Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of September 22, 2020

Title 48Chapter 1Subchapter GPart 45Subpart 45.6 → §45.606


Title 48: Federal Acquisition Regulations System
PART 45—GOVERNMENT PROPERTY
Subpart 45.6—Reporting, Reutilization, and Disposal


45.606   Contractor scrap procedures.

(a) The property administrator should, in coordination with the plant clearance officer, ensure that contractor scrap disposal processes, methods, and practices allow for effective, efficient, and proper disposition and are properly documented in the contractor's property management procedures.

(b) The property administrator should determine the extent to which separate disposal processing or physical segregation for different scrap types is or may be required. Such scrap may require physical segregation, unique disposal processing, or separate plant clearance reporting. For example, the scope of work may create scrap—

(1) Consisting of sensitive items;

(2) Containing hazardous materials or wastes;

(3) Contaminated with hazardous materials or wastes;

(4) That is classified or otherwise controlled;

(5) Containing precious or strategic metals; or

(6) That is dangerous to public health or safety.

(c) Absent contract terms and conditions to the contrary, the Government may abandon parts removed and replaced from property as a result of normal maintenance actions or removed from property as a result of the repair, maintenance, overhaul, or modification process.

[77 FR 12944, Mar. 2, 2012]

Need assistance?