Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 5, 2020

Title 47Chapter ISubchapter BPart 25Subpart B → Subject Group


Title 47: Telecommunication
PART 25—SATELLITE COMMUNICATIONS
Subpart B—Applications and Licenses


General Application Filing Requirements

§25.110   Filing of applications, fees, and number of copies.

(a) Applications may be filed by going online at licensing.fcc.gov/myibfs and submitting the application through the International Bureau Filing System (IBFS).

(b) Submitting your application. (1) All earth station license applications must be filed electronically on FCC Form 312 in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(2) Except as provided in paragraph (b)(3) of this section, applications for space station licenses must be filed electronically on FCC Form 312 in accordance with the applicable provisions of part 1, subpart Y of this chapter and include all information required by §25.114.

(3) A license application for 17/24 GHz BSS space station operation or for GSO FSS space station operation not subject to the provisions in Appendix 30A of the ITU Radio Regulations (incorporated by reference, see §25.108) may be submitted in two steps, as follows:

(i) An application for 17/24 GHz BSS space station operation or for GSO FSS space station operation not subject to the provisions in Appendix 30B of the ITU Radio Regulations (incorporated by reference, see §25.108) may be initiated by filing with the Commission, in accordance with the applicable provisions of part 1, subpart Y of this chapter, a draft Coordination Request and simplified Form 312 for the proposed operation and a declaration of acceptance of ITU cost-recovery responsibility in accordance with §25.111(d). The simplified Form 312, Main Form submission must include the information required by items 1-17, 43, 45, and 46.

(ii) An application for GSO FSS space station operation subject to the provisions in Appendix 30B of the ITU Radio Regulations (incorporated by reference, see §25.108) may be initiated by submitting to the Commission, in accordance with the applicable provisions of part 1, subpart Y of this chapter, a draft ITU filing to convert an allotment into an assignment, to introduce an additional system, or to modify an assignment in the Appendix 30B List accompanied by a simplified Form 312 and a declaration of acceptance of ITU cost-recovery responsibility in accordance with §25.111(d). The simplified Form 312, Main Form submission must include the information required by items 1-17, 43, 45, and 46. In addition, the applicant must submit the results of an analysis demonstrating that no U.S. filing under Appendix 30B would be deemed affected by the proposed operation under the relevant ITU criteria or, for any affected filings, a letter signed by the affected operator that it consents to the new filing.

(iii) An application initiated pursuant to paragraphs (b)(3)(i) or (b)(3)(ii) of this section will be considered completed by the filing of an FCC Form 312 and the remaining information required in a complete license application, including the information required by §25.114, within two years of the date of submission of the initial application materials.

(c) All correspondence concerning any application must identify:

(1) The applicant's name,

(2) The call sign of the space station or earth station, and

(3) The file number of the application.

(d) Copies. Applications must be filed electronically though IBFS. The Commission will not accept any paper version of any application.

(e) Signing. Upon filing an application electronically, the applicant must print out the filed application, obtain the proper signatures, and keep the original in its files.

(f) An applicant must pay the appropriate filing fee in accordance with part 1, subpart G of this chapter, at the time when it files a FCC Form 312.

[69 FR 47793, Aug. 6, 2004, as amended at 78 FR 8420, Feb. 6, 2013; 81 FR 55325, Aug. 18, 2016]

§25.111   Additional information, ITU filings, and ITU cost recovery.

(a) The Commission may request from any party at any time additional information concerning any application, or any other submission or pleading regarding an application, filed under this part.

(b) Applicants and licensees of radio stations governed by this part must provide the Commission with the information required for Advance Publication, Coordination, and Notification of frequency assignment filings, including due diligence information, pursuant to the Radio Regulations of the International Telecommunication Union. No protection from interference caused by radio stations authorized by other Administrations is guaranteed unless ITU procedures are timely completed or, with respect to individual Administrations, coordination agreements are successfully completed. A license for which such procedures have not been completed may be subject to additional terms and conditions required for coordination of the frequency assignments with other Administrations.

(c) In the Direct Broadcast Satellite service, applicants and licensees shall also provide the Commission with all information it requires in order to modify the plans for the Broadcasting-Satellite Service (BSS) in Appendix 30 of the ITU Radio Regulations (RR) and associated feeder-link plans in Appendix 30A of the ITU RR, if the system has technical characteristics differing from those specified in the Appendix 30 BSS Plans, the Appendix 30A feederlink Plans, Annex 5 to Appendix 30, or Annex 3 to Appendix 30A. For such systems, no protection from interference caused by radio stations authorized by other Administrations is guaranteed until the agreement of all affected Administrations is obtained and the frequency assignment becomes a part of the appropriate Region 2 BSS and feeder-link Plans. Authorizations for which coordination is not completed and/or for which the necessary agreements under Appendices 30 and 30A have not been obtained may be subject to additional terms and conditions as required to effect coordination or obtain the agreement of other Administrations. Applicants and licensees shall also provide the Commission with the information required by Appendix 4 of the ITU RR for advance publication and notification or coordination of the frequencies to be used for tracking, telemetry and control functions of DBS systems.

(d) The Commission will submit filings to the ITU on behalf of an applicant, licensee, or other requesting party only after the party has filed a signed declaration of unconditional acceptance of all consequent ITU cost-recovery responsibility. Applicants and licensees must file the declaration electronically in the “Other Filings” tab of the application file in the IBFS database, and must also mail a paper copy to the International Bureau, Satellite Division. In addition, applicants and licensees must reference the call sign and name of the satellite network in the declaration. All cost-recovery declarations must include the name(s), address(es), email address(es), and telephone number(s) of a contact person, or persons, responsible for cost recovery inquiries and ITU correspondence and filings. Supplements must be filed as necessary to apprise the Commission of changes in the contact information until the ITU cost-recovery responsibility is discharged. The applicant, licensee, or other party must remit payment of any resultant cost-recovery fee to the ITU by the due date specified in the ITU invoice, unless an appeal is pending with the ITU that was filed prior to the due date. A license granted in reliance on such a commitment will be conditioned upon discharge of any such cost-recovery obligation. Where an applicant or licensee has an overdue ITU cost-recovery fee and does not have an appeal pending with the ITU, the Commission will dismiss any application associated with that satellite network.

(e) The Commission will process and forward to the ITU up to five Advance Publication filings by an entity that are not accompanied by a complete space station license application or by an application pursuant to §25.110(b)(3)(i) or (b)(3)(ii). Such Advance Publication filing requests not contained in an application must be accompanied by a letter request and a signed ITU cost-recovery declaration pursuant to paragraph (d) of this section. A request for filing of Advance Publication information will be attributed to an entity in the same manner as a space station license application under the criteria set forth in §25.159(c).

Note to paragraph (e): After June 30, 2016, the Commission will not forward Advance Publication information for satellite networks or systems subject to Article 9, Section II of the ITU Radio Regulations (incorporated by reference, see §25.108).

[56 FR 24016, May 28, 1991, as amended at 67 FR 51113, Aug. 7, 2002; 68 FR 63997, Nov. 12, 2003; 78 FR 8421, Feb. 6, 2013; 79 FR 8314, Feb. 12, 2014; 81 FR 55325, Aug. 18, 2016]

§25.112   Dismissal and return of applications.

Link to an amendment published at 85 FR 43733, July 20, 2020.

(a) An application will be unacceptable for filing and will be returned to the applicant with a brief statement identifying the omissions or discrepancies if:

(1) The application is defective with respect to completeness of answers to questions, informational showings, internal inconsistencies, execution, or other matters of a formal character; or

(2) The application does not substantially comply with the Commission's rules, regulations, specific requests for additional information, or other requirements.

(3) The application requests authority to operate a space station in a frequency band that is not allocated internationally for such operations under the Radio Regulations of the International Telecommunication Union.

(4) The application is identical to a pending application that was timely filed pursuant to §25.157 or §25.158.

(b) Applications for space station authority found defective under paragraph (a)(3) or (a)(4) of this section will not be considered. Applications for authority found defective under paragraphs (a)(1) or (a)(2) of this section may be accepted for filing if:

(1) The application is accompanied by a request which sets forth the reasons in support of a waiver of (or an exception to), in whole or in part, any specific rule, regulation, or requirement with which the application is in conflict;

(2) The Commission, upon its own motion, waives (or allows an exception to), in whole or in part, any rule, regulation or requirement.

(c) The Commission will dismiss an application for failure to prosecute or for failure to respond substantially within a specified time period to official correspondence or requests for additional information. Dismissal will be without prejudice unless the application is mutually exclusive pursuant to §25.155, in which case it will be dismissed with prejudice.

(d) An application will be dismissed without prejudice as a matter of right if the applicant requests its dismissal prior to final Commission action.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51502, Aug. 27, 2003; 79 FR 8314, Feb. 12, 2014; 81 FR 55326, Aug. 18, 2016]

§25.113   Station construction, deployment approval, and operation of spare satellites.

Link to an amendment published at 85 FR 43733, July 20, 2020.

(a) Construction permits are not required for earth stations. Construction of such stations may commence prior to grant of an earth station license at the applicant's own risk, subject to the requirements of §1.1312 and part 17 of this chapter concerning environmental processing and construction, marking, and lighting of antenna structures.

(b) Construction permits are not required for Ancillary Terrestrial Component (ATC) stations. A party with licenses issued under this part for launch and operation of 1.5/1.6 GHz or 1.6/2.4 GHz GHz Mobile-Satellite Service space stations and operation of associated ATC facilities may commence construction of ATC base stations at its own risk after commencing physical construction of the space stations, subject to the requirements of §1.1312 and part 17 of this chapter. Such an MSS/ATC licensee may also conduct equipment tests for the purpose of making adjustments and measurements necessary to ensure compliance with the terms of its ATC license, applicable rules in this part, and technical design requirements. Prior to commencing such construction and pre-operational testing, an MSS/ATC licensee must notify the Commission of the commencement of physical satellite construction and the licensee's intention to construct and test ATC facilities. This notification must be filed electronically in the appropriate file in the International Bureau Filing System database. The notification must specify the frequencies the licensee proposes to use for pre-operational testing and the name, address, and telephone number of a representative for the reporting and mitigation of any interference resulting from such testing. MSS/ATC licensees engaging in pre-operational testing must comply with §§5.83, 5.85(c), 5.111, and 5.117 of this chapter regarding experimental operations. An MSS/ATC licensee may not offer ATC service to the public for compensation during pre-operational testing.

