e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of December 3, 2019

Title 40Chapter ISubchapter CPart 63Subpart PPPPP → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart PPPPP—National Emission Standards for Hazardous Air Pollutants for Engine Test Cells/Stands


Table 7 to Subpart PPPPP of Part 63—Applicability of General Provisions to Subpart PPPPP

As stated in 63.9365, you must comply with the General Provisions in §§63.1 through 63.15 that apply to you according to the following table:

Citation Subject Brief description Applies to subpart PPPPP
§63.1(a)(1)ApplicabilityGeneral applicability of the General ProvisionsYes. Additional terms defined in §63.9375.
§63.1(a)(2)-(4)ApplicabilityApplicability of source categoriesYes.
§63.1(a)(5)[Reserved]
§63.1(a)(6)-(7)ApplicabilityContact for source category information; extension of compliance through early reductionYes.
§63.1(a)(8)ApplicabilityEstablishment of State rules or programsNo. Refers to State programs.
§63.1(a)(9)[Reserved]
§63.1(a)(10)-(14)ApplicabilityExplanation of time periods, postmark deadlinesYes.
§63.1(b)(1)ApplicabilityInitial applicabilityYes. Subpart PPPPP clarifies applicability at §63.9285.
§63.1(b)(2)ApplicabilityTitle V operating permit-reference to part 70Yes. All major affected sources are required to obtain a Title V permit.
§63.1(b)(3)ApplicabilityRecord of applicability determinationYes.
§63.1(c)(1)ApplicabilityApplicability after standards are setYes. Subpart PPPPP clarifies the applicability of each paragraph of subpart A to sources subject to subpart PPPPP.
§63.1(c)(2)ApplicabilityTitle V permit requirement for area sourcesNo. Area sources are not subject to subpart PPPPP.
§63.1(c)(3)[Reserved]
§63.1(c)(4)ApplicabilityExtension of compliance for existing sourcesNo. Existing sources are not covered by the substantive control requirements of subpart PPPPP.
§63.1(c)(5)ApplicabilityNotification requirements for an area source becoming a major sourceYes.
§63.1(d)[Reserved]
§63.1(e)ApplicabilityApplicability of permit program before a relevant standard has been setYes.
§63.2DefinitionsDefinitions for Part 63 standardsYes. Additional definitions are specified in §63.9375.
§63.3Units and AbbreviationsUnits and abbreviations for Part 63 standardsYes.
§63.4Prohibited ActivitiesProhibited activities; compliance date; circumvention, severabilityYes.
§63.5(a)Construction/ReconstructionConstruction and reconstruction—applicabilityYes.
§63.5(b)(1)Construction/ReconstructionRequirements upon construction or reconstructionYes.
§63.5(b)(2)[Reserved].
§63.5(b)(3)Construction/ReconstructionApproval of constructionYes.
§63.5(b)(4)Construction/ReconstructionNotification of constructionYes.
§63.5(b)(5)Construction/ReconstructionComplianceYes.
§63.5(b)(6)Construction/ReconstructionAddition of equipmentYes.
§63.5(c)[Reserved]
§63.5(d)Construction/ReconstructionApplication for construction reconstructionYes.
§63.5(e)Construction/ReconstructionApproval of construction or reconstructionYes.
§63.5(f)Construction/ReconstructionApproval of construction or reconstruction based on prior State reviewYes.
§63.6(a)ApplicabilityApplicability of standards and monitoring requirementsYes.
§63.6(b)(1)-(2)Compliance Dates for New and Reconstructed SourcesStandards apply at effective date; 3 years after effective date; upon startup; 10 years after construction or reconstruction commences for 112(f)Yes.
§63.6(b)(3)Compliance Dates for New and Reconstructed SourcesCompliance dates for sources constructed or reconstructed before effective dateNo. Compliance is required by startup or effective date.
§63.6(b)(4)Compliance Dates for New and Reconstructed SourcesCompliance dates for sources also subject to §112(f) standardsYes.
§63.6(b)(5)Compliance Dates for New and Reconstructed SourcesNotificationYes.
§63.6(b)(6)[Reserved].
§63.6(b)(7)Compliance Dates for New and Reconstructed SourcesCompliance dates for new and reconstructed area sources that become majorYes.
