e-CFR data is current as of February 23, 2021 |
Title 33 → Chapter I → Subchapter J → Part 117 → Subpart B → §117.1057 |
Title 33: Navigation and Navigable Waters
PART 117—DRAWBRIDGE OPERATION REGULATIONS
Subpart B—Specific Requirements
The draw of the Washington State highway bridge at Skamokawa need not be opened for the passage of vessels.
[CGD 82-025, 49 FR 17452, Apr. 24, 1984; 49 FR 43463, Oct. 29, 1984]