(c)-(e) [Reserved]

(f) Construction permits are not required for U.S.-licensed space stations, except for stations that the applicant proposes to operate to disseminate program content to be received by the public at large, rather than only by subscribers. Construction of a station for which a construction permit is not required may commence, at the applicant's own risk, prior to grant of a license.

(g) Except as set forth in paragraphs (h) and (i) of this section, approval for orbital deployment and a station license (i.e., operating authority) must be applied for and granted before a space station may be deployed and operated in orbit. Approval for orbital deployment may be requested in an application for a space station license. However, an application for authority to deploy and operate an on-ground spare satellite will be considered pursuant to the following procedures:

(1) Applications for deployment and operation of an on-ground spare NGSO-like satellite will be considered pursuant to the procedures set forth in §25.157, except as provided in paragraph (g)(3) of this section.

(2) Applications for deployment and operation of an on-ground spare GSO-like satellite will be considered pursuant to the procedures set forth in §25.158, except as provided in paragraph (g)(3) of this section.

(3) Neither paragraph (g)(1) nor (g)(2) of this section will apply in cases where the space station to be deployed is determined to be an emergency replacement for a previously authorized space station that has been lost as a result of a launch failure or a catastrophic in-orbit failure.

(h) An operator of NGSO space stations under a blanket license granted by the Commission need not apply for license modification to operate technically identical in-orbit spare satellites in an authorized orbit. However, the licensee must notify the Commission within 30 days of bringing an in-orbit spare into service and certify that its activation has not exceeded the number of space stations authorized to provide service and that the licensee has determined by measurement that the activated spare is operating within the terms of the license.

(i) An operator of NGSO space stations under a blanket license granted by the Commission need not apply for license modification to deploy and operate technically identical replacement satellites in an authorized orbit within the term of the system authorization. However, the licensee must notify the Commission of the intended launch at least 30 days in advance and certify that its operation of the additional space station(s) will not increase the number of space stations providing service above the maximum number specified in the license.

[56 FR 24016, May 28, 1991, as amended at 61 FR 4366, Feb. 6, 1996; 61 FR 9951, Mar. 12, 1996; 61 FR 55582, Oct. 28, 1996; 62 FR 5927, Feb. 10, 1997; 62 FR 64172, Dec. 4, 1997; 68 FR 51502, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005; 77 FR 3954, Jan. 26, 2012; 78 FR 8421, Feb. 6, 2013; 79 FR 8314, Feb. 12, 2014; 79 FR 27503, May 14, 2014; 81 FR 55326, Aug. 18, 2016]

Effective Date Note: At 79 FR 27503, May 14, 2014, in §25.113, in the second sentence in paragraph (b), “1.5/1.6 GHz, 1.6/2.4 GHz, or 2 GHz Mobile-Satellite Service” was corrected to read “1.5/1.6 GHz or 1.6/2.4 GHz GHz Mobile-Satellite Service”. This amendment contains information collection and recordkeeping requirements and will not become effective until approval has been given by the Office of Management and Budget.

§25.114   Applications for space station authorizations.

Link to an amendment published at 85 FR 43733, July 20, 2020.

(a)(1) A license application filed pursuant to §25.110(b)(2) for a GSO space station or NGSO space station or space-station constellation must comprise a comprehensive proposal and must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits required by paragraph (d) of this section.

(2) An application for blanket authority for an NGSO constellation of space stations that are not all technically identical must provide the information required by paragraphs (c) and (d) of this section for each type of station in the constellation.

(3) For an application filed pursuant to the two-step procedure in §25.110(b)(3), the filing pursuant to §25.110(b)(3)(iii) must be submitted on FCC Form 312, Main Form and Schedule S, with attached exhibits as required by paragraph (d) of this section, and must constitute a comprehensive proposal.

(b) Each application for a new or modified space station authorization must contain the formal waiver required by 47 U.S.C. 304.

(c) The following information shall be filed on FCC Form 312, Main Form and Schedule S:

(1) Name, address, and telephone number of the applicant;

(2) Name, address, and telephone number of the person(s), including counsel, to whom inquiries or correspondence should be directed;

(3) Type of authorization requested (e.g., launch authority, station license, modification of authorization);

(4)(i) For each space station transmitting and receiving antenna beam (including telemetry and tracking beams but not command beams), specify channel center frequencies and bandwidths and polarization plan. For command beams, specify each of the center frequencies within a 5 MHz range or a range of 2 percent of the assigned bandwidth, whichever is smaller, and the polarization plan. If the space station can vary channel bandwidth in a particular frequency band with on-board processing, specify only the range of frequencies in that band over which the beam can operate and the polarization plan.

(ii) Specify maximum EIRP and maximum EIRP density for each space station transmitting antenna beam. If the satellite uses shapeable antenna beams, as defined in §25.103, specify instead maximum possible EIRP and maximum possible EIRP density within each shapeable beam's proposed coverage area. Provide this information for each frequency band in which the transmitting antenna would operate. For bands below 15 GHz, specify EIRP density in dBW/4 kHz; for bands at and above 15 GHz, specify EIRP density in dBW/MHz. If the EIRP density varies over time, specify the maximum possible EIRP density.

(iii)-(iv) [Reserved]

(v) For each space station receiving beam other than command beams, specify the gain-to-temperature ratio at beam peak. For receiving beams fed into transponders, also specify the minimum and maximum saturation flux density at beam peak. If the satellite uses shapeable beams, specify the minimum and maximum gain-to-temperature ratio within each shapeable beam's proposed coverage area, and for shapeable receiving beams fed into transponders, specify the minimum and maximum saturation power flux density within the 0 dB relative antenna gain isoline. Provide this information for each frequency band in which the receiving beam can operate. For command beams, specify the beam peak flux density at the command threshold;

(vi)(A) For space stations in geostationary orbit, specify predicted space station antenna gain contour(s) for each transmit and receive antenna beam, except for beams where the contour at 8 dB below peak falls entirely beyond the edge of the visible Earth. These contour(s) should be plotted on an area map at 2 dB intervals down to 10 dB below the peak gain and at 5 dB intervals between 10 dB and 20 dB below the peak gain. Applicants must present this information in a GIMS-readable format.

(B) For space stations in non-geostationary orbits, specify for each unique orbital plane the predicted antenna gain contour(s) for each transmit and receive antenna beam for one space station if all space stations are identical in the constellation. If individual space stations in the constellation have different antenna beam configurations, specify the predicted antenna gain contours for each transmit and receive beam for each space station type and orbit or orbital plane requested. The contours should be plotted on an area map with the beam depicted on the surface of the earth with the space stations' peak antenna gain pointed at nadir to a latitude and longitude within the proposed service area. The contour(s) should be plotted at 2 dB intervals down to 10 dB below the peak gain and at 5 dB intervals between 10 dB and 20 dB below the peak gain. For intersatellite links, specify the peak antenna gain and 3 dB beamwidth.

(C) For space stations with shapeable antenna beams, specify the contours, as defined in paragraph (c)(4)(vi)(A) or (B) of this section, for the transmitting beam configuration that results in the highest EIRP density for the beams listed in paragraph (c)(4)(ii) of this section and for the receiving beam configuration with the smallest gain-to-temperature ratio and the highest required saturation power flux density for the beams listed in paragraph (c)(4)(v) of this section. If the shapeable beams are also steerable, include the contours that would result from moving the beam peak around the limit of the effective beam peak area and the 0 dB relative antenna gain isoline. The proposed maximum coverage area must be clearly specified.

(D) For a space station with steerable beams that are not shapeable, specify the applicable contours, as defined in paragraph (c)(4)(vi)(A) or (c)(4)(vi)(B) of this section, with a description of a proposed coverage area for each steerable beam or provide the contour information described in paragraph (c)(4)(vi)(C) of this section for each steerable beam.

(vii) For geostationary satellites with large numbers of identical fixed spot beams, other than DBS satellites, applicants may, as an alternative to submitting the information described in paragraph (c)(4)(vi) of this section with respect to these beams, provide the predicted antenna gain contours for one transmit and receive antenna beam, together with one of the following:

(A) An area map showing all of the spot beams depicted on the surface of the Earth;

(B) A table identifying the maximum antenna gain point(s) in latitude and longitude to the nearest 0.1 degree; or

(C) A map of the isolines formed by combining all of the spot beams into one or more composite beams. For non-geostationary satellites with large numbers of identical fixed beams on each satellite, applicants may, as an alternative to submitting the information described in paragraph (c)(4)(vi) of this section with respect to those beams, specify the predicted antenna gain contours for one transmit and receive beam pointed to nadir, together with an area map showing all of the spot beams depicted on the surface of the earth with the satellites' peak antenna gain pointed to a selected latitude and longitude within the service area.

(5) For space stations in geostationary orbit:

(i) Orbital location requested,

(ii) [Reserved]

(iii) East-west station-keeping range,

(iv) North-south station-keeping range, and

(v) Accuracy to which antenna axis attitude will be maintained;

(6) For space stations in non-geostationary orbits:

(i) The number of orbital planes and the number of space stations in each plane,

(ii) The inclination of the orbital plane(s),

(iii) The orbital period,

(iv) The apogee,

(v) The perigee,

(vi) The argument(s) of perigee,

(vii) Active service arc(s),

(viii) Right ascension of the ascending node(s), and

(ix) For each satellite in each orbital plane, the initial phase angle at the reference time;

(7) The frequency bands, types of service, and coverage areas;

(8) Calculated maximum power flux-density levels within each coverage area and energy dispersal bandwidths, if any, needed for compliance with §25.208, for the angles of arrival specified in the applicable paragraph(s) of §25.208, except for an NGSO FSS applicant certifying compliance with PFD limits under §25.146(a)(1);

(9) [Reserved]

(10) Estimated operational lifetime;

(11) Whether the space station is to be operated on a common carrier basis;

(12) [Reserved]

(13) And the polarization information necessary to determine compliance with §25.210(i).