§63.6(c)(1)-(2)Compliance Dates for Existing SourcesEffective date establishes compliance dateNo. Existing sources are not covered by the substantive control requirements of subpart PPPPP.
§63.6(c)(3)-(4)[Reserved].
§63.6(c)(5)Compliance Dates for Existing SourcesCompliance dates for existing area sources that becomes majorYes. If the area source become a major source by addition or reconstruction, the added or reconstructed portion will be subject to subpart PPPPP.
§63.6(d)[Reserved].
§63.6(e)(1)-(2)Operation and Maintenance RequirementsOperation and maintenanceYes. Except that you are not required to have an SSMP for control devices and associated monitoring equipment.
§63.6(e)(3)SSMP1.  Requirement for SSM and SSMP
2.  Content of SSMP.
Yes. You must develop an SSMP for each control device and associated monitoring equipment.
§63.6(f)(1)Compliance Except During SSMYou must comply with emission standards at all times except during SSM of control devices or associated monitoring equipmentYes, but you must comply with emission standards at all times except during SSM of control devices and associated monitoring equipment only.
§63.6(f)(2)-(3)Methods for Determining ComplianceCompliance based on performance test, operation and maintenance plans, records, inspectionYes.
§63.6(g)(1)-(3)Alternative StandardProcedures for getting an alternative standardYes.
§63.6(h)Opacity/Visible Emission (VE) StandardsRequirements for opacity/VE standardsNo. Subpart PPPPP does not establish opacity/VE standards and does not require continuous opacity monitoring systems (COMS).
§63.6(i)(1)-(14)Compliance ExtensionProcedures and criteria for Administrator to grant compliance extensionNo. Compliance extension provisions apply to existing sources, which do not have emission limitations in subpart PPPPP.
§63.6(j)Presidential Compliance ExemptionPresident may exempt source category from requirement to comply with ruleYes.
§63.7(a)(1)-(2)Performance Test DatesDates for conducting initial performance testing and other compliance demonstrations: Must conduct within 180 days after first subject to ruleYes.
§63.7(a)(3)Section 114 AuthorityAdministrator may require a performance test under CAA Section 114 at any timeYes.
§63.7(b)(1)Notification Performance TestMust notify Administrator 60 days before the testYes.
§63.7(b)(2)Notification of ReschedulingIf have to reschedule performance test, must notify Administrator 5 days before schedule date of rescheduled dateYes.
§63.7(c)Quality Assurance/Test Plan1.  Requirement to submit site-specific test plan 60 days before the test or on date Administrator agrees withYes.
   2.  Test plan approval proceduresYes.
   3.  Performance audit requirementsYes.
   4.  Internal and external QA procedures for testingYes.
§63.7(d)Testing FacilitiesRequirements for testing facilitiesYes.
§63.7(e)(1)Conditions for Conducting Performance TestsPerformance tests must be conducted under representative conditions; cannot conduct performance tests during SSM; not a violation to exceed standard during SSMYes.
§63.7(e)(2)Conditions for Conducting Performance TestsMust conduct according to rule and EPA test methods unless Administrator approves alternativeYes.
§63.7(e)(3)Test Run Duration1. Must have three test runs of at least 1 hour eachYes.
   2. Compliance is based on arithmetic mean of three runsYes.
   3. Conditions when data from an additional test run can be usedYes.
§63.7(e)(4)Other Performance TestingAdministrator may require other testing under section 114 of the CAAYes.
§63.7(f)Alternative Test MethodProcedures by which Administrator can grant approval to use an alternative test methodYes.
§63.7(g)Performance Test Data Analysis1. Must include raw data in performance test reportYes.
   2. Must submit performance test data 60 days after end of test with the Notification of Compliance StatusYes.
   3. Keep data for 5 yearsYes.
§63.7(h)Waiver of TestsProcedures for Administrator to waive performance testYes.
§63.8(a)(1)Applicability of Monitoring RequirementsSubject to all monitoring requirements in standardYes. Subpart PPPPP contains specific requirements for monitoring at §63.9325.
§63.8(a)(2)Performance SpecificationsPerformance Specifications in appendix B of part 60 applyYes.
§63.8(a)(3)[Reserved]
§63.8(a)(4)Monitoring with FlaresUnless your rule says otherwise, the requirements for flares in 63.11 applyNo. Subpart PPPPP does not have monitoring requirements for flares.
