Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 5, 2020

Title 47Chapter ISubchapter BPart 25Subpart B → §25.161


Title 47: Telecommunication
PART 25—SATELLITE COMMUNICATIONS
Subpart B—Applications and Licenses


§25.161   Automatic termination of station authorization.

A station authorization shall be automatically terminated in whole or in part without further notice to the licensee upon:

(a)(1) The failure to meet an applicable milestone specified in §25.164(a) or (b), if no authorized space station is functional in orbit;

(2) The failure to meet an applicable milestone specified in §25.164(b)(1) or (2), if at least one authorized space station is functional in an authorized orbit, which failure will result in the termination of authority for the space stations not in orbit as of the milestone date, but allow for technically identical replacements; or

(3) The failure to meet any other milestone or construction requirement imposed as a condition of authorization. In the case of a space station authorization when at least one authorized space station is functional in orbit, however, such termination will be with respect to only the authorization for any space stations not in orbit as of the milestone date.

(b) The expiration of the license term, unless, in the case of an earth station license, an application for renewal of the license has been filed with the Commission pursuant to §25.121(e) or, in the case of a space station license, an application for extension of the license term has been filed with the Commission; or

(c) The removal or modification of the facilities which renders the station not operational for more than 90 days, unless specific authority is requested.

(d) The failure to maintain 50 percent of the maximum number of NGSO space stations authorized for service following the 9-year milestone period as functional space stations in authorized orbits, which failure will result in the termination of authority for the space stations not in orbit as of the date of noncompliance, but allow for technically identical replacements.

[56 FR 24016, May 28, 1991, as amended at 68 FR 51507, Aug. 27, 2003; 78 FR 8425, Feb. 6, 2013; 79 FR 8320, Feb. 12, 2014; 82 FR 59985, Dec. 18, 2017]

Need assistance?