(d) The following information in narrative form shall be contained in each application:

(1) Overall description of system facilities, operations and services and explanation of how uplink frequency bands would be connected to downlink frequency bands;

(2)-(5) [Reserved]

(6) Public interest considerations in support of grant;

(7) Applicants for authorizations for space stations in the Fixed-Satellite Service, including applicants proposing feeder links for space stations operating in the 17/24 GHz Broadcasting-Satellite Service, must also include the information specified in §25.140(a). Applicants for authorizations for space stations in the 17/24 GHz Broadcasting-Satellite Service must also include the information specified in §25.140(b);

(8) Applications for authorizations in the Mobile-Satellite Service in the 1545-1559/1646.5-1660.5 MHz frequency bands shall also provide all information necessary to comply with the policies and procedures set forth in Rules and Policies Pertaining to the Use of Radio Frequencies in a Land Mobile Satellite Service, 2 FCC Rcd 485 (1987) (Available at address in §0.445 of this chapter.);

(9) Applications to license multiple space station systems in the non-voice, non-geostationary mobile-satellite service under blanket operating authority shall also provide all information specified in §25.142; and

(10) An application for space station authorization in the 1.6/2.4 GHz or 2 GHz Mobile-Satellite Service must include information required by §25.143(b);

(11) Applications for space stations in the Direct Broadcast Satellite Service must include a clear and detailed statement of whether the space station is to be operated on a broadcast or non-broadcast basis;

(12) The information required by §25.146, if the application is for an NGSO FSS system authorization within the 10.7-30 GHz band.

(13) For satellite applications in the Direct Broadcast Satellite Service, if the proposed system's technical characteristics differ from those specified in the Appendix 30 BSS Plans, the Appendix 30A feeder link Plans, Annex 5 to Appendix 30 or Annex 3 to Appendix 30A of the ITU Radio Regulations, each applicant must provide:

(i) The information requested in Appendix 4 of the ITU Radio Regulations. Further, applicants must provide sufficient technical showing that the proposed system could operate satisfactorily if all assignments in the BSS and feeder link Plans were implemented.

(ii) Analyses of the proposed system with respect to the limits in Annex 1 to Appendices 30 and 30A of the ITU Radio Regulations.

(14) A description of the design and operational strategies that will be used to mitigate orbital debris, including the following information:

(i) A statement that the space station operator has assessed and limited the amount of debris released in a planned manner during normal operations, and has assessed and limited the probability of the space station becoming a source of debris by collisions with small debris or meteoroids that could cause loss of control and prevent post-mission disposal;

(ii) A statement that the space station operator has assessed and limited the probability of accidental explosions during and after completion of mission operations. This statement must include a demonstration that debris generation will not result from the conversion of energy sources on board the spacecraft into energy that fragments the spacecraft. Energy sources include chemical, pressure, and kinetic energy. This demonstration should address whether stored energy will be removed at the spacecraft's end of life, by depleting residual fuel and leaving all fuel line valves open, venting any pressurized system, leaving all batteries in a permanent discharge state, and removing any remaining source of stored energy, or through other equivalent procedures specifically disclosed in the application;

(iii) A statement that the space station operator has assessed and limited the probability of the space station becoming a source of debris by collisions with large debris or other operational space stations. Where a space station will be launched into a low-Earth orbit that is identical, or very similar, to an orbit used by other space stations, the statement must include an analysis of the potential risk of collision and a description of what measures the space station operator plans to take to avoid in-orbit collisions. If the space station operator is relying on coordination with another system, the statement must indicate what steps have been taken to contact, and ascertain the likelihood of successful coordination of physical operations with, the other system. The statement must disclose the accuracy—if any—with which orbital parameters of non-geostationary satellite orbit space stations will be maintained, including apogee, perigee, inclination, and the right ascension of the ascending node(s). In the event that a system is not able to maintain orbital tolerances, i.e., it lacks a propulsion system for orbital maintenance, that fact should be included in the debris mitigation disclosure. Such systems must also indicate the anticipated evolution over time of the orbit of the proposed satellite or satellites. Where a space station requests the assignment of a geostationary-Earth orbit location, it must assess whether there are any known satellites located at, or reasonably expected to be located at, the requested orbital location, or assigned in the vicinity of that location, such that the station keeping volumes of the respective satellites might overlap. If so, the statement must include a statement as to the identities of those parties and the measures that will be taken to prevent collisions;

(iv) A statement detailing the post-mission disposal plans for the space station at end of life, including the quantity of fuel—if any—that will be reserved for post-mission disposal maneuvers. For geostationary-Earth orbit space stations, the statement must disclose the altitude selected for a post-mission disposal orbit and the calculations that are used in deriving the disposal altitude. The statement must also include a casualty risk assessment if planned post-mission disposal involves atmospheric re-entry of the space station. In general, an assessment should include an estimate as to whether portions of the spacecraft will survive re-entry and reach the surface of the Earth, as well as an estimate of the resulting probability of human casualty. Applicants for space stations to be used only for commercial remote sensing may, in lieu of submitting detailed post-mission disposal plans to the Commission, certify that they have submitted such plans to the National Oceanic and Atmospheric Administration for review.

(v) For non-U.S.-licensed space stations, the requirement to describe the design and operational strategies to minimize orbital debris risk can be satisfied by demonstrating that debris mitigation plans for the space station(s) for which U.S. market access is requested are subject to direct and effective regulatory oversight by the national licensing authority.

(15) Each applicant for a space station license in the 17/24 GHz broadcasting-satellite service shall include the following information as an attachment to its application:

(i) If the applicant proposes to operate in the 17.3-17.7 GHz frequency band, a demonstration that the proposed space station will comply with the power flux density limits in §25.208(w) unless the applicant provides a certification under paragraph (d)(15)(ii) of this section.

(ii) In cases where the proposed space station will not comply with the power flux density limits set forth in §25.208(w) of this part, the applicant will be required to provide a certification that all potentially affected parties acknowledge and do not object to the use of the applicant's higher power flux densities. The affected parties with whom the applicant must coordinate are those GSO 17/24 GHz BSS satellite networks located up to ±6° away for excesses of up to 3 dB above the power flux-density levels specified in §25.208(w) of this part, and up to ±10° away greater for excesses greater than 3 dB above those levels.

(iii) If the applicant proposes to provide international service in the 17.7-17.8 GHz frequency band, a certification that the proposed space station will comply with the power flux density limits in §25.208(c).

(iv) Any information required by §25.264(a)(6), 25.264(b)(4), or 25.264(d).

(16) In addition to the requirements of paragraph (d)(15) of this section, each applicant for a license to operate a 17/24 GHz BSS space station that will be used to provide video programming directly to consumers in the United States, that will not meet the requirements of §25.225 of this part, must include as an attachment to its application a technical analysis demonstrating that providing video programming service to consumers in Alaska and Hawaii that is comparable to the video programming service provided to consumers in the 48 contiguous United States (CONUS) is not feasible as a technical matter or that, while technically feasible, such service would require so many compromises in satellite design and operation as to make it economically unreasonable.

(17) [Reserved]

(18) For space stations in the Direct Broadcast Satellite service or the 17/24 GHz broadcasting-satellite service, maximum orbital eccentricity.

[68 FR 63997, Nov. 12, 2003, as amended at 69 FR 29901, May 26, 2004; 69 FR 47794, Aug. 6, 2004; 69 FR 54587, Sept. 9, 2004; 72 FR 50027, Aug. 29, 2007; 72 FR 60278, Oct. 24, 2007; 76 FR 50431, Aug. 15, 2011; 78 FR 8421, Feb. 6, 2013; 79 FR 8314, Feb. 12, 2014; 81 FR 55326, Aug. 18, 2016; 82 FR 59984, Dec. 18, 2017; 83 FR 34489, July 20, 2018]

§25.115   Applications for earth station authorizations.

(a)(1) Transmitting earth stations. Commission authorization must be obtained for authority to operate a transmitting earth station. Applications for transmitting earth stations must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Applications must be filed electronically on FCC Form 312, Main Form and Schedule B, and include the information specified in this section, except as set forth in paragraph (a)(2) of this section.

(2) Applicants for licenses for transmitting earth stations in the FSS may file on FCC Form 312EZ if all of the following criteria are met:

(i) The application is for a single station that will transmit to an FSS GSO space station, or stations, in the 5925-6425 MHz band, or for single or multiple stations that will transmit to an FSS GSO space station, or stations, in the 14.0-14.5 GHz, 28.35-28.6 GHz, and/or 29.5-30.0 GHz band;

(ii) The earth station(s) will not be installed or operated on ships, aircraft, or other moving vehicles;

(iii) The application meets all relevant criteria in §25.211 or §25.212 or includes information filed pursuant to paragraph (g)(1) of this section indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant levels specified in §25.218; and

(iv) Operation of the proposed station has been successfully coordinated with terrestrial systems, if the station would transmit in the 5925-6425 MHz band;

(v) The application includes an environmental impact statement pursuant to §1.1311 of this chapter, if required;

(vi) The applicant does not propose to communicate via non-U.S.-licensed space stations not on the Permitted Space Station List; and

(vii) If the proposed station(s) will receive in the 18.3-18.8 GHz and/or 19.7-20.2 GHz bands, the applicant proposes to communicate only via satellites for which coordination has been completed pursuant to Footnote US334 of the U.S. Table of Frequency Allocations with respect to Federal Government systems authorized on a primary basis, under an agreement previously approved by the Commission and the National Telecommunications and Information Administration, and the applicant certifies that it will operate consistently with the agreement.

(3) Unless the Commission orders otherwise, an application filed on FCC Form 312EZ in accordance with paragraph (a)(2) of this section will be deemed granted 35 days after the date of the public notice that the application has been accepted for filing, provided no objection is filed during the 30-day public notice period.

(4) [Reserved]

(5) Applicants that are not permitted to submit applications under paragraph (a)(2) of this section on Form 312EZ, must submit, as an attachment to their application, the following information to be used as an “informative” in the public notice issued under §25.151:

(i) A detailed description of the service to be provided, including frequency bands and satellites to be used. The applicant must identify either the specific satellite(s) with which it plans to operate, or the eastern and western boundaries of the arc it plans to coordinate.

(ii) The diameter or equivalent diameter of the antenna.

(iii) Proposed power and power density levels.