§63.8(b)(1)MonitoringMust conduct monitoring according to standard unless Administrator approves alternativeYes.
§63.8(b)(2)-(3)Multiple Effluents and Multiple Monitoring Systems1. Specific requirements for installing monitoring systemsYes.
   2. Must install on each effluent before it is combined and before it is released to the atmosphere unless Administrator approves otherwiseYes.
   3. If more than one monitoring system on an emission point, must report all monitoring system results, unless one monitoring system is a backupYes.
§63.8(c)(1)Monitoring System Operation and MaintenanceMaintain monitoring system in a manner consistent with good air pollution control practicesYes.
§63.8(c)(1)(i)Routine and predictable CMS malfunctions1. Keep parts for routine repairs of CMS readily available
2. Reporting requirements for SSM when action is described in SSMP
Yes.
   3.  Reporting requirements for SSM when action is described in SSMPYes.
§63.8(c)(1)(ii)SSM of CMS Not in SSMPReporting requirements for SSM of CMS when action is not described in SSMPYes.
§63.8(c)(1)(iii)Compliance with Operation and Maintenance Requirements1. How Administrator determines if source complying with operation and maintenance requirements
2. Review of source O&M procedures, records, manufacturer's instructions and recommendations, and inspection
Yes.
§63.8(c)(2)-(3)Monitoring System Installation1. Must install to get representative emission of parameter measurementsYes.
   2. Must verify operational status before or at performance testYes.
§63.8(c)(4)Continuous Monitoring System (CMS) Requirements1. CMS must be operating except during breakdown, out of control, repair, maintenance, and high-level calibration driftsNo. Follow specific requirements in §63.9335(a) and (b) of subpart PPPPP.
   2. COMS must have a minimum of one cycle of sampling and analysis for each successive 10-second period and one cycle of data recording for each successive 6-minute periodNo. Follow specific requirements in §63.9335(a) and (b) of subpart PPPP.
   3. CEMS must have a minimum of one cycle of operation for each successive 15-minute periodNo. Follow specific requirements in §63.9335(a) and (b) of subpart PPPPP.
§63.8(c)(5)COMS Minimum ProceduresCOMS minimum proceduresNo. Subpart PPPPP does not have opacity/VE standards.
§63.8(c)(6)-(8)CMS RequirementsZero and high-level calibration check requirements, out-of-control periodsYes. Except that PPPP does not require COMS.
§63.8(d)CMS Quality Control1. Requirements for CMS quality control, including calibration, etcYes.
   2. Must keep quality control plan on record for 5 years. Keep old versions for 5 years after revisionsYes.
§63.8(e)CMS Performance EvaluationNotification, performance evaluation test plan, reportsYes. Except for §63.8(e)(5)(ii), which applies to COMS.
§63.8(f)(1)-(5)Alternative Monitoring MethodProcedures for Administrator to approve alternative monitoringYes.
§63.8(f)(6)Alternative to Relative Accuracy TestProcedures for Administrator to approve alternative relative accuracy tests for CEMSYes.
§63.8(g)Data Reduction1. COMS 6-minute averages calculated over at least 36 evenly spaced data points
2. CEMS 1-hour averages computed over at least 4 equally spaced data points
Yes. Except that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §63.9340.
§63.8(g)(5)Data ReductionData that cannot be used in computing averages for CEMS and COMSNo. Specific language is located at §63.9335(a).
§63.9(a)Notification RequirementsApplicability and State delegationYes.
§63.9(b)(1)-(5)Initial Notifications1.  Submit notification subject 120 days after effective dateYes.
   2.  Notification of intent to construct/ reconstruct; notification of commencement of construct/ reconstruct; notification of startupYes.
   3.  Contents of eachYes.
§63.9(c)Request for Compliance ExtensionCan request if cannot comply by date or if installed BACT/LAERNo. Compliance extensions do not apply to new or reconstructed sources.
§63.9(d)Notification of Special Compliance Requirements for New SourceFor sources that commence construction between proposal and promulgation and want to comply 3 years after effective dateYes.
§63.9(e)Notification of Performance TestNotify Administrator 60 days priorNo. Subpart PPPPP does not require performance testing.
