Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

We invite you to try out our new beta eCFR site at https://ecfr.federalregister.gov. We have made big changes to make the eCFR easier to use. Be sure to leave feedback using the Feedback button on the bottom right of each page!

e-CFR data is current as of December 1, 2020

Title 48Chapter 24Subchapter C → Part 2414


Title 48: Federal Acquisition Regulations System


PART 2414—SEALED BIDDING


Contents

Subpart 2414.4—Opening of Bids and Award of Contracts

2414.404   Rejection of bids.
2414.404-1   Cancellation of invitations after opening.
2414.407   Mistakes in bids.
2414.407-3   Other mistakes disclosed before award.
2414.407-4   Mistakes after award.
2414.408   Award.
2414.408-70   Award when only one bid is received.

Authority: 40 U.S.C. 486(c); 41 U.S.C. 253; 42 U.S.C. 3535(d).

Source: 49 FR 7702, Mar. 1, 1984, unless otherwise noted.

return arrow Back to Top

Subpart 2414.4—Opening of Bids and Award of Contracts

return arrow Back to Top

2414.404   Rejection of bids.

return arrow Back to Top

2414.404-1   Cancellation of invitations after opening.

(c) Invitations may be cancelled and all bids rejected before award but after opening when the Head of the Contracting Activity, as described in subpart 2402.1, determines in writing that cancellation is appropriate and consistent with FAR 14.404-1.

[50 FR 46577, Nov. 8, 1985]

return arrow Back to Top

2414.407   Mistakes in bids.

return arrow Back to Top

2414.407-3   Other mistakes disclosed before award.

(e) The determination to allow a bidder to: Correct a mistake in bid discovered before award (other than obvious clerical errors); withdraw a bid; or, neither correct nor withdraw a bid shall be submitted to the Head of the Contracting Activity for approval.

[57 FR 59788, Dec. 15, 1992. Redesignated at 61 FR 19470, May 1, 1996]

return arrow Back to Top

2414.407-4   Mistakes after award.

(d) For determinations under FAR 14.407-4(b), the Head of the Contracting Activity will obtain the concurrence of legal counsel before notification to the Contractor. The Contracting Officer shall be notified promptly of action to be taken.

[61 FR 19470, May 1, 1996, as amended at 64 FR 46095, Aug. 23, 1999]

return arrow Back to Top

2414.408   Award.

return arrow Back to Top

2414.408-70   Award when only one bid is received.

When only one bid is received in response to an invitation for bids, such bid may be considered and accepted if the Contracting Officer makes a written determination that: (a) The specifications were clear and not unduly restrictive; (b) adequate competition was solicited and it could have been reasonably assumed that more than one bid would have been submitted; (c) the price is reasonable; and (d) the bid is otherwise in accordance with the invitation for bids. Such a determination shall be placed in the file.

[49 FR 7702, Mar. 1, 1984; 51 FR 7948, Mar. 7, 1986, as amended at 58 FR 49437, Sept. 23, 1993. Redesignated at 61 FR 19471, May 1, 1996]