e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of February 25, 2020

Title 10Chapter IISubchapter DPart 429Subpart B → §429.34


Title 10: Energy
PART 429—CERTIFICATION, COMPLIANCE, AND ENFORCEMENT FOR CONSUMER PRODUCTS AND COMMERCIAL AND INDUSTRIAL EQUIPMENT
Subpart B—Certification


§429.34   Torchieres.

(a) Sampling plan for selection of units for testing. (1) The requirements of §429.11 are applicable to torchieres; and

(2) Reserved

(b) Certification reports. (1) The requirements of §429.12 are applicable to torchieres; and

(2) Pursuant to §429.12(b)(13), a certification report shall include the following additional product-specific information: A declaration that the basic model meets the applicable design requirement and the features that have been incorporated into the torchiere to meet the applicable design requirement (e.g., circuit breaker, fuse, ballast).

Need assistance?