Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 6, 2020

Title 30Chapter IISubchapter BPart 250Subpart G → §250.735


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart G—Well Operations and Equipment


§250.735   What associated systems and related equipment must all BOP systems include?

All BOP systems must include the following associated systems and related equipment:

(a) An accumulator system (as specified in API Standard 53, incorporated by reference in §250.198). Your accumulator system must have the fluid volume capacity and appropriate pre-charge pressures in accordance with API Standard 53. If you supply the accumulator regulators by rig air and do not have a secondary source of pneumatic supply, you must equip the regulators with manual overrides or other devices to ensure capability of hydraulic operations if rig air is lost;

(b) An automatic backup to the primary accumulator-charging system. The power source must be independent from the power source for the primary accumulator-charging system. The independent power source must possess sufficient capability to close and hold closed all BOP components under MASP conditions as defined for the operation;

(c) At least two full BOP control stations. One station must be on the rig floor. You must locate the other station in a readily accessible location away from the rig floor;

(d) The choke line(s) installed above the bottom well-control ram;

(e) The kill line must be installed beneath at least one well-control ram, and may be installed below the bottom ram;

(f) A fill-up line above the uppermost BOP;

(g) Locking devices for all BOP sealing rams (i.e., blind shear rams, pipe rams and variable bore rams), as follows:

(1) For subsea BOPs, hydraulic locking devices must be installed on all sealing rams;

(2) For surface BOPs:

(i) Remotely-operated locking devices must be installed on blind shear rams no later than April 29, 2019;

(ii) Manual or remotely-operated locking devices must be installed on pipe rams and variable bore rams; and

(h) A wellhead assembly with a RWP that exceeds the maximum anticipated wellhead pressure.

[81 FR 26022, Apr. 29, 2016, as amended at 84 FR 21981, May 15, 2019]