e-CFR data is current as of February 26, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.293 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draw of the 63rd Street Bridge, Indian Creek mile 4.0, at Miami Beach, shall open on signal except as follows:
(a) From 7 a.m. to 7 p.m., Monday through Friday except Federal holidays, the draw need open only on the hour and half-hour.
(b) From 7:10 a.m. to 9:55 a.m. and 4:05 p.m. to 6:59 p.m., Monday through Friday except Federal holidays, the draw need not open for the passage of vessels.
(c) In February of each year during the period seven days prior to the City of Miami Beach Yacht and Brokerage Show and the four days following the show, from 10 a.m. to 4 p.m., the bridge need not open except for 10 minutes at the top of the hour. At all other times the bridge shall operate on its normal schedule.
[USCG-2015-0940, 81 FR 36800, June 8, 2016]