Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of March 4, 2021

Title 7Subtitle BChapter XIVSubchapter BPart 1436 → §1436.12


Title 7: Agriculture
PART 1436—FARM STORAGE FACILITY LOAN PROGRAM REGULATIONS


§1436.12   Interest and fees.

(a) Loans will bear interest at the rate equivalent, as determined by CCC, to the rate of interest charged on Treasury securities of comparable term and maturity on the date the loan is initially approved.

(b) The interest rate for each loan will remain in effect for the term of the loan.

(c) Each borrower on a loan application must pay a non-refundable application fee in such amount determined appropriate by CCC; the fee will be not less than $100 per borrower. The loan application fee is determined based on the cost of the fees associated with the loan, including, but not limited to, the cost to CCC for lien searches, security filings, and credit reports.

(d) For sugar storage facility loans, paragraph (c) of this section does not apply.

[73 FR 41591, Aug. 18, 2009]

Need assistance?