Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

Electronic Code of Federal Regulations

e-CFR data is current as of July 10, 2020

Title 40Chapter ISubchapter CPart 63Subpart YYYY → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart YYYY—National Emission Standards for Hazardous Air Pollutants for Stationary Combustion Turbines


Table 7 to Subpart YYYY of Part 63—Applicability of General Provisions to Subpart YYYY

You must comply with the applicable General Provisions requirements:

CitationSubjectApplies to subpart YYYYExplanation
§63.1General applicability of the General ProvisionsYesAdditional terms defined in §63.6175.
§63.2DefinitionsYesAdditional terms defined in §63.6175.
§63.3Units and abbreviationsYes
§63.4Prohibited activitiesYes
§63.5Construction and reconstructionYes
§63.6(a)ApplicabilityYes
§63.6(b)(1)-(4)Compliance dates for new and reconstructed sourcesYes
§63.6(b)(5)NotificationYes
§63.6(b)(6)[Reserved]
§63.6(b)(7)Compliance dates for new and reconstructed area sources that become majorYes
§63.6(c)(1)-(2)Compliance dates for existing sourcesYes
§63.6(c)(3)-(4)[Reserved]
§63.6(c)(5)Compliance dates for existing area sources that become majorYes
§63.6(d)[Reserved]
§63.6(e)(1)(i)General duty to minimize emissionsYes before September 8, 2020.
No after September 8, 2020. See §63.6105 for general duty requirement.
§63.6(e)(1)(ii)Requirement to correct malfunctions ASAPYes before September 8, 2020.
No after September 8, 2020.
§63.6(e)(1)(iii)Operation and Maintenance RequirementsYes
§63.6(e)(2)[Reserved]
§63.6(e)(3)SSMPYes before September 8, 2020.
No after September 8, 2020.
§63.6(f)(1)Applicability of standards except during startup, shutdown, or malfunction (SSM)Yes before September 8, 2020.
No after September 8, 2020.
§63.6(f)(2)Methods for determining complianceYes
§63.6(f)(3)Finding of complianceYes
§63.6(g)(1)-(3)Use of alternative standardYes
§63.6(h)Opacity and visible emission standardsNoSubpart YYYY does not contain opacity or visible emission standards.
§63.6(i)Compliance extension procedures and criteriaYes
§63.6(j)Presidential compliance exemptionYes
§63.7(a)(1)-(2)Performance test datesYesSubpart YYYY contains performance test dates at §63.6110.
§63.7(a)(3)Section 114 authorityYes
§63.7(b)(1)Notification of performance testYes
§63.7(b)(2)Notification of reschedulingYes
§63.7(c)Quality assurance/test planYes
§63.7(d)Testing facilitiesYes
§63.7(e)(1)Conditions for conducting performance testsYes before September 8, 2020.
No after September 8, 2020.
§63.7(e)(2)Conduct of performance tests and reduction of dataYesSubpart YYYY specifies test methods at §63.6120.
§63.7(e)(3)Test run durationYes
§63.7(e)(4)Administrator may require other testing under section 114 of the CAAYes
§63.7(f)Alternative test method provisionsYes
§63.7(g)Performance test data analysis, recordkeeping, and reportingYes
§63.7(h)Waiver of testsYes
§63.8(a)(1)Applicability of monitoring requirementsYesSubpart YYYY contains specific requirements for monitoring at §63.6125.
§63.8(a)(2)Performance specificationsYes
§63.8(a)(3)[Reserved]
§63.8(a)(4)Monitoring for control devicesNo
§63.8(b)(1)MonitoringYes
§63.8(b)(2)-(3)Multiple effluents and multiple monitoring systemsYes
§63.8(c)(1)Monitoring system operation and maintenanceYes
§63.8(c)(1)(i)General duty to minimize emissions and CMS operationYes before September 8, 2020.
No after September 8, 2020.
§63.8(c)(1)(ii)Parts for repair of CMS readily availableYes
§63.8(c)(1)(iii)Requirement to develop SSM Plan for CMSYes before September 8, 2020.
No after September 8, 2020.
§63.8(c)(2)-(3)Monitoring system installationYes
§63.8(c)(4)Continuous monitoring system (CMS) requirementsYesExcept that subpart YYYY does not require continuous opacity monitoring systems (COMS).
§63.8(c)(5)COMS minimum proceduresNo
