed Projects with an established resource, provide a summary of the resource.

(iv) Design and engineering. The application must provide authoritative evidence that the facility will be designed and engineered so as to meet its intended purposes, will ensure public safety, and will comply with applicable laws, regulations, agreements, permits, codes, and standards. Projects shall be engineered by a qualified entity. Each facility must be engineered as a complete, integrated facility. The engineering must be comprehensive, including site selection, systems and component selection, and systems monitoring equipment. All Projects funded under this subpart must be constructed by a qualified entity.

(A) The application must include a concise but complete description of the Project, including location of the Project; resource characteristics, including the kind and amount of feedstocks; facility specifications; kind, amount, and quality of the output; and monitoring equipment. Address performance on a monthly and annual basis. Describe the uses of or the market for the Advanced Biofuels and Biobased Product including Renewable Chemical produced by the facility. Discuss the impact of reduced or interrupted feedstock availability on the facility's operations.

(B) The application must include:

(1) A description of the Project site that addresses issues such as site access, foundations, and backup equipment when applicable;

(2) Environmental documentation in accordance with 7 CFR part 1970.

(3) Identification of any unique construction and installation issues.

(C) Sites must be controlled by the eligible Borrower for at least the financing term of the Loan Note Guarantee.

(v) Project development schedule. The application must describe each significant task, its beginning and end, and its relationship to the time needed to initiate and carry the Project through startup and shakedown. Provide a detailed description of the Project timeline including resource assessment, Project and site design, permits and agreements, equipment procurement, and Project construction from excavation through startup and shakedown.

(vi) Equipment procurement. The application must demonstrate that equipment required by the facility is available and can be procured and delivered within the proposed Project development schedule. Projects funded under this subpart may be constructed of components manufactured in more than one location. Provide a description of any unique equipment procurement issues such as scheduling and timing of component manufacture and delivery, ordering, warranties, shipping, receiving, and on-site storage or inventory.

(vii) Equipment installation. The application must provide a full description of the management of and plan for site development and systems installation, details regarding the scheduling of major installation equipment needed for Project construction, and a description of the startup and shakedown specification and process and the conditions required for startup and shakedown for each equipment item individually and for the facility as a whole.

(viii) Operations and maintenance. The application must provide the operations and maintenance requirements of the facility necessary for the facility to operate as designed over its useful life. The application must also include:

(A) Information regarding available facility and component warranties and availability of spare parts;

(B) A description of the routine operations and maintenance requirements of the proposed facility, including maintenance schedules for the mechanical, piping, and electrical systems and system monitoring and control requirements, as well as provision of information that supports expected useful life of the facility and timing of major component replacement or rebuilds;

(C) A discussion of the costs and labor associated with operating and maintaining the facility and plans for in-sourcing or outsourcing. A description of the opportunities for technology transfer for long-term Project operations and maintenance by a local entity or owner/operator; and

(D) Provision and discussion of the risk management plan for handling large, unanticipated failures of major components.

(ix) Decommissioning. A description of the decommissioning process, when the Project must be uninstalled or removed. A description of any issues, requirements, and costs for removal and disposal of the facility.

[81 FR 67633, Dec. 23, 1996, as amended at 81 FR 11051, Mar. 2, 2016]

§§4279.262-4279.264   [Reserved]

§4279.265   Guarantee application processing.

(a) Eligibility determination. Upon receipt of a complete Phase 1 application, the Agency will determine if the Borrower, Lender, and Project are eligible and if the Project is technically and economically feasible, as provided under paragraph (b) of this section.

(1) If the Borrower, Lender, or the Project is determined to be ineligible for any reason, the Agency will inform the Lender, in writing, of the reasons. No further evaluation of the application will occur.

(2) If the Agency determines it is unable to guarantee the loan, the Agency will inform the Lender in writing. Such notification will include the reasons for denial of the guarantee.

(b) Technical and economic feasibility. (1) The Agency's determination of a Project's technical and economic feasibility will be based on:

(i) The Agency's analysis of the technical report and Feasibility Study submitted in the application conducted by qualified independent third parties;

(ii) The Lenders credit evaluation; and

(iii) Other application materials.

