e-CFR data is current as of February 26, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.319 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
(a) The draw of the Sharpes Ferry (SR 40) bridge, mile 55.1 shall open on signal if at least three hours notice is given.
(b) The draw of the Moss Bluff (SR 464) bridge, mile 66.0, need not open for the passage of vessels.
(c) The draw of the Muclan Farms bridge, mile 63.9, need not open for the passage of vessels.
[CGD7-85-15, 50 FR 29672, July 22, 1985, as amended by CGD7-87-49, 52 FR 42649, Nov. 6, 1987; CGD07-02-008, 67 FR 50351, Aug. 2, 2002]