e-CFR data is current as of March 1, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.933 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draws of the Seaboard System Railroad bridges, mile 72.6 near Poston and mile 107.2 near Pee Dee, need not be opened for the passage of vessels.