Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of February 23, 2021

Title 7Subtitle BChapter XVIIPart 1780Subpart C → §1780.55


Title 7: Agriculture
PART 1780—WATER AND WASTE LOANS AND GRANTS
Subpart C—Planning, Designing, Bidding, Contracting, Constructing and Inspections


§1780.55   Preliminary engineering reports and environmental review documentation.

Preliminary engineering reports (PERs) must conform to customary professional standards. PER guidelines for water, sanitary sewer, solid waste, and storm sewer are available from the Agency. Environmental review documentation must comply with the environmental review requirements in accordance with 7 CFR part 1970.

[81 FR 11028, Mar. 2, 2016]

Need assistance?