§63.9(f)Notification of Opacity/VE TestNotify Administrator 30 days priorNo. Subpart PPPPP does not have opacity/VE standards.
§63.9(g)(1)Additional Notifications when Using CMSNotification of performance evaluationYes.
§63.9(g)(2)Additional Notifications when Using CMSNotification of use of COMS dataNo. Subpart PPPPP does not contain opacity or VE standards.
§63.9(g)(3)Additional Notifications when Using CMSNotification that exceeded criterion for relative accuracyYes. If alternative is in use.
§63.9(h)(1)-(6)Notification of Compliance Status1. ContentsYes.
   2. Due 60 days after end of performance test or other compliance demonstration, except for opacity/VE, which are due 30 days afterYes.
   3. When to submit to Federal vs. State authorityYes.
§63.9(i)Adjustment of Submittal DeadlinesProcedures for Administrator to approve change in when notifications must be submittedYes.
§63.9(j)Change in Previous InformationMust submit within 15 days after the changeYes.
§63.10(a)Recordkeeping/Reporting1. Applies to all, unless compliance extensionYes.
   2. When to submit to Federal vs. State authorityYes.
   3. Procedures for owners of more than one sourceYes.
§63.10(b)(1)Recordkeeping/Reporting1. General requirementsYes.
   2. Keep all records readily availableYes.
   3. Keep for 5 yearsYes.
§63.10(b)(2)(i)-(v)Records Related to SSM1. Occurrence of each of operation (process equipment)Yes.
   2. Occurrence of each malfunction of air pollution equipmentYes.
   3. Maintenance on air pollution control equipmentYes.
   4. Actions during SSMYes.
   5. All information necessary to demonstrate conformance with the SSMPYes.
§63.10(b)(2)(vi)-(xi)CMS RecordsMalfunctions, inoperative, out of controlYes.
§63.10(b)(2)(xii)RecordsRecords when under waiverYes.
§63.10(b)(2)(xiii)RecordsRecords when using alternative to relative accuracy testYes.
§63.10(b)(2)(xiv)RecordsAll documentation supporting initial notification and notification of compliance statusYes.
§63.10(b)(3)RecordsApplicability determinationsYes.
§63.10(c)(1)-(6), (9)-(15)RecordsAdditional records for CEMSYes.
§63.10(c)(7)-(8)RecordsRecords of excess emissions and parameter monitoring exceedances for CMSNo. Specific language is located at §63.9355 of subpart PPPPP.
§63.10(d)(1)General Reporting RequirementsRequirement to reportYes.
§63.10(d)(2)Report of Performance Test ResultsWhen to submit to Federal or State authorityYes.
§63.10(d)(3)Reporting Opacity or VE ObservationsWhat to report and whenNo. Subpart PPPPP does not have opacity/VE standards.
§63.10(d)(4)Progress ReportsMust submit progress reports on schedule if under compliance extensionNo. Compliance extensions do not apply to new or reconstructed sources.
§63.10(d)(5)SSM ReportsContents and submissionYes.
§63.10(e)(1) and (2)(i)Additional CMS ReportsAdditional CMS reportsYes.
§63.10(e)(2)(ii)Additional CMS ReportsCOMS-related reportNo. Subpart PPPPP does not require COMS.
§63.10(e)(3)Additional CMS ReportsExcess emissions and parameter exceedances reportsNo. Specific language is located in §63.9350 of subpart PPPPP.
§63.10(e)(4)Additional CMS ReportsReporting COMS dataNo. Subpart PPPPP does not require COMS.
§63.10(f)Waiver for Recordkeeping/ReportingProcedures for Administrator to waiveYes.
§63.11Control Device RequirementsRequirements for flaresNo. Subpart PPPPP does not specify use of flares for compliance.
§63.12State Authority and DelegationsState authority to enforce standardsYes.
§63.13Addresses of State Air Pollution Control Offices and EPA Regional OfficesAddresses where reports, notifications, and requests are sentYes.
§63.14Incorporations by ReferenceTest methods incorporated by referenceYes. ASTM D 6522-00 and ANSI/ASME PTC 19.10-1981 (incorporated by reference-See §63.14).
§63.15Availability of Information and ConfidentialityPublic and confidential informationYes.

[68 FR 28785, May 27, 2003, as amended at 71 FR 20470, Apr. 20, 2006]

Need assistance?