(2) The Agency's determination of a Project's technical feasibility will be based on the technical report. In addition, prior to loan closing of a Project utilizing technology that does not have a history of successful utilization in a Commercial-Scale operation of a Biorefinery that produces an Advanced Biofuel, evidence demonstrating 120 days of continuous, steady state production from an integrated demonstration unit must be provided by the Borrower to the Lender and the Agency for review and determination of technical feasibility. Authoritative demonstration campaign results must be provided in 30-day intervals. The integrated demonstration unit must prove out the Project's ability to utilize Project-relevant biomass and produce Advanced Biofuel at a yield and quality consistent with the design basis of the Project. The Borrower must provide to the Agency, for review and approval, sufficient information on the integrated campaign design so as to ensure operation duration, quality, and quantity specifications are met and incorporated into the final design criteria for the commercial facility.

(3) Projects determined by the Agency to be without technical or economic feasibility will not be selected for funding.

§4279.266   Guarantee application scoring.

Using the evaluation criteria identified in this section, the Agency will score each eligible Biorefinery application that meets the minimum requirements for technical and economic feasibility. A maximum of 125 points is possible. The Agency will award points based on its review and analysis of all application materials. Clarifications for the scoring on Biobased Product Manufacturing applications will be made available by a notice published in the Federal Register.

(a) Whether the Borrower has established a market for the Advanced Biofuel and the Biobased Products including Renewable Chemicals, as applicable. A maximum of 20 points can be awarded. Points to be awarded will be determined as follows:

(1) Degree of commitment of Off-Take Agreements. A maximum of 6 points will be awarded.

(i) If the Borrower has signed Off-Take Agreements for purchase for greater than 50 percent of the dollar value of off-take, 6 points will be awarded.

(ii) If the Borrower has signed letters of intent to enter into Off-Take Agreements, or comparable documentation, for the purchase for greater than 50 percent of the dollar value of off-take, or combination of signed contracts or agreements and letters of intent or comparable documentation, 4 points will be awarded.

(iii) If the Borrower has signed letters of interest to enter into Off-Take Agreements, or comparable documentation, for the purchase for greater than 50 percent of the dollar value of off-take, or combination of signed Off-Take Agreements, letters of intent, letters of intent or comparable documentation, 2 points will be awarded.

(2) Duration of Off-Take Agreements. A maximum of 6 points will be awarded.

(i) If the Borrower commits to enter into Off-Take Agreements prior to loan closing for purchase for greater than or equal to 50 percent of the dollar value of off-take for the period not less than the loan term, 6 points will be awarded.

(ii) If the Borrower commits to enter into Off-Take Agreements prior to loan closing for purchase for greater than or equal to 50 percent of the dollar value of off-take for the period not less than five years but less than the term of the loan, 4 points will be awarded.

(iii) If the Borrower commits to enter into Off-Take Agreements prior to loan closing for purchase for greater than or equal to 50 percent of the dollar value of off-take for the period not less than one year but less than five years, 2 points will be awarded.

(3) Financial strength of the off-take counterparty. A maximum of 4 points will be awarded.

(i) If the Borrower commits to enter into Off-Take Agreements prior to loan closing for purchase for greater than or equal to 50 percent of the dollar value of off-take with an off-take counterparty with a corporate credit rating not less than AA, Aa2, or equivalent, 4 points will be awarded.

(ii) If the Borrower commits to enter into Off-Take Agreements prior to loan closing for purchase for greater than or equal to 50 percent of the dollar value of off-take with an off-take counterparty with a corporate credit rating less than AA, Aa2, or equivalent, but not less than A-, or A3, or equivalent, 2 points will be awarded.

(iii) If the Borrower commits to enter into Off-Take Agreements prior to loan closing for purchase for greater than or equal to 50 percent of the dollar value of off-take with an off-take counterparty with a corporate credit rating less than A-, or A3, or equivalent, but not less than BBB-, or Baa3, or equivalent, 1 point will be awarded.

(4) Revenue dependency on tax credits, carbon credits, or other Federal or State subsidies. A maximum of 4 points will be awarded.

