Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 5, 2020

Title 47Chapter ISubchapter BPart 25Subpart B → Subject Group


Title 47: Telecommunication
PART 25—SATELLITE COMMUNICATIONS
Subpart B—Applications and Licenses


Forfeiture, Termination, and Reinstatement of Station Authorization

§25.160   Administrative sanctions.

(a) A forfeiture may be imposed for failure to operate in conformance with the Communications Act, license specifications, any conditions imposed on an authorization, or any of the Commission's rules and regulations; or for failure to comply with Commission requests for information needed to complete international coordination or for failure to cooperate in Commission investigations with respect to international coordination.

(b) A forfeiture will be imposed and the station license may be terminated for the malicious transmissions of any signal that causes harmful interference with any other radio communications or signals.

(c) A station license may be revoked for any repeated and willful violation of the kind set forth in paragraphs (a) and (b) of this section.

(d) The sanctions specified in paragraphs (a), (b), and (c) of this section will be imposed only after the licensee has been provided an opportunity to be heard pursuant to titles III and V of the Communications Act of 1934, as amended.

(e) For purposes of this section, the term “repeated” and “willful” are defined as set out in section 312(f) of the Communications Act, 47 U.S.C. 312(f).

§25.161   Automatic termination of station authorization.

A station authorization shall be automatically terminated in whole or in part without further notice to the licensee upon:

(a)(1) The failure to meet an applicable milestone specified in §25.164(a) or (b), if no authorized space station is functional in orbit;

(2) The failure to meet an applicable milestone specified in §25.164(b)(1) or (2), if at least one authorized space station is functional in an authorized orbit, which failure will result in the termination of authority for the space stations not in orbit as of the milestone date, but allow for technically identical replacements; or

(3) The failure to meet any other milestone or construction requirement imposed as a condition of authorization. In the case of a space station authorization when at least one authorized space station is functional in orbit, however, such termination will be with respect to only the authorization for any space stations not in orbit as of the milestone date.

(b) The expiration of the license term, unless, in the case of an earth station license, an application for renewal of the license has been filed with the Commission pursuant to §25.121(e) or, in the case of a space station license, an application for extension of the license term has been filed with the Commission; or

(c) The removal or modification of the facilities which renders the station not operational for more than 90 days, unless specific authority is requested.

(d) The failure to maintain 50 percent of the maximum number of NGSO space stations authorized for service following the 9-year milestone period as functional space stations in authorized orbits, which failure will result in the termination of authority for the space stations not in orbit as of the date of noncompliance, but allow for technically identical replacements.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51507, Aug. 27, 2003; 78 FR 8425, Feb. 6, 2013; 79 FR 8320, Feb. 12, 2014; 82 FR 59985, Dec. 18, 2017]

§25.162   Cause for termination of interference protection.

The protection from interference afforded by the registration of a receiving earth station shall be automatically terminated if:

(a) The request for registration is not submitted to the Commission within 3 months of the completion of the frequency coordination process, except as provided for in §25.203;

(b) The receiving earth station is not constructed and placed into service within 6 months after completion of coordination;

(c) The Commission finds that the station has been used less than 50% of the time during any 12 month period;

(d) The Commission finds that the station has been used for an unlawful purpose or otherwise in violation of the Commission's rules, regulations or policies;

(e) The Commission finds that the actual use of the facility is inconsistent with what was set forth in the registrant's application; or

(f) The Commission finds that the frequency coordination exhibit, upon which the granted registration is based, is incomplete or does not conform with established coordination procedures.

§25.163   Reinstatement.

(a) A station authorization terminated in whole or in part under the provisions of §25.161 may be reinstated if the Commission, in its discretion, determines that reinstatement would best serve the public interest, convenience and necessity. Petitions for reinstatement will be considered only if:

(1) The petition is filed within 30 days after the expiration date set forth in §25.161(a) or §25.161(b), whichever is applicable;

(2) The petition explains the failure to file a timely notification or renewal application; and

(3) The petition sets forth with specificity the procedures that have been established to ensure timely filings in the future.

(b) A special temporary authorization shall automatically terminate upon the expiration date specified therein, or upon failure of the grantee to comply with any special terms or conditions set forth in the authorization. Temporary operation may be extended beyond the termination date only upon application to the Commission.

[56 FR 24016, May 28, 1991, as amended at 81 FR 55334, Aug. 18, 2016]

§25.164   Milestones.

(a) The recipient of an initial license for a GSO space station, other than a DBS space station, SDARS space station, or replacement space station as defined in §25.165(e), must launch the space station, position it in its assigned orbital location, and operate it in accordance with the station authorization no later than 5 years after the grant of the license, unless a different schedule is established by Title 47, Chapter I, or the Commission.

(b)(1) The recipient of an initial authorization for an NGSO satellite system, other than an SDARS system, must launch 50 percent of the maximum number of space stations authorized for service, place them in their assigned orbits, and operate them in accordance with the station authorization no later than 6 years after the grant of the authorization, unless a different schedule is established by Title 47, Chapter I. This paragraph does not apply to replacement NGSO space stations as defined in §25.165(e).

