Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 6, 2020

Title 40Chapter ISubchapter CPart 63Subpart RRRRR → Subject Group


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart RRRRR—National Emission Standards for Hazardous Air Pollutants: Taconite Iron Ore Processing


General Compliance Requirements

§63.9610   What are my general requirements for complying with this subpart?

(a) On or before January 25, 2021, for affected sources that commenced construction or reconstruction on or before September 25, 2019, you must be in compliance with the requirements in paragraphs (a)(1) through (6) of this section at all times, except during periods of startup, shutdown, and malfunction. After January 25, 2021, for affected sources that commenced construction or reconstruction on or before September 25, 2019, and after July 28, 2020, for affected sources that commenced construction or reconstruction after September 25, 2019, you must be in compliance with the emission limitations, standards, and operation and maintenance requirements in this subpart at all times.

(1) The emission limitations in §63.9590.

(2) The work practice standards in §63.9591.

(3) The operation and maintenance requirements in §63.9600.

(4) The notification requirements in §63.9640.

(5) The reporting requirements in §63.9641.

(6) The recordkeeping requirements in §63.9642.

(b) During the period between the compliance date specified for your affected source in §63.9583 and the date upon which continuous monitoring systems have been installed and certified and any applicable operating limits have been set, you must maintain a log detailing the operation and maintenance of the process and emissions control equipment. This includes the daily monitoring and recordkeeping of air pollution control device operating parameters as specified in §63.9590(b).

(c) On or before January 25, 2021, for affected sources that commenced construction or reconstruction on or before September 25, 2019, you must develop a written startup, shutdown, and malfunction plan according to the provisions in §63.6(e)(3). For affected sources, a startup, shutdown, and malfunction plan is not required after January 25, 2021. No startup, shutdown, and malfunction plan is required for affected sources that commenced construction or reconstruction after September 25, 2019.

[68 FR 61888, Oct. 30, 2003, as amended at 71 FR 20470, Apr. 20, 2006; 85 FR 45492, July 28, 2020]