(i) If total of revenues from tax credits, carbon credits, or other Federal or State subsidies is less than or equal to 10 percent of the Project's total revenues on an annual basis, in the Borrower's base case of financial projections, 4 points will be awarded.

(ii) If total of revenues from tax credits, carbon credits, or other Federal or State subsidies is greater than 10 percent but less than or equal to 20 percent of the Project's total revenues on an annual basis, in the Borrower's base case of financial projections, 2 points will be awarded.

(iii) If total of revenues from tax credits, carbon credits, or other Federal or State subsidies is greater than 20 percent but less than or equal to 30 percent of the Project's total revenues on an annual basis, in the Borrower's base case of financial projections, 1 point will be awarded.

(b) Whether the area in which the Borrower proposes to place the Project, defined as the area that will supply the feedstock to the proposed Project, has any other similar facilities. A maximum of 5 points can be awarded. Points to be awarded will be determined as follows:

(1) If the area that will supply the feedstock to the proposed Project does not have any other similar facilities, 5 points will be awarded.

(2) If there are other similar facilities located within the area that will supply the feedstock to the proposed Project, 0 points will be awarded.

(c) Whether the Borrower is proposing to use a feedstock or biobased output of Biorefineries not previously used in the production of Advanced Biofuels or Biobased Products including Renewable Chemicals. A maximum of 10 points can be awarded. Points to be awarded will be determined as follows:

(1) If the Borrower proposes to use a feedstock previously used in the production of Advanced Biofuels and Biobased Product including Renewable Chemicals in a commercial facility, 0 points will be awarded.

(2) If the Borrower proposes to use a feedstock not previously used in production of Advanced Biofuels and Biobased Product including Renewable Chemicals in a commercial facility, 10 points will be awarded.

(d) Whether the Borrower is proposing to work with producer associations or cooperatives. A maximum of 5 points can be awarded. Points to be awarded will be determined as follows:

(1) If at least 50 percent of the dollar value of feedstock to be used by the proposed Project will be supplied by producer associations and cooperatives, 5 points will be awarded.

(2) If at least 30 percent of the dollar value of feedstock to be used by the proposed Project will be supplied by producer associations and cooperatives, 3 points will be awarded.

(e) The level of financial participation by the Borrower, including support from non-Federal government sources and private sources. A maximum of 20 points can be awarded. Points to be awarded will be determined as follows:

(1) If the sum of the loan amount requested and other direct Federal funding is less than or equal to 50 percent of total Eligible Project Cost, 20 points will be awarded.

(2) If the sum of the loan amount requested and other direct Federal funding is greater than 50 percent but less than or equal to 55 percent of total Eligible Project Cost, 16 points will be awarded.

(3) If the sum of the loan amount requested and other direct Federal funding is greater than 55 percent but less than or equal to 60 percent of total Eligible Project Cost, 12 points will be awarded.

(4) If the sum of the loan amount and other direct Federal funding is greater than 60 percent but less than or equal to 65 percent of total Eligible Project Cost, 8 points will be awarded.

(5) If the sum of the loan amount and other direct Federal funding is greater than 65 percent but less than or equal to 70 percent of total Eligible Project Cost, 4 points will be awarded.

(f) Whether the Borrower has established that the adoption of the process proposed in the application will have a positive effect on three impact areas: resource conservation (e.g., water, soil, forest), public health (e.g., potable water, air quality), and the environment (e.g., compliance with an applicable renewable fuel standard, greenhouse gases, emissions, particulate matter). A maximum of 10 points can be awarded. Points to be awarded will be determined as follows:

(1) If process adoption will have a positive impact on any one of the three impact areas (resource conservation, public health, or the environment), 3 points will be awarded.

(2) If process adoption will have a positive impact on two of the three impact areas, 6 points will be awarded.

(3) If process adoption will have a positive impact on all three impact areas, 10 points will be awarded.

(4) If the Project proposes to use a feedstock that can be used for human or animal consumption, 5 points will be deducted from the score.