(iv) Identification of any random access technique, if applicable.

(v) Identification of a specific rule or rules for which a waiver is requested.

(6)(i) Applicants for earth stations transmitting in frequency bands shared with equal rights between terrestrial and space services must provide a frequency coordination analysis in accordance with §25.203(b) and must include any notification or demonstration required by any other relevant provision in §25.203.

(ii) Applicants for user transceiver units associated with the NVNG MSS must provide the information required by §25.135.

(iii) Applicants for 1.6/2.4 GHz MSS user transceivers must demonstrate that the transceivers will operate in compliance with relevant requirements in §25.213.

(iv) Applicants for earth stations licensed in accordance with §25.136 must demonstrate that the transmitting earth stations will meet the relevant criteria specified in that section, including any showings required under §25.136(a)(4), (c), (d)(4), and/or (e)(4).

(7) In those cases where an applicant is filing a number of essentially similar applications, showings of a general nature applicable to all of the proposed stations may be submitted in the initial application and incorporated by reference in subsequent applications.

(8) Transmissions of signals or programming to non-U.S. licensed satellites, and to and/or from foreign points by means of U.S.-licensed fixed satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements.

(9) Applicants seeking to operate in a shared government/non-government band must provide the half-power beam width of their proposed earth station antenna, as an attachment to their applications.

(10) With the exception of applications for blanket-licensed earth station networks filed pursuant to §25.115(c) or §25.218; applications for conventional Ka-band hub stations filed pursuant to §25.115(e); applications for NGSO FSS gateway earth stations filed pursuant to §25.115(f); applications for individually licensed earth stations filed pursuant to §25.136; applications for ESIMs filed pursuant to §25.115(l), §25.115(m), or §25.115(n); or applications for 29 GHz NGSO MSS feeder-link stations in a complex as defined in §25.257, parties may apply, either in an initial application or an application for modification of license, for operating authority for multiple transmitting FSS earth stations that are not eligible for blanket or network licensing under another section of this part in the following circumstances:

(i) The antennas would transmit in frequency bands shared with terrestrial services on a co-primary basis and the antennas would be sited within an area bounded by 1 second of latitude and 1 second of longitude.

(ii) The antennas would transmit in frequency bands allocated to FSS on a primary basis and there is no co-primary allocation for terrestrial services, and the antennas would be sited within an area bounded by 10 seconds of latitude and 10 seconds of longitude.

(b) Receive-only earth stations. Except as provided in paragraphs (b)(1) and (8) of this section, applications for licenses for receive-only earth stations must be submitted on FCC Form 312, Main Form and Schedule B, accompanied by any required exhibits and the information described in paragraphs (a)(5)(i) through (v) of this section. Such applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(1) Receive-only earth stations in the FSS that operate with U.S.-licensed space stations, or with non-U.S.-licensed space stations that have been duly approved for U.S. market access, may be registered with the Commission in order to protect them from interference from terrestrial microwave stations in bands shared co-equally with the Fixed Service in accordance with the procedures of §§25.203 and 25.251, subject to the stricture in §25.209(c).

(2) Licensing or registration of receive-only earth stations with the Commission confers no authority to receive and use signals or programming received from satellites. See Section 705 of the Communications Act. 47 U.S.C. 605.

(3) Applications for registration must be accompanied by the coordination exhibit required by §25.203 and any other required exhibits.

(4) Complete applications for registration will be placed on public notice for 30 days and automatically granted if no objection is submitted to the Commission and served on the applicant. Additional pleadings are authorized in accordance with §1.45 of this chapter.

(5) The registration of a receive-only earth station results in the listing of an authorized frequency band at the location specified in the registration. Interference protection levels are those agreed to during coordination.

(6) Reception of signals or programming from non-U.S. satellites may be subject to restrictions as a result of international agreements or treaties. The Commission will maintain public information on the status of any such agreements.

(7) Registration term: Registrations for receive-only earth stations governed by this section will be issued for a period of 15 years from the date on which the application was filed. Applications for renewals of registrations must be submitted on FCC Form 312R (Application for Renewal of Radio Station License in Specified Services) no earlier than 90 days and no later than 30 days before the expiration date of the registration.

(8) Applications for modification of license or registration of receive-only earth stations must be made in conformance with §§25.117 and 25.118. In addition, registrants are required to notify the Commission when a receive-only earth station is no longer operational or when it has not been used to provide any service during any 6-month period.

(9)(i) Except as set forth in paragraph (b)(9)(ii) of this section, receive-only earth stations operating with non-U.S. licensed space stations must file an FCC Form 312 requesting a license or modification to operate such station.

(ii) Operators of receive-only earth stations need not apply for a license to receive transmissions from non-U.S.-licensed space stations that have been duly approved for U.S. market access, provided the space station operator and earth station operator comply with all applicable rules in this chapter and with applicable conditions in the Permitted Space Station List or market-access grant.

(c)(1) GSO FSS earth stations in 10.7-12.2 GHz or 14-14.5 GHz. A blanket license application for operation in the 10.7-12.2 GHz or 14-14.5 GHz bands may be filed on FCC Form 312 or Form 312EZ, with a Schedule B for each large (5 meters or larger) hub station antenna and each representative type of small antenna (less than 5 meters) operating within the network; however, blanket licensing in the 10.7-11.7 GHz band is on an unprotected basis with respect to the fixed service.

(i) Applications to license networks of earth stations operating in the 11.7-12.2 GHz and 14.0-14.5 GHz bands under blanket operating authority that meet the requirements of §25.212(c) or §25.218(e) or (f) will be routinely processed.

(ii) Applications to license networks of earth stations operating in the 11.7-12.2 GHz and 14.0-14.5 GHz bands under blanket operating authority that do not meet the requirements of §25.212(c) or §25.218(e) or (f) must comply with the requirements in §25.220 and must be filed on FCC Form 312 with a Schedule B for each large (5 meters or larger) hub station antenna and each representative type of small antenna (less than 5 meters) operating within the network.

(2) Networks of earth stations operating in the 3700-4200 MHz and 5925-6425 MHz bands. Applications to license networks of earth stations operating in the 3700-4200 MHz and 5925-6425 MHz bands must be filed electronically on FCC Form 312, Main Form and Schedule B. Applications will be routinely processed provided that frequency coordination has been satisfactorily completed and that the proposed earth stations comply with the applicable provisions in §25.211(d) or §25.212(d). Alternatively, applicants that have satisfactorily completed frequency coordination may be routinely processed if the proposed earth stations comply with the applicable off-axis EIRP density limits in §25.218(c) or (d).

(i) For earth station antennas operating with power levels not consistent with the applicable provisions in §25.211(d) or §25.212(d), or with EIRP density levels not consistent with those specified in §25.218(c) or (d), the applicant must file an initial lead application providing a detailed overview of the complete network. Such lead applications must fully identify the scope and nature of the service to be provided, as well as the complete technical details of each representative type of antenna that will operate within the network. Such lead applications for a single system must identify:

(A) No more than three geostationary satellites to be accessed;

(B) The amount of frequency bandwidth sought, up to a maximum of 20 MHz of spectrum in each direction at each of the satellites (The same 20 MHz of uplink and 20 MHz of downlink spectrum at each satellite would be accessible by all earth stations in the system. The 20 MHz of uplink and 20 MHz of downlink spectrum need not be the same at each satellite location);

(C) The maximum number of earth station sites;

(ii) Following the issuance of a license for the lead application, the licensee shall notify the Commission of the complete technical parameters of each individual earth station site before that site is bought into operation under the lead authorization. Full frequency coordination of each individual site (e.g., for each satellite and the spectrum associated therewith) shall be completed prior to filing Commission notification. The coordination must be conducted in accordance with §25.203. Such notification shall be done by electronic filing and shall be consistent with the technical parameters of Schedule B of FCC Form 312.

(iii) Following successful coordination of such an earth station, if the earth station operator does not file a lead application or a Schedule B within six months after it successfully completes coordination, it will be assumed that such frequency use is no longer desired, unless a second notification has been received within ten days prior to the end of the six month period. Such renewal notifications must be sent to all parties concerned. If the lead application or Schedule B, or renewal notification, is not timely received, the coordination will lapse and the licensee must re-coordinate the relevant earth stations if it still wishes to bring them into operation.

(iv) Operation of each individual site may commence immediately after the public notice is released that identifies the notification sent to the Commission and if the requirements of paragraph (c)(2)(vi) of this section are met. Continuance of operation of each station for the duration of the lead license term shall be dependent upon successful completion of the normal public notice process. If any objections are received to the new station prior to the end of the 30 day comment period of the Public Notice, the licensee shall immediately cease operation of those particular stations until the coordination dispute is resolved and the licensee informs the Commission of the resolution. If the requirements of paragraph (c)(2)(vi) of this section are not met, operation may not commence until the Commission issues the public notice acting on the terminal authorization.

(v) Each licensee shall annually provide the Commission an updated list of all operational earth stations in its system. The annual list shall also include a list of all earth stations deactivated during the year and identification of the satellites providing service to the network as of the date of the report.

(vi) Conditional authorization. (A) An applicant for a new radio station or modification of an existing station authorized under paragraph (c)(2)(i) of this section in the 3700-4200; or 5925-6425 MHz bands may operate the proposed station during the pendency of its application after the release of the public notice accepting the notification for filing that complies with paragraph (c)(2)(ii) of this section. The applicant, however, must first certify that the following conditions are satisfied:

(1) The frequency coordination procedures of §25.203 have been successfully completed;

(2) The antenna structure has been previously studied by the Federal Aviation Administration and determined to pose no hazard to aviation safety as required by subpart B of part 17 of this chapter; or the antenna or tower structure does not exceed 6.1 meters above ground level or above an existing man-made structure (other than an antenna structure), if the antenna or tower has not been previously studied by the Federal Aviation Administration and cleared by the FCC;

(3) The grant of the application(s) does not require a waiver of the Commission's rules (with the exception of a request for waiver pertaining to fees);

(4) The applicant has determined that the facility(ies) will not significantly affect the environment as defined in §1.1307 of this chapter after complying with any applicable environmental notification procedures specified in §17.4(c) of this chapter.