(2) A licensee that satisfies the requirement in paragraph (b)(1) of this section must launch the remaining space stations necessary to complete its authorized service constellation, place them in their assigned orbits, and operate each of them in accordance with the authorization no later than nine years after the grant of the authorization.

(c)-(e) [Reserved]

(f) A licensee subject to the requirements in paragraph (a) or (b) of this section must either demonstrate compliance with the applicable requirement or notify the Commission in writing that the requirement was not met, within 15 days after the specified deadline. Compliance with a milestone requirement in paragraph (a) or (b) of this section may be demonstrated by certifying pursuant to §25.121(d) that the space station(s) in question, has, or have, been launched and placed in the authorized orbital location or non-geostationary orbit(s) and that in-orbit operation of the space station or stations has been tested and found to be consistent with the terms of the authorization.

(g) Licensees of satellite systems that include both NGSO satellites and GSO satellites must meet the requirement in paragraph (a) of this section with respect to the GSO satellite(s) and the applicable requirements in paragraph (b) of this section with respect to the NGSO satellites.

(h) In cases where the Commission grants a satellite authorization in different stages, such as a license for a satellite system using feeder links or inter-satellite links, the earliest of the milestone schedules will be applied to the entire satellite system.

[68 FR 51507, Aug. 27, 2003, as amended at 69 FR 51587, Aug. 20, 2004; 79 FR 8320, Feb. 12, 2014; 81 FR 55334, Aug. 18, 2016; 82 FR 59985, Dec. 18, 2017]

§25.165   Surety bonds.

Link to an amendment published at 85 FR 43735, July 20, 2020.

(a) For all space station licenses issued after September 20, 2004, other than licenses for DBS space stations, SDARS space stations, and replacement space stations as defined in paragraph (e) of this section, the licensee must post a bond within 30 days of the grant of its license. Failure to post a bond will render the license null and void automatically.

(1) An NGSO licensee must have on file a surety bond requiring payment in the event of default as defined in paragraph (c) of this section, in an amount, at a minimum, determined according to the following formula, with the resulting dollar amount rounded to the nearest $10,000: A = $1,000,000 + $4,000,000 * D/2192, where A is the amount to be paid and D is the lesser of 2192 or the number of days that elapsed from the date of license grant until the date when the license was surrendered.

(2) A GSO licensee must have on file a surety bond requiring payment in the event of default as defined in paragraph (c) of this section, in an amount, at a minimum, determined according to the following formula, with the resulting dollar amount rounded to the nearest $10,000: A = $1,000,000 + $2,000,000 * D/1827, where A is the amount to be paid and D is the lesser of 1827 or the number of days that elapsed from the date of license grant until the date when the license was surrendered.

(3) Licensees of satellite systems including both NGSO space stations and GSO space stations that will operate in the same frequency bands must file a surety bond requiring payment in the event of default as defined in paragraph (c) of this section, in an amount, at a minimum, to be determined according to the formula in paragraph (a)(1) of this section.

(b) The licensee must use a surety company deemed acceptable within the meaning of 31 U.S.C. 9304 et seq. (See, e.g., Department of Treasury Fiscal Service, Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and As Acceptable Reinsurance Companies, 57 FR 29356, July 1, 1992.) The bond must name the U.S. Treasury as beneficiary in the event of the licensee's default. The licensee must provide the Commission with a copy of the performance bond, including all details and conditions.

(c) A licensee will be considered to be in default with respect to a bond filed pursuant to paragraph (a) of this section if it surrenders the license before meeting an applicable milestone requirement in §25.164(a) or (b)(1) or if it fails to satisfy any such milestone.

(d) A licensee will be relieved of its bond obligation under paragraph (a) of this section upon a Commission finding that the licensee has satisfied the applicable milestone requirement(s) in §25.164(a) and (b)(1) for the authorization.

(e) A replacement space station is one that:

(1) Is authorized to operate at an orbital location within ±0.15° of the assigned location of a GSO space station to be replaced or is authorized for NGSO operation and will replace an existing NGSO space station in its authorized orbit;

(2) Is authorized to operate in the same frequency bands, and with the same coverage area as the space station to be replaced; and

(3) Is scheduled to be launched so that it will be brought into use at approximately the same time as, but no later than, the existing space station is retired.

(f) An applicant that has submitted a Coordination Request pursuant to §25.110(b)(3)(i) or an Appendix 30B filing pursuant to §25.110(b)(3)(ii) must obtain a surety bond in the amount of $500,000 in accordance with the requirements in paragraph (b) of this section for licensees. The application will be returned as defective pursuant to §25.112 if a copy of the required bond is not filed with the Commission within 30 days after release of a public notice announcing that the Commission has submitted the Coordination Request or Appendix 30B filing to the ITU.

(g) An applicant will be considered to be in default with respect to a bond filed pursuant to paragraph (f) of this section if the applicant fails to submit a complete, acceptable license application pursuant to §25.110(b)(3)(iii) for the operation proposed in the initial application materials filed pursuant to §25.110(b)(3)(i) or (b)(3)(ii) within two years of the date of submission of the initial application materials.

[68 FR 51507, Aug. 27, 2003, as amended at 69 FR 51587, Aug. 20, 2004; 81 FR 55335, Aug. 18, 2016; 82 FR 59986, Dec. 18, 2017]