(g) Whether the Borrower can establish that, if adopted, the technology proposed in the application will not have any economically significant negative impacts on existing manufacturing plants or other facilities that use similar feedstocks or biobased outputs of Biorefineries. A maximum of 5 points can be awarded. Points to be awarded will be determined as follows:

(1) If the Borrower has failed to establish, through an independent third-party Feasibility Study, that the production technology proposed in the application, if adopted, will not have any economically significant negative impacts on existing manufacturing plants or other facilities that use similar feedstocks, 0 points will be awarded.

(2) If the Borrower has established, through an independent third-party Feasibility Study, that the production technology proposed in the application, if adopted, will not have any economically significant negative impacts on existing manufacturing plants or other facilities that use similar feedstocks, 5 points will be awarded.

(3) If the feedstock is wood pellets, no points will be awarded under this criterion.

(h) The potential for Rural economic development. A maximum of 20 points will be awarded. Points to be awarded will be determined as follows:

(1) If the Project is located in a Rural Area, 5 points will be awarded.

(2) If the Project creates jobs through direct employment with an average wage that exceeds the County median household wages where the Project will be located, 5 points will be awarded.

(3) If the majority of feedstock to be utilized by the Project, on an annual basis, is harvested from the land, 10 points will be awarded.

(i) The level of local ownership of the facility proposed in the application. A maximum of 5 points can be awarded. Points to be awarded will be determined as follows:

(1) If Local Owners have an ownership interest in the facility of more than 20 percent but less than or equal to 50 percent, 3 points will be awarded.

(2) If Local Owners have an ownership interest in the facility of more than 50 percent, 5 points will be awarded.

(j) Whether the Project can be replicated. A maximum of 10 points can be awarded. Points to be awarded will be determined as follows:

(1) If the Project can be commercially replicated regionally (e.g., Northeast, Southwest, etc.), 5 points will be awarded.

(2) If the Project can be commercially replicated nationally, 10 points will be awarded.

(k) If the Project uses a particular technology, system, or process that is not currently operating at Commercial Scale as of October 1 of the fiscal year for which the funding is available, 5 points will be awarded.

(l) The Administrator can award up to a maximum of 10 bonus points:

(1) To ensure, to the extent practical, there is diversity in the types of Projects approved for loan guarantees to ensure as wide a range as possible technologies, products, and approaches are assisted in the Program portfolio; and

(2) To applications that promote partnerships and other activities that assist in the development of new and emerging technologies for the development of Advanced Biofuels and Biobased Products including Renewable Chemicals, so as to, as applicable, increase the energy independence of the United States or reduce our dependence on petroleum-based chemicals and products; promote resource conservation, public health, and the environment; diversify markets for agricultural and forestry products and agriculture waste material; and create jobs and enhance the economic development of the Rural economy. These partnerships and other activities will be identified in a Federal Register notice each fiscal year.

§4279.267   Selecting guarantee applications.

(a) Allocation of budget authority. In administering this Program's budgetary authority each fiscal year, the Agency will allocate up to, but no more, than 50 percent of its budgetary authority, excluding funding for Biobased Product Manufacturing Projects, to fund applications received by the end of the first application window, including those carried over from the previous application period. Any funds not obligated to support applications submitted by the end of the first application window will be available to support applications received by the end of the second window, including those carried over from the previous application period. The Agency, therefore, will have a minimum of 50 percent of each fiscal year's budgetary authority for this Program available to support applications received by the end of the second application window. Administrative procedures for the funding of Biobased Product Manufacturing Projects will be made available by a Notice published in the Federal Register.

(b) Ranking of applications. The Agency will rank all complete eligible applications to create a priority list of scored Phase 1 applications for the Program. Unless otherwise specified in a notice published in the Federal Register, the Agency will rank applications by approximately October 31 for complete and eligible applications received on or before October 1 and by approximately April 30 for complete and eligible applications received on or before April 1. All Phase 1 applications received on or before October 1 and April 1 will be ranked by the Agency and will be competed against the other applications received on or before such date.

(c) Selection of applications for funding. The Agency will invite applicants to submit Phase 2 applications based on the criteria specified in paragraphs (c)(1) through (3) of this section. The Agency will notify, in writing, Lenders whose applications have been selected.