(5) The station site does not lie within 56.3 kilometers of any international border or within a radio “Quiet Zone” identified in §1.924 of this chapter; and

(6) The filed application is consistent with the proposal that was coordinated pursuant to §25.251.

(B) Conditional authority ceases immediately if the Schedule B is returned by the Commission because it is not accepted for filing.

(C) A conditional authorization pursuant to paragraphs (c)(2)(vi)(A) and (c)(2)(vi)(B) of this section is evidenced by retaining a copy of the Schedule B notification with the station records. Conditional authorization does not prejudice any action the Commission may take on the subject application(s) or the Schedule B notifications.

(D) Conditional authority is accepted with the express understanding that such authority may be modified or cancelled by the Commission at any time without hearing if, in the Commission's discretion, the need for such action arises. An applicant operating pursuant to this conditional authority assumes all risks associated with such operation, the termination or modification of the conditional authority, or the subsequent dismissal or denial of its application(s).

(E) The copy of the Schedule B notification form must be posted at each station operating pursuant to this section.

(vii) Period of construction. Construction of each earth station must be completed and the station must be brought into regular operation within twelve months from the date that action is taken to authorize that station to operate under the lead authorization, except as may be otherwise determined by the Commission for any particular application.

(3) Networks of earth stations operating in the 18.3-18.8 GHz, 19.7-20.2 GHz, 28.35-28.6 GHz, and 29.25-30 GHz bands with U.S.-licensed or non-U.S.-licensed satellites for domestic or international services.

(i) Applications to license networks of earth stations that will transmit digitally modulated signals to GSO space stations in the 28.35-28.6 GHz and/or 29.25-30.0 GHz bands under blanket operating authority must be filed on FCC Form 312, or Form 312EZ if available, with a Schedule B for each large (5 meters or larger) hub station antenna and each representative type of small antenna (less than 5 meters) operating within the network and may be routinely processed if the criteria in paragraphs (c)(3)(i)(A) and (B) of this section are met:

(A) The applicant certifies pursuant to §25.132(a)(1) that the off-axis gain of transmitting antennas in the network will not exceed the relevant levels specified in §25.209(a) and (b) and the power spectral density of any digitally modulated carrier into any transmitting earth station antenna in the proposed network will not exceed 3.5 dBW/MHz as specified in §25.212(e).

(B) The application includes information filed pursuant to paragraph (g)(1) of this section indicating that off-axis EIRP density from the proposed earth stations will not exceed relevant routine levels specified in §25.218(i).

(ii) Applications to license networks of earth stations operating in the 28.35-28.6 GHz and/or 29.25-30.0 GHz bands under blanket operating authority that do not meet the requirements of §25.212(e) or §25.218(i) must comply with the requirements in §25.220 and must be filed on FCC Form 312 with a Schedule B for each large (5 meters or larger) hub station antenna and each representative type of small antenna (less than 5 meters) operating within the network.

(d) Mobile-Satellite Service user transceivers need not be individually licensed. Service vendors may file blanket applications for such transceivers using FCC Form 312, Main Form and Schedule B, specifying the number of units to be covered by the blanket license. A blanket license application for 1.5/1.6 GHz MSS user transceivers must include an explanation of how the applicant will comply with the priority and preemptive access requirements in §25.287.

(e) GSO FSS earth stations in 17.8-30 GHz. (1) An application for a GSO FSS earth station license in the 17.8-19.4 GHz, 19.6-20.2 GHz, 27.5-29.1 GHz, or 29.25-30 GHz bands not filed on FCC Form 312EZ pursuant to paragraph (a)(2) of this section must be filed on FCC Form 312, Main Form and Schedule B, and must include any information required by paragraphs (a)(5) through (10) or (g) or (j) of this section.

(f) NGSO FSS earth stations in 10.7-30.0 GHz. (1) An application for an NGSO FSS earth station license in the 10.7-30.0 GHz band must include the certification described in §25.146(a)(2).

(2) Individual or blanket license applications may be filed for operation in the 10.7-12.7 GHz, 14-14.5 GHz, 17.8-18.6 GHz, 18.8-19.4 GHz, 19.6-20.2 GHz, 28.35-29.1 GHz, or 29.5-30.0 GHz bands; however, ESIMs cannot operate in the 28.35-28.4 GHz band and blanket licensing in the 10.7-11.7 GHz, 17.8-18.3 GHz, 19.3-19.4 GHz, and 19.6-19.7 GHz bands is on an unprotected basis with respect to current and future systems operating in the fixed service.

(3) Individual license applications only may be filed for operation in the 12.75-13.15 GHz, 13.2125-13.25 GHz, 13.75-14 GHz, or 27.5-28.35 GHz bands.

(g) Applications for earth stations that will transmit to GSO space stations in any portion of the 5850-6725 MHz, 13.75-14.5 GHz, 24.75-25.25 GHz, 28.35-28.6 GHz, or 29.25-30.0 GHz bands must include, in addition to the particulars of operation identified on FCC Form 312 and associated Schedule B, the information specified in either paragraph (g)(1) or (g)(2) of this section for each earth station antenna type.

(1) Specification of off-axis EIRP density calculated from measurements made consistent with the requirements in §25.132(b)(1), in accordance with the following requirements. For purposes of this rule, the “off-axis angle” is the angle in degrees from a line between an earth station antenna and the target satellite.

(i) A plot of maximum co-polarized EIRP density in the plane tangent to the GSO arc at off-axis angles from minus 180° to plus 180°;

(ii) A plot of maximum co-polarized EIRP density in the plane tangent to the GSO arc at off-axis angles from minus 10° to plus 10°;

(iii) A plot of maximum co-polarized EIRP density in the plane perpendicular to the GSO arc at off-axis angles from 0° to plus 30°;

(iv) A plot of maximum cross-polarized EIRP density in the plane tangent to the GSO arc at off-axis angles from minus 7° to plus 7°;

(v) A plot of maximum cross-polarized EIRP density in the plane perpendicular to the GSO arc at off-axis angles from minus 7° to plus 7°;

(vi) For antennas for which gain measurements are made pursuant to §25.132(b)(1)(iv), the EIRP density plots specified in paragraphs (g)(1)(i) through (v) of this section must be provided over the specified angular ranges in two orthogonal planes, one of which is tangent to the GSO arc and with the antenna operating at its maximum skew angle, which the applicant must specify.

(vii) The relevant off-axis EIRP density envelopes in §25.218 must be superimposed on plots submitted pursuant to paragraphs (g)(1)(i) through (vi) of this section.

(viii) The showing must include a supplemental table for each off-axis angular range in which the relevant EIRP density envelope will be exceeded, specifying angular coordinates in degrees off-axis and corresponding calculated off-axis EIRP density at 0.2° increments over the angular range in which the routine envelope will be exceeded and one degree on each side of that range.

(2) An applicant that certifies pursuant to §25.132(a)(1) that a proposed antenna's measured gain pattern conforms to relevant standards in §25.209(a) and (b) and that input power density to the antenna will not exceed the relevant limit in §25.211 or §25.212 need not provide a showing pursuant to paragraph (g)(1) of this section for operation with that antenna.

(h) [Reserved]

(i) An earth station applicant filing an application for a blanket-licensed earth station network made up of FSS earth stations and planning to use a contention protocol must include in its application a certification that its contention protocol usage will be reasonable.

(j) An application for a new fixed earth station or modification involving alteration of the overall height of one or more existing earth station antenna structures must include the FCC Antenna Structure Registration Number(s) for the antenna structure(s), if assigned. If no such number has been assigned, the application must state whether prior FAA notification is required by part 17 of this chapter and, if so, whether the applicant or owner of the structure has notified the FAA of the proposed construction or alteration and applied for an Antenna Structure Registration Number in accordance with part 17 of this chapter. Applicants who maintain that prior FAA notification is not required for construction or alteration of a structure with overall height more than 6.1 meters above ground level must explain in the application why such prior notification is not required.

(k)(1) Applicants for FSS earth stations that qualify for routine processing in the conventional or extended C-bands, the conventional or extended Ku-bands, the conventional Ka-band, or the 24.75-25.25 GHz band, including ESV applications filed pursuant to paragraph (m)(1) or (n)(1) of this section, VMES applications filed pursuant to paragraph (m)(1) or (n)(1) of this section, and ESAA applications filed pursuant to paragraph (m)(1) or (n)(1) of this section, may designate the Permitted Space Station List as a point of communication. Once such an application is granted, the earth station operator may communicate with any space station on the Permitted Space Station List, provided that the operation is consistent with the technical parameters and conditions in the earth station license and any limitations placed on the space station authorization or noted in the Permitted Space Station List.

(2) Notwithstanding paragraph (k)(1) of this section, an earth station that would receive signals in the 17.8-20.2 GHz band may not communicate with a space station on the Permitted Space Station List in that band until the space station operator has completed coordination under Footnote US334 to §2.106 of this chapter.

(l) The requirements of this paragraph apply to applications for ESV operation in the 5925-6425 MHz (Earth-to-space) band with GSO satellites in the Fixed-Satellite Service, in addition to the requirements in paragraphs (a)(1), (5), (6), and (i) of this section:

(1) Applications where any necessary frequency coordination has been satisfactorily completed, and the proposed earth station transmissions comport with the applicable provisions in §25.212(d) or the applicable off-axis EIRP density limits in §25.218(d) will be routinely processed. Such applications must include the relevant information specified by paragraph (g) of this section. Applicants for ESIMs operating in a network using variable power density control of earth stations transmitting simultaneously in shared frequencies to the same target satellite receiving beam must also provide the certification required by §25.212(g) or §25.218(d)(4), whichever is applicable.

(2) Applications where the proposed earth station transmissions do not comport with the applicable provisions in §25.212(d) or the applicable off-axis EIRP density limits in §25.218(d) must include the information specified by paragraph (g)(1) of this section, and are subject to the requirements of §25.220.

