e-CFR data is current as of February 26, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.480 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draw of the S82 bridge, mile 7.1 at Grand Chenier, shall open on signal; except that, from 6 p.m. to 6 a.m. the draw shall open on signal if at least 4 hours notice is given. During the advance notice period, the draw will open on less than 4 hours notice for an emergency and will open on demand should a temporary surge in waterway traffic occur.
[CGD8-94-027, 60 FR 14221, Mar. 16, 1995]