(1) Ranking. The Agency will consider the score an application has received compared to the scores of other applications in the priority list created under paragraph (b) of this section, with highest scoring applications receiving first consideration for invitation to the phase 2 submittal. A minimum score of 55 points is required in order to be considered for a guarantee.

(2) Availability of budgetary authority. The Agency will consider the size of the request relative to the budgetary authority that remains available to the Program during the fiscal year.

(i) If there is insufficient budgetary authority during a particular funding period to select a higher scoring application, the Agency may elect to select the next highest scoring application for further processing. Before this occurs, the Agency will provide the Borrower of the higher scoring application the opportunity to reduce the amount of its request to the amount of budgetary authority available. If the Borrower agrees to lower its request, it must certify that the purposes of the Project can be met, and the Agency must determine the Project is financially feasible at the lower amount.

(ii) If the amount of funding required is greater than 25 percent of the Program's outstanding budgetary authority, the Agency may elect to select the next highest scoring application for further processing, provided the higher scoring Borrower is notified of this action and given an opportunity to revise their application and resubmit it for an amount less than or equal to 25 percent of the Program's outstanding budgetary authority.

(3) Availability of other funding sources. If other financial assistance is needed for the Project, the Agency will consider the availability of other funding sources. If the Lender cannot demonstrate that funds from these sources are available at the time of selecting applications for funding or potential funding, the Agency may instead select the next highest scoring application for further processing ahead of the higher scoring application.

(d) Ranked applications not selected for phase 2. A ranked application that is not invited to submit phase 2 in the application cycle in which it was submitted will be carried forward one additional application cycle, which may be in the next fiscal year. The Agency will notify the Lender in writing.

§§4279.268-4279.277   [Reserved]

§4279.278   Loan approval and obligating funds.

(a) Applications for loan guarantees may be approved as their Phase 2 applications are completed and approved. If an application has been selected for phase 2, but has not been approved because additional information is needed, the Agency will notify, in writing, the Lender of what information is needed, including a timeframe for the Lender to provide the information. If the Lender does not provide the information within the specified timeframe, the Agency will remove the application from further consideration and will so notify the Lender in writing.

(b) Upon approval of a loan guarantee application, the Agency will issue a Conditional Commitment to the Lender containing conditions under which a Loan Note Guarantee will be issued. The Agency will not issue a Conditional Commitment until the Agency has satisfactorily completed a Civil Rights Impact Analysis. The Conditional Commitment becomes null and void unless the conditions are accepted by the Lender and Borrower within 60 days from the date of issuance by USDA. If the conditions are not met or the Loan Note Guarantee is not issued by the Conditional Commitment expiration date, the Agency may extend the Conditional Commitment expiration date when requested by the Lender and only if there has been no Material Adverse Change in the Borrower's or Borrowers' financial condition since issuance of the Conditional Commitment.

(c) The Lender and Borrower may request changes to the Conditional Commitment. The Agency may negotiate with the Lender and the Borrower regarding any proposed changes to the Conditional Commitment. Any changes to the Conditional Commitment must be documented by written amendment to the Conditional Commitment. The changes must be for Good Cause and the Agency may deny, solely at is discretion, changes to the Conditional Commitment even if the change is otherwise in compliance with this subpart.

(d) The Borrower must comply with all Federal requirements then in effect for receiving Federal assistance.

§4279.279   Transfer of Lenders.

(a) The Agency may approve the substitution of a new eligible Lender in place of a former Lender who has been issued an outstanding Conditional Commitment when the Loan Note Guarantee has not yet been issued provided that there are no changes in the:

(1) Borrower's ownership or control, loan purposes, or scope of Project;

(2) Loan terms and conditions in the Conditional Commitment; and

(3) Loan Agreement.

(b) The Agency must determine that the new Lender is eligible in accordance with §4279.208 prior to approving the substitution. The original Lender must provide the Agency with a letter stating the reasons it no longer desires to be a Lender for the Project. The substituted Lender must execute a new part B of Form 4279-1 and Lender's Agreement (unless a valid Lender's Agreement with the Agency already exists), and must complete a new Lender's analysis in accordance with §4279.215. The new Lender may also be required to provide other updated application items outlined in §4279.261(k).

§4279.280   Changes in Borrowers.

