e-CFR data is current as of February 26, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.533 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draw of the Maine Central Railroad Bridge, mile 15.0, between Wiscasset and North Edgecombe, Maine, need not be opened for the passage of vessels. The draw of the Maine Central Railroad Bridge shall be returned to operable condition within six months after notification by the District Commander to do so.
[CGD01-97-128, 63 FR 18323, Apr. 15, 1998]