Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of January 19, 2021

Title 48Chapter 1Subchapter DPart 25Subpart 25.6 → §25.604


Title 48: Federal Acquisition Regulations System
PART 25—FOREIGN ACQUISITION
Subpart 25.6— American Recovery and Reinvestment Act—Buy American Statute—Construction Materials


25.604   Preaward determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute.

Link to an amendment published at 86 FR 6189, Jan. 19, 2021.

(a) For any acquisition, an offeror may request from the contracting officer a determination concerning the inapplicability of section 1605 of the Recovery Act or the Buy American statute for specifically identified construction materials. The time for submitting the request is specified in the solicitation in paragraph (b) of either 52.225-22 or 52.225-24, whichever applies. The information and supporting data that must be included in the request are also specified in the solicitation in paragraphs (c) and (d) of either 52.225-21 or 52.225-23, whichever applies.

(b) Before award, the contracting officer must evaluate all requests based on the information provided and may supplement this information with other readily available information.

(c) Determination based on unreasonable cost of domestic construction material.

(1) Manufactured construction material. The contracting officer must compare the offered price of the contract using foreign manufactured construction material (i.e., any construction material not manufactured in the United States, or construction material consisting predominantly of iron or steel and the iron or steel is not produced in the United States) to the estimated price if all domestic manufactured construction material were used. If use of domestic manufactured construction material would increase the overall offered price of the contract by more than 25 percent, then the contracting officer shall determine that the cost of the domestic manufactured construction material is unreasonable.

(2) Unmanufactured construction material. The contracting officer must compare the cost of each foreign unmanufactured construction material to the cost of domestic unmanufactured construction material. If the cost of the domestic unmanufactured construction material exceeds the cost of the foreign unmanufactured construction material by more than 6 percent, then the contracting officer shall determine that the cost of the domestic unmanufactured construction material is unreasonable.

[74 FR 14626, Mar. 31, 2009, as amended at 75 FR 53166, Aug. 30, 2010; 79 FR 24209, Apr. 29, 2014]