(3) Applications must include the following information:

(i) ESIM applicants that meet the relevant off-axis EIRP density mask must certify that an ESIM system is self-monitoring and capable of automatically ceasing or reducing emissions within 100 milliseconds if the ESIM transmitter exceeds the relevant off-axis EIRP density limits. ESIM applicants that do not meet the relevant off-axis EIRP density mask must provide a detailed showing that an ESIM system is self-monitoring and capable of automatically ceasing or reducing emissions within 100 milliseconds if the ESIM transmitter exceeds the relevant off-axis EIRP density limits. Variable-power ESIM applicants must certify that one or more transmitters are capable of automatically ceasing or reducing emissions within 100 milliseconds of receiving a command to do so from the system's network control and monitoring center, if the aggregate off axis EIRP densities of the transmitter or transmitters exceed the relevant off-axis EIRP density limits.

(ii) An exhibit describing the geographic area(s) in which the ESVs will operate.

(iii) The point of contact information referred to in §25.228(e)(2).

(iv) Applicants for ESVs that will exceed the guidelines in §1.1310 of this chapter for radio frequency radiation exposure must provide, with their environmental assessment, a plan for mitigation of radiation exposure to the extent required to meet those guidelines.

(m) The requirements of this paragraph apply to applications for ESIM operation in the 14.0-14.5 GHz (Earth-to-space) band with GSO satellites in the Fixed-Satellite Service, in addition to the requirements in paragraphs (a)(1) and (5) and (i) of this section:

(1) Applications where any necessary frequency coordination has been satisfactorily completed, and the proposed earth station transmissions comport with the applicable provisions in §25.212(c)(2) or the applicable off-axis EIRP density limits in §25.218(f) will be routinely processed. Such applications must include the relevant information specified by paragraph (g) of this section. Applicants for ESIMs operating in a network using variable power density control of earth stations transmitting simultaneously in shared frequencies to the same target satellite receiving beam must also provide the certification required by §25.212(g) or §25.218(f)(4), whichever is applicable.

(2) Applications where the proposed earth station transmissions do not comport with the applicable provisions in §25.212(c)(2) or the applicable off-axis EIRP density limits in §25.218(f) must include the information specified by paragraph (g)(1) of this section, and are subject to the requirements of §25.220.

(3) Applications must include the following information:

(i) ESIM applicants that meet the relevant off-axis EIRP density mask must certify that an ESIM system is self-monitoring and capable of automatically ceasing or reducing emissions within 100 milliseconds if the ESIM transmitter exceeds the relevant off-axis EIRP density limits. ESIM applicants that do not meet the relevant off-axis EIRP density mask must provide a detailed showing that an ESIM system is self-monitoring and capable of automatically ceasing or reducing emissions within 100 milliseconds if the ESIM transmitter exceeds the relevant off-axis EIRP density limits. Variable-power ESIM applicants must certify that one or more transmitters are capable of automatically ceasing or reducing emissions within 100 milliseconds of receiving a command to do so from the system's network control and monitoring center, if the aggregate off axis EIRP densities of the transmitter or transmitters exceed the relevant off-axis EIRP density limits.

(ii) An exhibit describing the geographic area(s) in which the ESIMs will operate.

(iii) The point of contact information referred to in §25.228(e)(2), (f), or (g)(1) as appropriate.

(iv) Applicants for ESIMs that will exceed the guidelines in §1.1310 of this chapter for radio frequency radiation exposure must provide, with their environmental assessment, a plan for mitigation of radiation exposure to the extent required to meet those guidelines.

(n) The requirements of this paragraph apply to applications for ESIM operation in the 28.35-28.6 GHz or 29.25-30.0 GHz (Earth-to-space) band with GSO satellites in the Fixed-Satellite Service, in addition to the requirements in paragraphs (a)(1) and (5) and (i) of this section:

(1) Applications where any necessary frequency coordination has been satisfactorily completed, and the proposed earth station transmissions comport with the applicable provisions in §25.212(e) or the applicable off-axis EIRP density limits in §25.218(i) will be routinely processed. Such applications must include the relevant information specified by paragraph (g) of this section. Applicants for ESIMs operating in a network using variable power density control of earth stations transmitting simultaneously in shared frequencies to the same target satellite receiving beam must also provide the certification required by §25.212(g) or §25.218(i)(5), whichever is applicable.

(2) Applications where the proposed earth station transmissions do not comport with the applicable provisions in §25.212(e) or the applicable off-axis EIRP density limits in §25.218(i) must include the information specified by paragraph (g)(1) of this section, and are subject to the requirements of §25.220.

(3) Applications must include the following information:

(i) ESIM applicants that meet the relevant off-axis EIRP density mask must certify that an ESIM system is self-monitoring and capable of automatically ceasing or reducing emissions within 100 milliseconds if the ESIM transmitter exceeds the relevant off-axis EIRP density limits. ESIM applicants that do not meet the relevant off-axis EIRP density mask must provide a detailed showing that an ESIM system is self-monitoring and capable of automatically ceasing or reducing emissions within 100 milliseconds if the ESIM transmitter exceeds the relevant off-axis EIRP density limits. Variable-power ESIM applicants must certify that one or more transmitters are capable of automatically ceasing or reducing emissions within 100 milliseconds of receiving a command to do so from the system's network control and monitoring center, if the aggregate off axis EIRP densities of the transmitter or transmitters exceed the relevant off-axis EIRP density limits.

(ii) An exhibit describing the geographic area(s) in which the ESIMs will operate.

(iii) The point of contact information referred to in §25.228(e)(2), (f), or (g)(1) as appropriate.

(iv) Applicants for ESIMs that will exceed the guidelines in §1.1310 of this chapter for radio frequency radiation exposure must provide, with their environmental assessment, a plan for mitigation of radiation exposure to the extent required to meet those guidelines.

(o) The requirements in this paragraph apply to applications for ESIMs operation with NGSO satellites in the Fixed-Satellite Service, in addition to the requirements in paragraphs (a)(1), (a)(5), and (i) of this section:

(1) An exhibit describing the geographic area(s) in which the ESIMs will operate and the location of hub and/or gateway stations.

(2) The point of contact information referred to in §25.228(e)(2), (f), or (g)(1) as appropriate.

(3) Applicants for ESIMs that will exceed the guidelines in §1.1310 of this chapter for radio frequency radiation exposure must provide, with their environmental assessment, a plan for mitigation of radiation exposure to the extent required to meet those guidelines.

(p) The licensee and grantees shall ensure compliance with the Commission's radio frequency exposure requirements in §§1.1307(b), 2.1091, and 2.1093 of this chapter, as appropriate. An Environmental Assessment may be required if RF radiation from the proposed facilities would, in combination with radiation from other sources, cause RF power density or field strength in an accessible area to exceed the applicable limits specified in §1.1310 of this chapter. See §1.1307(b)(5)(ii).

[62 FR 5928, Feb. 10, 1997]

Editorial Note 1.: For Federal Register citations affecting §25.115, see the List of CFR Sections Affected, which appears in the Finding Aids section of the printed volume and at www.govinfo.gov.

Editorial Note 2.: At 84 FR 53651, Oct. 8, 2019, §25.115 was amended in part by revising paragraph (c)(1); however, the amendment could not be incorporated because no new text was set out for paragraph (c)(1).

§25.116   Amendments to applications.

(a) Unless otherwise specified, any pending application may be amended until designated for hearing, a public notice is issued stating that a substantive disposition of the application is to be considered at a forthcoming Commission meeting, or a final order disposing of the matter is adopted by the Commission.

(b) Major amendments submitted pursuant to paragraph (a) of this section are subject to the public notice requirements of §25.151. An amendment will be deemed to be a major amendment under the following circumstances:

(1) If the amendment increases the potential for interference, or changes the proposed frequencies or orbital locations to be used.

(2) If the amendment would convert the proposal into an action that may have a significant environmental effect under §1.1307 of this chapter.

(3) [Reserved]

(4) If the amendment, or the cumulative effect of the amendment, is determined by the Commission otherwise to be substantial pursuant to section 309 of the Communications Act.

(5) Amendments to “defective” space station applications, within the meaning of §25.112 will not be considered.

(c) Any application for an NGSO-like satellite license within the meaning of §25.157 will be considered to be a newly filed application if it is amended by a major amendment (as defined by paragraph (b) of this section) after a “cut-off” date applicable to the application, except under the following circumstances:

(1) The amendment resolves frequency conflicts with authorized stations or other pending applications but does not create new or increased frequency conflicts;

(2) The amendment reflects only a change in ownership or control found by the Commission to be in the public interest and, for which a requested exemption from a “cut-off” date is granted;

(3) The amendment corrects typographical, transcription, or similar clerical errors which are clearly demonstrated to be mistakes by reference to other parts of the application, and whose discovery does not create new or increased frequency conflicts; or

(4) The amendment does not create new or increased frequency conflicts, and is demonstrably necessitated by events which the applicant could not have reasonably foreseen at the time of filing.

(d) Any application for a GSO-like satellite license within the meaning of §25.158 will be considered to be a newly filed application if it is amended by a major amendment (as defined by paragraph (b) of this section), and will cause the application to lose its status relative to later-filed applications in the “queue” as described in §25.158.

(e) Any amendment to an application shall be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter. Amendments to space station applications must be filed on Form 312 and Schedule S. Amendments to earth station applications must be filed on Form 312 and Schedule B.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51503, Aug. 27, 2003; 69 FR 47794, Aug. 6, 2004; 78 FR 8421, Feb. 6, 2013]

§25.117   Modification of station license.

Link to an amendment published at 85 FR 43733, July 20, 2020.

(a) Except as provided for in §25.118 (Modifications not requiring prior authorization), no modification of a radio station governed by this part which affects the parameters or terms and conditions of the station authorization shall be made except upon application to and grant of such application by the Commission.

(b) Both earth station and space station modification applications must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(c) Applications for modification of earth station authorizations must be submitted on FCC Form 312, Main Form and Schedule B. Applications for modification of space station authorizations must be submitted on FCC Form 312, Main Form and Schedule S. Only those items that change need to be specified, provided that the applicant certifies that the remaining information has not changed.

(d)(1) Except as set forth in §25.118(e), applications for modifications of space station authorizations shall be filed in accordance with §25.114, but only those items of information listed in §25.114 that change need to be submitted, provided the applicant certifies that the remaining information has not changed.

(2) Applications for modifications of space station authorizations will be granted except under the following circumstances:

(i) Granting the modification would make the applicant unqualified to operate a space station under the Commission's rules.

(ii) Granting the modification request would not serve the public interest, convenience, and necessity.

