e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of March 26, 2020

Title 32Subtitle AChapter VSubchapter KPart 651Subpart B → §651.12


Title 32: National Defense
PART 651—ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2)
Subpart B—National Environmental Policy Act and the Decision Process


§651.12   Determining appropriate level of NEPA analysis.

(a) The flow chart shown in Figure 1 summarizes the process for determining documentation requirements, as follows:

eCFR graphic er29mr02.000.gif

View or download PDF

(1) If the proposed action qualifies as a CX (subpart D of this part), and the screening criteria are met (§651.29), the action can proceed. Some CXs require a REC.

(2) If the proposed action is adequately covered within an existing EA or EIS, a REC is prepared to that effect. The REC should state the applicable EA or EIS title and date, and identify where it may be reviewed (§651.19, Figure 3). The REC is then attached to the proponent's record copy of that EA or EIS.

(3) If the proposed action is within the general scope of an existing EA or EIS, but requires additional information, a supplement is prepared, considering the new, modified, or missing information. Existing documents are incorporated by reference and conclusions are published as either a FNSI or NOI to supplement the EIS.

(4) If the proposed action is not covered adequately in any existing EA or EIS, or is of a significantly larger scope than that described in the existing document, an EA is prepared, followed by either a FNSI or NOI to prepare an EIS. Initiation of an EIS may proceed without first preparing an EA, if deemed appropriate by the proponent.

(5) If the proposed action is not within the scope of any existing EA or EIS, then the proponent must begin the preparation of a new EA or EIS, as appropriate.

(b) The proponent of a proposed action may adopt appropriate environmental documents (EAs or EISs) prepared by another agency (40 CFR 1500.4(n) and 1506.3). In such cases, the proponent will document their use in a REC FNSI, or ROD.

Need assistance?