Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of October 22, 2020

Title 36Chapter IIPart 291 → §291.39


Title 36: Parks, Forests, and Public Property
PART 291—PALEONTOLOGICAL RESOURCES PRESERVATION


§291.39   Cost of response, restoration, and repair.

The cost of response, restoration, and repair of paleontological resources involved in a violation of prohibitions contained in this part or conditions of a permit issued pursuant to this part, shall be the sum of the costs incurred for response, investigation, assessment, emergency restoration, or repair work, plus those costs projected to be necessary to complete restoration and repair, which may include but need not be limited to the costs of:

(a) Reconstruction of the paleontological resource;

(b) Stabilization and/or salvage of the paleontological resource;

(c) Ground contour reconstruction and surface stabilization;

(d) Research necessary to carry out reconstruction or stabilization;

(e) Physical barriers or other protective devices or signs, necessitated by the disturbance of the paleontological resource, to protect it from further disturbance;

(f) Examination and analysis of the paleontological resource including recording remaining paleontological information, where necessitated by disturbance, in order to salvage remaining values which cannot be otherwise conserved;

(g) Storage, preparation, and curation;

(h) Site monitoring; and

(i) Preparation of reports relating to any of the above activities.

Need assistance?