(iii) Except as set forth in paragraph (d)(2)(iv) of this section, applications for modifications of GSO-like space station authorizations granted pursuant to the procedure set forth in §25.158, which seek to relocate a GSO satellite or add a frequency band to the authorization, will be placed in a queue pursuant to §25.158 and considered only after previously filed space station license applications or space station modification applications have been considered.

(iv) Applications for modifications of space station authorizations to increase the authorized bandwidth will not be considered in cases in which the original space station authorization was granted pursuant to the procedures set forth in §25.157(e) or §25.158(c)(4).

(v) Any 17/24 GHz BSS space station operator whose license is conditioned to operate at less than the power level otherwise permitted by §25.208(c) and/or (w) of this part, and is conditioned to accept interference from a neighboring 17/24 GHz BSS space station, may file a modification application to remove those two conditions in the event that the license for that neighboring space station is cancelled or surrendered. In the event that two or more such modification applications are filed, and those applications are mutually exclusive, the modification applications will be considered on a first-come, first-served basis pursuant to the procedure set forth in §25.158 of this part.

(3) In the event that a space station licensee provides notification of a planned license modification pursuant to §25.118(e), and the Commission finds that the proposed modification does not meet the requirements of §25.118(e), the Commission will issue a public notice announcing that the proposed license modification will be considered pursuant to the procedure specified in paragraphs (d)(1) and (d)(2) of this section.

(e) Any application for modification of authorization to extend a required date of completion, as set forth in §25.133 for earth station authorizations or §25.164 for space stations, or included as a condition of any earth station or space station authorization, must include a verified statement from the applicant:

(1) That states that the additional time is required due to unforeseeable circumstances beyond the applicant's control, describes these circumstances with specificity, and justifies the precise extension period requested; or

(2) That states there are unique and overriding public interest concerns that justify an extension, identifies these interests and justifies a precise extension period (f) An application for modification of a space station license to add an ancillary terrestrial component to an eligible satellite network will be treated as a request for a minor modification if the particulars of operations provided by the applicant comply with the criteria specified in §25.149. Notwithstanding the treatment of such an application as a minor modification, the Commission shall place any initial application for the modification of a space station license to add an ancillary terrestrial component on notice for public comment. Except as provided for in §25.149(f), no application for authority to add an ancillary terrestrial component to an eligible satellite network shall be granted until the applicant has demonstrated actual compliance with the criteria specified in §25.149(b).

(g) The licensee and grantees shall ensure compliance with the Commission's radio frequency exposure requirements in §§1.1307(b), 2.1091, and 2.1093 of this chapter, as appropriate. An Environmental Assessment may be required if RF radiation from the proposed facilities would, in combination with radiation from other sources, cause RF power density or field strength in an accessible area to exceed the applicable limits specified in §1.1310 of this chapter. See §1.1307(b)(5)(iii).

(h) Unless otherwise ordered by the Commission, an application for any of the following kinds of modification of the operation of a GSO space station will be deemed granted 35 days after the date of the public notice that the application has been accepted for filing, provided no objection is filed during the 30-day notice period and the application does not propose a change that would be inconsistent with a Commission rule or require modification of the BSS plan in Appendix 30 or the associated feeder-link Plan in Appendix 30A of the ITU Radio Regulations (both incorporated by reference, see §25.108).

(1) Relocation of a DBS or GSO FSS space station by no more than 0.15° from the initially authorized orbital location, provided the application includes a signed certification that:

(i) The space station operator has assessed and limited the probability of the satellite becoming a source of debris as a result of collisions with large debris or other operational satellites at the new orbital location; and

(ii) The proposed station-keeping volume of the satellite following relocation will not overlap a station-keeping volume reasonably expected to be occupied by any other satellite, including those authorized by the Commission, applied for and pending before the Commission, or otherwise the subject of an ITU filing and either in orbit or progressing towards launch.

(2) Repositioning one or more antenna beams by no more than 0.3 angular degrees from a line between the space station and the initially authorized boresight location(s).

[56 FR 24016, May 28, 1991, as amended at 61 FR 9952, Mar. 12, 1996; 62 FR 5928, Feb. 10, 1997; 68 FR 33649, June 5, 2003; 68 FR 47858, Aug. 12, 2003; 68 FR 51503, Aug. 27, 2003; 68 FR 62248, Nov. 3, 2003; 68 FR 63998, Nov. 12, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005; 72 FR 60279, Oct. 24, 2007; 78 FR 8421, Feb. 6, 2013; 81 FR 55328, Aug. 18, 2016; 85 FR 18150, Apr. 1, 2020]

§25.118   Modifications not requiring prior authorization.

(a) Earth station modifications, notification required. Earth station licensees may make the following modifications without prior Commission authorization, provided they notify the Commission, using FCC Form 312 and Schedule B, within 30 days of the modification. The notification must be filed electronically through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter.

(1) Blanket-licensed earth station operators may add remote terminals operating on a primary basis without prior authorization, provided they have complied with all applicable frequency coordination procedures in accordance with §25.251.

(2) A licensee providing service on a private carrier basis may change its operations to common carrier status without obtaining prior Commission authorization. The licensee must notify the Commission using FCC Form 312 within 30 days after the completed change to common carrier status.

(3) An earth station operator may change a point of communication without prior authorization, provided the operator does not repoint the earth station's antenna beyond any coordinated range; and

(i) The change results from a space station relocation described in paragraph (e) of this section, or

(ii) The new point of communication is a replacement GSO space station within ±0.15° of orbital longitude of the same location, with authority to serve the U.S., and the change does not entail any increase in the earth station's EIRP or EIRP density.

(4) Licensees may make other changes to their authorized earth stations without prior authority from the Commission, provided the modification does not involve:

(i) An increase in EIRP or EIRP density (either main lobe or off-axis);

(ii) Additional operating frequencies;

(iii) A change in polarization;

(iv) An increase in antenna height;

(v) Antenna repointing beyond any coordinated range or

(vi) A change from the originally authorized coordinates of more than 1 second in latitude or longitude for stations operating in frequency bands shared with terrestrial systems or more than 10 seconds of latitude or longitude for stations operating in frequency bands not shared with terrestrial systems.

(b) Earth station modifications, notification not required. Notwithstanding paragraph (a) of this section, equipment in an authorized earth station may be replaced without prior authorization and without notifying the Commission if the new equipment is electrically identical to the existing equipment.

(c)-(d) [Reserved]

(e) Relocation of GSO space stations. A space station licensee may relocate a GSO space station without prior authorization, but upon 30 days prior notice to the Commission and any potentially affected licensed spectrum user, provided that the operator meets the following requirements. The notification must be filed electronically on FCC Form 312 through the International Bureau Filing System (IBFS) in accordance with the applicable provisions of part 1, subpart Y of this chapter:

(1) The space station will be relocated to a position within ±0.15° of an orbital location assigned to the same licensee.

(2) The licensee certifies that the space station will operate after the relocation within the technical parameters authorized and coordinated for the space station previously assigned to that location.

(3) The licensee certifies that it will comply with all the conditions of its license for operation at the changed location.

(4) The licensee certifies that it will limit operations of the space station to tracking, telemetry, and command functions during the relocation and satellite drift transition period.

(5) The licensee certifies that:

(i) It has assessed and limited the probability of the satellite becoming a source of debris as a result of collisions with large debris or other operational satellites at the new orbital location; and

(ii) The proposed station-keeping volume of the satellite following relocation will not overlap a station-keeping volume reasonably expected to be occupied by any other satellite, including those authorized by the Commission, applied for and pending before the Commission, or otherwise the subject of an ITU filing and either in orbit or progressing towards launch.

(6) The licensee certifies that the relocation will not result in a lapse of service for any current customer.

(7) If the space station to be relocated is a DBS space station, the licensee certifies that there will be no increase in interference due to the operations of the relocated space station that would require the Commission to submit a proposed modification to the ITU Appendix 30 Broadcasting-Satellite Service Plan and/or the Appendix 30A feeder-link Plan (both incorporated by reference, see §25.108) to the ITU Radiocommunication Bureau. A DBS licensee that meets this certification requirement is not subject to the requirements in paragraph (e)(2) of this section.

(8) If the space station to be relocated is a DBS space station, the licensee certifies that it will meet the geographic service requirements in §25.148(c) after the relocation.

(f) Repositioning of NGSO space stations. A licensee may reposition NGSO space stations within an authorized orbital plane without prior Commission approval, provided the licensee notifies the Commission of the repositioning 10 days in advance by electronic filing on Form 312 in the International Bureau Filing System. The notification must specify all changes in previously authorized parameters and must certify the following:

(1) The licensee will continue to comply with the conditions of the space station license and all applicable Commission rules, including geographic coverage requirements, after the repositioning;

(2) The repositioning will not increase risk of harmful interference to other systems not permitted by coordination agreements;

(3) The licensee will not request increased interference protection because of the repositioning;

(4) The licensee will monitor collision risk during the maneuver and take any necessary evasive measures.

(5) Any change of orbital altitude entailed by the repositioning will not exceed 10 kilometers in extent or 30 days in duration and the licensee has notified, or will notify, the operator(s) of any satellite within 20 kilometers of the interim orbit at least 10 days before commencing the repositioning maneuver.

[62 FR 5928, Feb. 10, 1997, as amended at 68 FR 62248, Nov. 3, 2003; 68 FR 63999, Nov. 12, 2003; 69 FR 47794, Aug. 6, 2004; 70 FR 32253, June 2, 2005; 79 FR 8317, Feb. 12, 2014; 81 FR 55329, Aug. 18, 2016]

§25.119   Assignment or transfer of control of station authorization.

(a) You must file an application for Commission authorization before you can transfer, assign, dispose of (voluntarily or involuntarily, directly or indirectly, or by transfer of control of any corporation or any other entity) your construction permit or station license, or accompanying rights, except as provided in paragraph (h) of this section. The Commission will grant your application only if it finds that doing so will serve the public interest, convenience, and necessity.

(b) For purposes of this section, transfers of control requiring Commission approval shall include any and all transactions that:

(1) Change the party controlling the affairs of the licensee, or

(2) Effect any change in a controlling interest in the ownership of the licensee, including changes in legal or equitable ownership.

