e-CFR data is current as of February 26, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.645 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draw of the Conrail Bridge, mile 1.48, is remotely operated, is required to operate a radiotelephone, and shall open on signal.
[USCG-2019-0120, 84 FR 64418, Nov. 22, 2019]