e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of December 3, 2019

Title 40Chapter ISubchapter CPart 63Subpart EEEEEEE → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart EEEEEEE—National Emission Standards for Hazardous Air Pollutants: Gold Mine Ore Processing and Production Area Source Category


Table 1 to Subpart EEEEEEE of Part 63—Applicability of General Provisions to Subpart EEEEEE

As stated in §63.11650, you must comply with the applicable General Provisions requirements according to the following table

CitationSubjectApplies to
subpart EEEEEEE
Explanation
§63.1(a)(1), (a)(2), (a)(3), (a)(4), (a)(6), (a)(10)-(a)(12), (b)(1), (b)(3), (c)(1), (c)(2), (c)(5), (e)ApplicabilityYes
§63.1(a)(5), (a)(7)-(a)(9), (b)(2), (c)(3), (c)(4), (d)ReservedNo
§63.2DefinitionsYes
§63.3Units and AbbreviationsYes
§63.4Prohibited Activities and CircumventionYes
§63.5Preconstruction Review and Notification RequirementsYes
§63.6(a), (b)(1)-(b)(5), (b)(7), (c)(1), (c)(2), (c)(5), (e)(1)(iii), (f)(2), (f)(3), (g), (i), (j)Compliance with Standards and Maintenance RequirementsYes
§63.6(e)(1)(i) and (ii), (e)(3), and (f)(1)Startup, Shutdown and Malfunction Requirements (SSM)NoSubpart EEEEEEE standards apply at all times.
§63.6(h)(1), (h)(2), (h)(4),(h)(5)(i), (ii), (iii) and (v), (h)(6)-(h)(9)Compliance with Opacity and Visible Emission LimitsNoSubpart EEEEEEE does not contain opacity or visible emission limits.
§63.6(b)(6), (c)(3), (c)(4), (d), (e)(2), (e)(3)(ii), (h)(3), (h)(5)(iv)ReservedNo
§63.7, except (e)(1)Applicability and Performance Test DatesYes
§63.7(e)(1)Performance Testing Requirements Related to SSMNo
§63.8(a)(1), (b)(1), (f)(1)-(5), (g)Monitoring RequirementsYes
§63.8(a)(2), (a)(4), (b)(2)-(3), (c), (d), (e), (f)(6), (g)Continuous Monitoring SystemsYesExcept cross references to SSM requirements in §63.6(e)(1) and (3) do not apply.
§63.8(a)(3)[Reserved]No
§63.9(a), (b)(1), (b)(2)(i)-(v), (b)(4), (b)(5), (c), (d), (e), (g), (h)(1)-(h)(3), (h)(5), (h)(6), (i), (j)Notification RequirementsYes
§63.9(f)No
§63.9(b)(3), (h)(4)ReservedNo
§63.10(a), (b)(1), (b)(2)(vi)-(xiv), (b)(3), (c), (d)(1)-(4), (e), (f)Recordkeeping and Reporting RequirementsYes
§63.10(b)(2)(i)-(v), (d)(5)Recordkeeping/Reporting Associated with SSMNo
§63.10(c)(2)-(c)(4), (c)(9)ReservedNo
§63.11Control Device RequirementsNo
§63.12State Authority and DelegationsYes
§§63.13-63.16Addresses, Incorporation by Reference, Availability of Information, Performance Track ProvisionsYes

Need assistance?