(c) Assignment of license. You must submit an FCC Form 312, Main Form and Schedule A to voluntarily assign (e.g., as by contract or other agreement) or involuntarily assign (e.g., as by death, bankruptcy, or legal disability) your station authorization. You must file these forms electronically through IBFS.

(d) Transfer of control of corporation holding license. If you want to transfer control of a corporation, which holds one or more licenses voluntarily or involuntarily (de jure or de facto), you must submit an FCC Form 312, Main Form and Schedule A. You must file these forms electronically through IBFS. For involuntary transfers, you must file your application within 10 days of the event causing the transfer of control. You can also use FCC Form 312, Main Form and Schedule A for non-substantial (pro forma) transfers of control.

(e) Whenever a group of station licenses in the same radio service for the same class of facility licensed to the same entity is to be assigned or transferred to a single assignee or transferee, a single application may be filed to cover the entire group, if the application identifies in an exhibit each station by call sign, station location and expiration date of license.

(f) Assignments and transfers of control shall be completed within 180 days from the date of authorization. Within 30 days of consummation, the Commission shall be notified by letter of the date of consummation and the file numbers of the applications involved in the transaction.

(g) The Commission retains discretion in reviewing assignments and transfers of control of space station licenses to determine whether the initial license was obtained in good faith with the intent to construct a satellite system.

(h) Pro forma transactions involving a telecommunications carrier. You do not need prior Commission approval for a non-substantial (pro forma) transfer of control or assignment of license involving a telecommunications carrier, as defined in 47 U.S.C. 153(51). However, the pro forma transferee or assignee must file a notification with the Commission no later than 30 days after the transfer or assignment is completed. The notification must be filed on FCC Form 312, Main Form and Schedule A and must contain a certification that the transfer of control or assignment was pro forma and that, together with all previous pro forma transactions, it did not result in a change in the actual controlling party.

(i) Pro forma transactions not involving a telecommunications carrier. A complete application for Commission approval of a non-substantial (pro forma) transfer of control or assignment of license not involving a telecommunications carrier, as defined in 47 U.S.C. 153(51), will be deemed granted one business day after filing, provided that:

(1) Approval does not require a waiver of, or a declaratory ruling pertaining to, any applicable Commission rule; and

(2) The application includes a certification that the proposed transfer of control or assignment is pro forma and that, together with all previous pro forma transactions, it would not result in a change in the actual controlling party.

(j) Receive-only earth station registrations. You do not need prior Commission approval for a transfer of control or assignment of a receive-only earth station registration. For all such transactions other than non-substantial (pro forma) transfers of control, the transferee or assignee must file a notification with the Commission on FCC Form 312, Main Form and Schedule A no later than 30 days after the transfer or assignment is completed. No notification is required for a pro forma transfer of control of a receive-only earth station registrant.

[56 FR 24016, May 20, 1991; 56 FR 29757, June 20, 1991. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 68 FR 51503, Aug. 27, 2003; 69 FR 29901, May 26, 2004; 78 FR 8421, Feb. 6, 2013; 79 FR 51264, Aug. 28, 2014; 81 FR 55329, Aug. 18, 2016]

§25.120   Application for special temporary authorization.

(a) In circumstances requiring immediate or temporary use of facilities, request may be made for special temporary authority to install and/or operate new or modified equipment. The request must contain the full particulars of the proposed operation including all facts sufficient to justify the temporary authority sought and the public interest therein. No request for temporary authority will be considered unless it is received by the Commission at least 3 working days prior to the date of proposed construction or operation or, where an extension is sought, the expiration date of the existing temporary authorization. A request received within less than 3 working days may be accepted only upon due showing of extraordinary reasons for the delay in submitting the request which could not have been earlier foreseen by the applicant. A copy of the request for special temporary authority also shall be forwarded to the Commission's Columbia Operations Center, 9200 Farm House Lane, Columbia, MD 21046-1609.

(b)(1) The Commission may grant a temporary authorization only upon a finding that there are extraordinary circumstances requiring temporary operations in the public interest and that delay in the institution of these temporary operations would seriously prejudice the public interest. Convenience to the applicant, such as marketing considerations or meeting scheduled customer in-service dates, will not be deemed sufficient for this purpose.

(2) The Commission may grant a temporary authorization for a period not to exceed 180 days, with additional periods not exceeding 180 days, if the Commission has placed the special temporary authority (STA) request on public notice.

(3) The Commission may grant a temporary authorization for a period not to exceed 60 days, if the STA request has not been placed on public notice, and the applicant plans to file a request for regular authority for the service.

(4) The Commission may grant a temporary authorization for a period not to exceed 30 days, if the STA request has not been placed on public notice, and an application for regular authority is not contemplated.

(c) Each application proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antenna structures, where FAA notification prior to such construction or alteration is required by part 17 of this chapter, must include the FCC Antenna Structure Registration Number(s) for the affected satellite earth station antenna(s). If no such number has been assigned at the time the application(s) is filed, the applicant must state in the application whether the satellite earth station antenna owner has notified the FAA of the proposed construction or alteration and applied to the FCC for an Antenna Structure Registration Number in accordance with part 17 of this chapter. Applications proposing construction of one or more earth station antennas or alteration of the overall height of one or more existing earth station antennas, where FAA notification prior to such construction or alteration is not required by part 17 of this chapter, must indicate such and, unless the satellite earth station antenna is 6.10 meters or less above ground level (AGL), must contain a statement explaining why FAA notification is not required.

[56 FR 24016, May 28, 1991, as amended at 61 FR 4367, Feb. 6, 1996. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 66 FR 9973, Feb. 13, 2001; 68 FR 51503, Aug. 27, 2003]

§25.121   License term and renewals.

Link to an amendment published at 85 FR 43733, July 20, 2020.

(a) License Term. (1) Except for licenses for DBS space stations, SDARS space stations and terrestrial repeaters, and 17/24 GHz BSS space stations licensed as broadcast facilities, licenses for facilities governed by this part will be issued for a period of 15 years.

(2) Licenses for DBS space stations and 17/24 GHz BSS space stations licensed as broadcast facilities, and for SDARS space stations and terrestrial repeaters, will be issued for a period of 8 years. Licenses for DBS space stations not licensed as broadcast facilities will be issued for a period of 10 years.

(b) The Commission reserves the right to grant or renew station licenses for less than 15 years if, in its judgment, the public interest, convenience and necessity will be served by such action.

(c) For earth stations, the license term will be specified in the instrument of authorization.

(d) Space stations. (1) For geostationary-orbit space stations, the license term will begin at 3 a.m. Eastern Time on the date when the licensee notifies the Commission pursuant to §25.173(b) that the space station has been successfully placed into orbit at its assigned orbital location and that its operations conform to the terms and conditions of the space station authorization.

(2) For non-geostationary orbit space stations, the license period will begin at 3 a.m. Eastern Time on the date when the licensee notifies the Commission pursuant to §25.173(b) that operation of an initial space station is compliant with the license terms and conditions and that the space station has been placed in its authorized orbit. Operating authority for all space stations subsequently brought into service pursuant to the license will terminate upon its expiration.

(e) Renewal of licenses. Applications for renewals of earth station licenses must be submitted on FCC Form 312R no earlier than 90 days, and no later than 30 days, before the expiration date of the license. Applications for space station system replacement authorization for non-geostationary orbit satellites shall be filed no earlier than 90 days, and no later than 30 days, prior to the end of the twelfth year of the existing license term.

[56 FR 24016, May 28, 1991, as amended at 58 FR 68059, Dec. 23, 1993; 59 FR 53327, Oct. 21, 1994. Redesignated and amended at 62 FR 5928, 5929, Feb. 10, 1997; 65 FR 59142, Oct. 4, 2000; 67 FR 12485, Mar. 19, 2002; 67 FR 51113, Aug. 7, 2002; 68 FR 51503, Aug. 27, 2003; 68 FR 63999, Nov. 12, 2003; 72 FR 50027, Aug. 29, 2007; 75 FR 45067, Aug. 2, 2010; 79 FR 8317, Feb. 12, 2014]

§25.122   xxx

Link to an amendment published at 85 FR 43734, July 20, 2020.

§25.123   xxx

Link to an amendment published at 85 FR 43734, July 20, 2020.

§25.129   Equipment authorization for portable earth-station transceivers.

(a) Except as expressly permitted by §2.803 or §2.1204 of this chapter, prior authorization must be obtained pursuant to the equipment certification procedure in part 2, subpart J of this chapter for importation, sale or lease in the United States, or offer, shipment, or distribution for sale or lease in the United States of portable earth-station transceivers subject to regulation under part 25. This requirement does not apply, however, to devices imported, sold, leased, or offered, shipped, or distributed for sale or lease before November 20, 2004.

(b) For purposes of this section, an earth-station transceiver is portable if it is a “portable device” as defined in §2.1093(b) of this chapter, i.e., if its radiating structure(s) would be within 20 centimeters of the operator's body when the transceiver is in operation.

(c) In addition to the information required by §2.1033(c) of this chapter, applicants for certification required by this section shall submit any additional equipment test data necessary to demonstrate compliance with pertinent standards for transmitter performance prescribed in §§25.138, 25.202(f), 25.204, 25.209, and 25.216, must demonstrate compliance with the labeling requirement in §25.285(b), and shall ensure compliance with the Commission's radio frequency exposure requirements in §§1.1307(b), 2.1091, and 2.1093 of this chapter, as appropriate. An Environmental Assessment may be required if RF radiation from the proposed facilities would, in combination with radiation from other sources, cause RF power density or field strength in an accessible area to exceed the applicable limits specified in §1.1310 of this chapter. Applications for equipment authorization of mobile or portable devices operating under this section must contain a statement confirming compliance with these requirements. Technical information showing the basis for this statement must be submitted to the Commission upon request.

(d) Applicants for certification required by this section must submit evidence that the devices in question are designed for use with a satellite system that may lawfully provide service to users in the United States pursuant to an FCC license or order reserving spectrum.

[69 FR 5709, Feb. 6, 2004, as amended at 79 FR 8317, Feb. 12, 2014; 81 FR 55330, Aug. 18, 2016; 84 FR 53654, Oct. 8, 2019; 85 FR 18150, Apr. 1, 2020]