e-CFR data is current as of March 1, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.307 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draw of the FDOT Railroad Bridge, mile 5.3 at Miami, shall open on signal if at least 48-hour notice is given to CSX System Operating Headquarters (800) 232-0144.
[CGD07-03-088, 69 FR 9549, Mar. 1, 2004]