Any changes in Borrower ownership or organization prior to the issuance of the Loan Note Guarantee must meet the eligibility requirements of the Program and be approved by the Agency.

§4279.281   Conditions precedent to issuance of Loan Note Guarantee.

The Lender must not close the loan until all conditions of the Conditional Commitment are met or can be met. When loan closing plans are established, the Lender must notify the Agency in writing.

(a) Coincident with, or immediately after loan closing, the Lender must provide the following forms and documents to the Agency:

(1) An executed Lender's Agreement;

(2) Form RD 1980-19, “Guaranteed Loan Closing Report,” and appropriate guarantee fee;

(3) Copy of the executed Promissory Note(s);

(4) Copy of the executed Loan Agreement;

(5) Copy of the executed settlement statement and updated source and use statement including all Project funding;

(6) Original, executed Forms RD 4279-14, as appropriate;

(7) Borrower's loan closing balance sheet; and

(8) Any other documents required to comply with applicable law or required by the Conditional Commitment or the Agency.

(b) The Lender must provide their certification to each condition specified in paragraphs (b)(1) through (16) of this section. The Lender may rely on certain written materials (including but not limited to certifications, evaluations, appraisals, financial statements and other reports) to be provided by the Borrower or other qualified third parties (including, among others, one or more independent engineers, appraisers, accountants, attorneys, consultants or other experts.) If the Lender is unable to provide any of the certifications required under this section, the Lender must provide an explanation satisfactory to the Agency as to why the Lender is unable to provide the certification. The Lender can request the guarantee prior to construction, but must still certify to all conditions in paragraphs (b)(1) through (16) of this section.

(1) If required, hazard, flood, liability, worker compensation, and life insurance are in effect.

(2) All truth-in-lending and equal credit opportunity requirements have been met.

(3) The loan has been properly closed, and the required security instruments have been properly executed, or will be promptly obtained on any property that cannot be immediately secured under State law.

(4) The Borrower has or will have marketable title to the Collateral, subject to the guaranteed loan and to any other exceptions approved in writing by the Agency.

(5) The loan proceeds have been or will be disbursed for purposes and in amounts consistent with the Conditional Commitment and the application submitted to the Agency.

(6) When required, personal or corporate guarantees have been obtained in accordance with §4279.245.

(7) All requirements of the Conditional Commitment have been met.

(8) Lien priorities are consistent with the requirements of the Conditional Commitment. No claims or liens of laborers, subcontractors, suppliers of machinery and equipment, materialmen, or other parties have been filed against the Collateral and no suits are pending or threatened that would adversely affect the Collateral when the security instruments are filed.

(9) There has been neither any Material Adverse Change in the Borrower's financial condition nor any other Material Adverse Change in the Borrower, for any reason, during the period of time from the Agency's issuance of the Conditional Commitment to issuance of the Loan Note Guarantee regardless of the cause or causes of the change and whether or not the change or causes of the change were within the Lender's or Borrower's control. The Lender must address any assumptions or reservations in this certification and must address all Material Adverse Changes of the Borrower, any parent, Affiliate, or subsidiary of the Borrower, and guarantors.

(10) Neither the Lender nor any of the Lender's officers has an ownership interest in the Borrower or is an officer or director of the Borrower, and neither the Borrower nor its officers, directors, stockholders, or other owners have more than a 5 percent ownership interest in the Lender.

(11) The Loan Agreement includes all Borrower compliance measures identified in the Agency's environmental review process for avoiding or reducing adverse environmental impacts of the Project's construction or operation.

(12) For loans exceeding $150,000, the Lender has certified its compliance with the Anti-Lobby Act (18 U.S.C. 1913). Also, if any funds have been, or will be, paid to any Person for influencing or attempting to influence an officer or employee of any agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this commitment providing for the United States to guarantee a loan, the Lender must completely disclose such lobbying activities in accordance with 31 U.S.C. 1352.

