Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of November 19, 2020

Title 14Chapter ISubchapter GPart 121Subpart AA → §121.1119


Title 14: Aeronautics and Space
PART 121—OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS
Subpart AA—Continued Airworthiness and Safety Improvements


§121.1119   Fuel tank vent explosion protection.

(a) Applicability. This section applies to transport category, turbine-powered airplanes with a type certificate issued after January 1, 1958, that have:

(1) A maximum type-certificated passenger capacity of 30 or more; or

(2) A maximum payload capacity of 7,500 pounds or more.

(b) New production airplanes. No certificate holder may operate an airplane for which the State of Manufacture issued the original certificate of airworthiness or export airworthiness approval after August 23, 2018 unless means, approved by the Administrator, to prevent fuel tank explosions caused by propagation of flames from outside the fuel tank vents into the fuel tank vapor spaces are installed and operational.

[Docket FAA-2014-0500, Amdt. 121-375, 81 FR 41208, June 24, 2016]

Need assistance?