Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 5, 2020

Title 30Chapter IISubchapter BPart 250Subpart D → Subject Group


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart D—Oil and Gas Drilling Operations


Diverter System Requirements

§250.430   When must I install a diverter system?

You must install a diverter system before you drill a conductor or surface hole. The diverter system consists of a diverter sealing element, diverter lines, and control systems. You must design, install, use, maintain, and test the diverter system to ensure proper diversion of gases, water, drilling fluid, and other materials away from facilities and personnel.

§250.431   What are the diverter design and installation requirements?

You must design and install your diverter system to:

(a) Use diverter spool outlets and diverter lines that have a nominal diameter of at least 10 inches for surface wellhead configurations and at least 12 inches for floating drilling operations;

(b) Use dual diverter lines arranged to provide for downwind diversion capability;

(c) Use at least two diverter control stations. One station must be on the drilling floor. The other station must be in a readily accessible location away from the drilling floor;

(d) Use only remote-controlled valves in the diverter lines. All valves in the diverter system must be full-opening. You may not install manual or butterfly valves in any part of the diverter system;

(e) Minimize the number of turns (only one 90-degree turn allowed for each line for bottom-founded drilling units) in the diverter lines, maximize the radius of curvature of turns, and target all right angles and sharp turns;

(f) Anchor and support the entire diverter system to prevent whipping and vibration; and

(g) Protect all diverter-control instruments and lines from possible damage by thrown or falling objects.

§250.432   How do I obtain a departure to diverter design and installation requirements?

The table below describes possible departures from the diverter requirements and the conditions required for each departure. To obtain one of these departures, you must have discussed the departure in your APD and received approval from the District Manager.

If you want a departure to:Then you must .  .  .
(a) Use flexible hose for diverter lines instead of rigid pipe,Use flexible hose that has integral end couplings.
(b) Use only one spool outlet for your diverter system,(1) Have branch lines that meet the minimum internal diameter requirements; and (2) Provide downwind diversion capability.
(c) Use a spool with an outlet with an internal diameter of less than 10 inches on a surface wellhead,Use a spool that has dual outlets with an internal diameter of at least 8 inches.
(d) Use a single diverter line for floating drilling operations on a dynamically positioned drillship,Maintain an appropriate vessel heading to provide for downwind diversion.

§250.433   What are the diverter actuation and testing requirements?

When you install the diverter system, you must actuate the diverter sealing element, diverter valves, and diverter-control systems and control stations. You must also flow-test the vent lines.

(a) For drilling operations with a surface wellhead configuration, you must actuate the diverter system at least once every 24-hour period after the initial test. After you have nippled up on conductor casing, you must pressure-test the diverter-sealing element and diverter valves to a minimum of 200 psi. While the diverter is installed, you must conduct subsequent pressure tests within 7 days after the previous test.

(b) For floating drilling operations with a subsea BOP stack, you must actuate the diverter system within 7 days after the previous actuation. For subsequent testing, you may partially actuate the diverter element and a flow test is not required.

(c) You must alternate actuations and tests between control stations.

[76 FR 64462, Oct. 18, 2011, as amended at 84 FR 21975, May 15, 2019]

§250.434   What are the recordkeeping requirements for diverter actuations and tests?

You must record the time, date, and results of all diverter actuations and tests in the driller's report. In addition, you must:

(a) Record the diverter pressure test on a pressure chart;

(b) Require your onsite representative to sign and date the pressure test chart;

(c) Identify the control station used during the test or actuation;

(d) Identify problems or irregularities observed during the testing or actuations and record actions taken to remedy the problems or irregularities; and

(e) Retain all pressure charts and reports pertaining to the diverter tests and actuations at the facility for the duration of drilling the well.

§§250.440-250.451   [Reserved]

§250.452   What are the real-time monitoring requirements for Arctic OCS exploratory drilling operations?

(a) When conducting exploratory drilling operations on the Arctic OCS, you must gather and monitor real-time data using an independent, automatic, and continuous monitoring system capable of recording, storing, and transmitting data regarding the following:

(1) The BOP control system;

(2) The well's fluid handling systems on the rig; and

(3) The well's downhole conditions as monitored by a downhole sensing system, when such a system is installed.

(b) During well operations, you must transmit the data identified in paragraph (a) of this section as they are gathered, barring unforeseeable or unpreventable interruptions in transmission, and have the capability to monitor the data onshore, using qualified personnel. Onshore personnel who monitor real-time data must have the capability to contact rig personnel during operations. After well operations, you must store the data at a designated location for recordkeeping purposes as required in §§250.740 and 250.741. You must provide BSEE with access to your real-time monitoring data onshore upon request.

[81 FR 46561, July 15, 2016]