Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 6, 2020

Title 30Chapter IISubchapter BPart 250Subpart D → Subject Group


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations


Other Drilling Requirements

§250.460   What are the requirements for conducting a well test?

(a) If you intend to conduct a well test, you must include your projected plans for the test with your APD (form BSEE-0123) or in an Application for Permit to Modify (APM) (form BSEE-0124). Your plans must include at least the following information:

(1) Estimated flowing and shut-in tubing pressures;

(2) Estimated flow rates and cumulative volumes;

(3) Time duration of flow, buildup, and drawdown periods;

(4) Description and rating of surface and subsurface test equipment;

(5) Schematic drawing, showing the layout of test equipment;

(6) Description of safety equipment, including gas detectors and fire-fighting equipment;

(7) Proposed methods to handle or transport produced fluids; and

(8) Description of the test procedures.

(b) You must give the District Manager at least 24-hours notice before starting a well test.

§250.461   What are the requirements for directional and inclination surveys?

For this subpart, BSEE classifies a well as vertical if the calculated average of inclination readings does not exceed 3 degrees from the vertical.

(a) Survey requirements for a vertical well. (1) You must conduct inclination surveys on each vertical well and record the results. Survey intervals may not exceed 1,000 feet during the normal course of drilling;

(2) You must also conduct a directional survey that provides both inclination and azimuth, and digitally record the results in electronic format:

(i) Within 500 feet of setting surface or intermediate casing;

(ii) Within 500 feet of setting any liner; and

(iii) When you reach total depth.

(b) Survey requirements for a directional well. You must conduct directional surveys on each directional well and digitally record the results. Surveys must give both inclination and azimuth at intervals not to exceed 500 feet during the normal course of drilling. Intervals during angle-changing portions of the hole may not exceed 180 feet.

(c) Measurement while drilling. You may use measurement-while-drilling technology if it meets the requirements of this section.

(d) Composite survey requirements. (1) Your composite directional survey must show the interval from the bottom of the conductor casing to total depth. In the absence of conductor casing, the survey must show the interval from the bottom of the drive or structural casing to total depth; and

(2) You must correct all surveys to Universal-Transverse-Mercator-Grid-north or Lambert-Grid-north after making the magnetic-to-true-north correction. Surveys must show the magnetic and grid corrections used and include a listing of the directionally computed inclinations and azimuths.

(e) If you drill within 500 feet of an adjacent lease, the Regional Supervisor may require you to furnish a copy of the well's directional survey to the affected leaseholder. This could occur when the adjoining leaseholder requests a copy of the survey for the protection of correlative rights.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21975, May 15, 2019]

§250.462   What are the source control, containment, and collocated equipment requirements?

For drilling operations using a subsea BOP or surface BOP on a floating facility, you must have the ability to control or contain a blowout event at the sea floor.

(a) To determine your required source control and containment capabilities you must do the following:

(1) Consider a scenario of the wellbore fully evacuated to reservoir fluids, with no restrictions in the well.

(2) Evaluate the performance of the well as designed to determine if a full shut-in can be achieved without having reservoir fluids broach to the sea floor. If your evaluation indicates that the well can only be partially shut-in, then you must determine your ability to flow and capture the residual fluids to a surface production and storage system.

(b) You must have access to and the ability to deploy Source Control and Containment Equipment (SCCE) and all other necessary supporting and collocated equipment to regain control of the well. SCCE means the capping stack, cap-and-flow system, containment dome, and/or other subsea and surface devices, equipment, and vessels, which have the collective purpose to control a spill source and stop the flow of fluids into the environment or to contain fluids escaping into the environment based on the determinations outlined in paragraph (a) of this section. This SCCE, supporting equipment, and collocated equipment may include, but is not limited to, the following:

(1) Subsea containment and capture equipment, including containment domes and capping stacks;

(2) Subsea utility equipment including hydraulic power sources and hydrate control equipment;

(3) Collocated equipment including dispersant injection equipment;

(4) Riser systems;

(5) Remotely operated vehicles (ROVs);

(6) Capture vessels;

(7) Support vessels; and

(8) Storage facilities.

(c) You must submit a description of your source control and containment capabilities to the Regional Supervisor and receive approval before BSEE will approve your APD, Form BSEE-0123. The description of your containment capabilities must contain the following:

(1) Your source control and containment capabilities for controlling and containing a blowout event at the seafloor;

(2) A discussion of the determination required in paragraph (a) of this section; and

(3) Information showing that you have access to and the ability to deploy all equipment required by paragraph (b) of this section.

(d) You must contact the District Manager and Regional Supervisor for reevaluation of your source control and containment capabilities if your:

(1) Well design changes; or

(2) Approved source control and containment equipment is out of service.

(e) You must maintain, test, and inspect the source control, containment, and collocated equipment identified in the following table according to these requirements:

EquipmentRequirements, you must:Additional information
(1) Capping stacks,(i) Function test all pressure containing critical components on a quarterly frequency (not to exceed 104 days between tests),Pressure containing critical components are those components that will experience wellbore pressure during a shut-in after being functioned.
   (ii) Pressure test pressure containing critical components on a bi-annual basis, but not later than 210 days from the last pressure test. All pressure testing must be witnessed by BSEE (if available) and an independent third party.Pressure containing critical components are those components that will experience wellbore pressure during a shut-in. These components include, but are not limited to: All blind rams, wellhead connectors, and outlet valves.
   (iii) Notify BSEE at least 21 days prior to commencing any pressure testing
(2) Production safety systems used for flow and capture operations,(i) Meet or exceed the requirements set forth in Subpart H, excluding required equipment that would be installed below the wellhead or that is not applicable to the cap and flow system.
   (ii) Have all equipment unique to containment operations available for inspection at all times
(3) Subsea utility equipment,Have all equipment utilized solely for containment operations available for inspection at all timesSubsea utility equipment includes, but is not limited to: Hydraulic power sources, debris removal, and hydrate control equipment.
(4) Collocated equipment designated by the operator in the Regional Containment Demonstration (RCD) or Well Containment Plan (WCP),Have equipment available for inspection at all timesCollocated equipment includes, but is not limited to, dispersant injection equipment and other subsea control equipment.

[81 FR 26020, Apr. 29, 2016, as amended at 84 FR 21975, May 15, 2019]

§250.463   Who establishes field drilling rules?

(a) The District Manager may establish field drilling rules different from the requirements of this subpart when geological and engineering information shows that specific operating requirements are appropriate. You must comply with field drilling rules and nonconflicting requirements of this subpart. The District Manager may amend or cancel field drilling rules at any time.

(b) You may request the District Manager to establish, amend, or cancel field drilling rules.