(13) Where applicable, the Lender must certify that the Borrower has obtained:

(i) A legal opinion relative to the title to rights-of-way and easements. Lenders are responsible for ensuring that Borrowers have obtained valid, continuous, and adequate rights-of-way and easements needed for the construction, operation and maintenance of a facility; and

(ii) A title opinion or title insurance showing ownership of the land and all mortgages or other lien defects, restrictions, or encumbrances, if any. It is the responsibility of the Lender to ensure that the Borrower has obtained and recorded such releases, consents, or subordinations to such property rights from holders of outstanding liens or other instruments as may be necessary for the construction, operation and maintenance of the facility and to provide the required security. For example, when a site is for utility-type facilities (such as a gas distribution system) and the Lender and Borrower are able to obtain only a right-of-way or easement on such site rather than a fee simple title, such a title opinion must be provided.

(14) Each Borrower shall certify to the Lender that all laborers and mechanics employed by contractors or subcontractors in the performance of construction work financed in whole or in part with guaranteed loan funds under this subpart shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with 40 U.S.C. 3141 through 3144, 3146, and 3147. Awards under this subpart are further subject to the relevant regulations contained in Title 29 of the CFR.

(15) The Lender certifies that it has reviewed all contract documents and verified compliance with 40 U.S.C. 3141 through 3144, 3146, and 3147 and Title 29 of the CFR. The Lender will certify that the same process will be completed for all future contracts and any changes to existing contracts.

(16) The Lender certifies that the proposed facility complies with all Federal, State, and local laws and regulatory rules that are in existence and that affect the Project, the Borrower, or Lender activities.

(c) The Agency may, at its discretion, request copies of loan documents for its file.

(d) When the Agency is satisfied that all conditions for the guarantee have been met, the Agency will issue the Loan Note Guarantee(s) and the documents identified in paragraphs (d)(1) and (2) of this section, as appropriate.

(1) Assignment Guarantee Agreement. In the event the Lender uses the single Promissory Note option and assigns the guaranteed portion of the loan to a Holder, the Lender, Holder, and the Agency will execute the Assignment Guarantee Agreement.

(2) Certificate of Incumbency. If requested by the Lender, the Agency will provide the Lender with a certification on Form 4279-7, “Certificate of Incumbency and Signature,” of the signature and title of the Agency official who signs the Loan Note Guarantee, Lender's Agreement, and Assignment Guarantee Agreement.

§4279.282   [Reserved]

§4279.283   Refusal to execute Loan Note Guarantee.

If the Agency determines that it cannot execute the Loan Note Guarantee, the Agency will inform the Lender, in writing, of the reasons and give the Lender a reasonable period within which to satisfy the objections. If the Lender satisfies the objections within the time allowed, the Agency will issue the Loan Note Guarantee. If the Lender requests additional time in writing and within the period allowed, the Agency may grant the request.

§§4279.284-4279.289   [Reserved]

§4279.290   Requirements after Project construction.

Once the Project has been constructed, the Lender must meet the requirements specified in paragraphs (a) and (b) of this section.

(a) Provide the Agency annual reports from the Borrower commencing the first full calendar year following the year in which Project construction was completed and continuing for the life of the guaranteed loan. The Borrower's reports will include, but not be limited to, the information specified in paragraphs (a)(1) through (8), as applicable, of this section.

(1) The actual amount of Advanced Biofuels, Biobased Products including Renewable Chemicals, and Byproducts produced.

(2) If applicable, documentation that identified health or sanitation problems have been solved.

(3) A summary of the cost of operating and maintaining the facility.

(4) A description of any maintenance or operational problems associated with the facility.

(5) Certification that the Project is and has been in compliance with all applicable State and Federal environmental laws and regulations.

(6) The number of jobs created.

(7) A description of the status of the Project's feedstock including, but not limited to, the feedstock being used, outstanding feedstock contracts, feedstock changes and interruptions, and quality of the feedstock.

(8) The results of the annual inspections conducted under paragraph (b) of this section.

(b) For the life of the guaranteed loan, conduct annual inspections.

§§4279.291-4279.299   [Reserved]

§4279.300   OMB control number.

In accordance with the Paperwork Reduction Act of 1995, the information collection requirements contained in the subsequent interim rule have been submitted to the Office of Management and Budget (OMB) under OMB control number 0570-0065 for approval. A person is not required to respond to a collection of information unless it displays a currently valid OMB control number.