§63.8(c)(6)-(8)CMS requirementsYesExcept that subpart YYYY does not require COMS.
§63.8(d)(1)-(2)CMS quality controlYes
§63.8(d)(3)Written procedures for CMSYes before September 8, 2020.
No after September 8, 2020.
§63.8(e)CMS performance evaluationYesExcept for §63.8(e)(5)(ii), which applies to COMS.
§63.8(f)(1)-(5)Alternative monitoring methodYes
§63.8(f)(6)Alternative to relative accuracy testYes
§63.8(g)Data reductionYesExcept that provisions for COMS are not applicable. Averaging periods for demonstrating compliance are specified at §§63.6135 and 63.6140.
§63.9(a)Applicability and State delegation of notification requirementsYes
§63.9(b)(1)-(5)Initial notificationsYesExcept that §63.9(b)(3) is reserved.
§63.9(c)Request for compliance extensionYes
§63.9(d)Notification of special compliance requirements for new sourcesYes
§63.9(e)Notification of performance testYes
§63.9(f)Notification of visible emissions/opacity testNoSubpart YYYY does not contain opacity or VE standards.
§63.9(g)(1)Notification of performance evaluationYes
§63.9(g)(2)Notification of use of COMS dataNoSubpart YYYY does not contain opacity or VE standards.
§63.9(g)(3)Notification that criterion for alternative to relative accuracy test audit (RATA) is exceededYes
§63.9(h)Notification of compliance statusYesExcept that notifications for sources not conducting performance tests are due 30 days after completion of performance evaluations. §63.9(h)(4) is reserved.
§63.9(i)Adjustment of submittal deadlinesYes
§63.9(j)Change in previous informationYes
§63.10(a)Administrative provisions for recordkeeping and reportingYes
§63.10(b)(1)Record retentionYes
§63.10(b)(2)(i)Recordkeeping of occurrence and duration of startups and shutdownsYes before September 8, 2020.
No after September 8, 2020.
§63.10(b)(2)(ii)Recordkeeping of failures to meet a standardYes before September 8, 2020.
No after September 8, 2020. See §63.6155 for recordkeeping of (1) date, time and duration; (2) listing of affected source or equipment, and an estimate of the quantity of each regulated pollutant emitted over the standard; and (3) actions to minimize emissions and correct the failure.
§63.10(b)(2)(iii)Maintenance recordsYes
§63.10(b)(2)(iv)-(v)Records related to actions during SSMYes before September 8, 2020.
No after September 8, 2020.
§63.10(b)(2)(vi)-(xi)CMS recordsYes
§63.10(b)(2)(xii)Record when under waiverYes
§63.10(b)(2)(xiii)Records when using alternative to RATAYes
§63.10(b)(2)(xiv)Records of supporting documentationYes
§63.10(b)(3)Records of applicability determinationYes
§63.10(c)(1)-(14)Additional records for sources using CMSYesExcept that §63.10(c)(2)-(4) and (9) are reserved.
§63.10(c)(15)Use of SSM PlanYes before September 8, 2020.
No after September 8, 2020.
§63.10(d)(1)General reporting requirementsYes
§63.10(d)(2)Report of performance test resultsYes
§63.10(d)(3)Reporting opacity or VE observationsNoSubpart YYYY does not contain opacity or VE standards.
§63.10(d)(4)Progress reportsYes
§63.10(d)(5)Startup, shutdown, and malfunction reportsNo. After September 8, 2020, see 63.6150(a) for malfunction reporting requirements.
§63.10(e)(1) and (2)(i)Additional CMS reportsYes
§63.10(e)(2)(ii)COMS-related reportNoSubpart YYYY does not require COMS.
§63.10(e)(3)Excess emissions and parameter exceedances reportsYesAfter September 8, 2020 submitted with the compliance report through CEDRI according to §63.6150(a).
§63.10(e)(4)Reporting COMS dataNoSubpart YYYY does not require COMS.
§63.10(f)Waiver for recordkeeping and reportingYes
§63.11FlaresNo
§63.12State authority and delegationsYes
§63.13AddressesYesAfter September 8, 2020 not applicable to reports required to be submitted through CEDRI by 63.6150(c), (e), (f), or (g).
§63.14Incorporation by referenceYes
§63.15Availability of informationYes

[85 FR 13543, Mar. 9, 2020]

Need assistance?