e-CFR data is current as of March 1, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.361 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draws of the CSX Transportation Railroad bridges, miles 28.0 and 28.7, both at Bainbridge, shall open on signal if at least 15 days notice is given.