Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We???ve made big changes to make the eCFR easier to use. Be sure to leave feedback using the Help button on the bottom right of each page!

e-CFR data is current as of August 5, 2020

Title 30Chapter IISubchapter BPart 250Subpart L → §250.1200


Title 30: Mineral Resources
PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF
Subpart L—Oil and Gas Production Measurement, Surface Commingling, and Security


§250.1200   Question index table.

The table in this section lists questions concerning Oil and Gas Production Measurement, Surface Commingling, and Security.

Frequently asked questionsCFR citation
1. What are the requirements for measuring liquid hydrocarbons?§250.1202(a)
2. What are the requirements for liquid hydrocarbon royalty meters?§250.1202(b)
3. What are the requirements for run tickets?§250.1202(c)
4. What are the requirements for liquid hydrocarbon royalty meter provings?§250.1202(d)
5. What are the requirements for calibrating a master meter used in royalty meter provings?§250.1202(e)
6. What are the requirements for calibrating mechanical-displacement provers and tank provers?§250.1202(f)
7. What correction factors must a lessee use when proving meters with a mechanical displacement prover, tank prover, or master meter?§250.1202(g)
8. What are the requirements for establishing and applying operating meter factors for liquid hydrocarbons?§250.1202(h)
9. Under what circumstances does a liquid hydrocarbon royalty meter need to be taken out of service, and what must a lessee do?§250.1202(i)
10. How must a lessee correct gross liquid hydrocarbon volumes to standard conditions?§250.1202(j)
11. What are the requirements for liquid hydrocarbon allocation meters?§250.1202(k)
12. What are the requirements for royalty and inventory tank facilities?§250.1202(l)
13. To which meters do BSEE requirements for gas measurement apply?§250.1203(a)
14. What are the requirements for measuring gas?§250.1203(b)
15. What are the requirements for gas meter calibrations?§250.1203(c)
16. What must a lessee do if a gas meter is out of calibration or malfunctioning?§250.1203(d)
17. What are the requirements when natural gas from a Federal lease is transferred to a gas plant before royalty determination?§250.1203(e)
18. What are the requirements for measuring gas lost or used on a lease?§250.1203(f)
19. What are the requirements for the surface commingling of production?§250.1204(a)
20. What are the requirements for a periodic well test used for allocation?§250.1204(b)
21. What are the requirements for site security?§250.1205(a)
22. What are the requirements for using seals?§250.1205(b)

Need assistance?