e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of December 5, 2019

Title 40Chapter ISubchapter CPart 63Subpart VVVV → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart VVVV—National Emission Standards for Hazardous Air Pollutants for Boat Manufacturing


Table 7 to Subpart VVVV of Part 63—Applicability and Timing of Notifications

As specified in §63.5761(a), you must submit notifications according to the following table:

If your facility— You must submit— By this date—
1. Is an existing source subject to this subpartAn initial notification containing the information specified in §63.9(b)(2)No later than the dates specified in §63.9(b)(2).
2. Is a new source subject to this subpartThe notifications specified in §63.9(b) (3) to (5)No later than the dates specified §63.9(b)(4) and (5).
3. Qualifies for a compliance extension as specified in §63.9(c)A request for a compliance extension as specified in §63.9(c)No later than the dates specified in §63.6(i).
4. Is complying with organic HAP content limits, application equipment requirements; or MACT model point value averaging provisionsA notification of compliance status as specified in §63.9(h)No later than 30 calendar days after the end of the first 12-month averaging period after your facility's compliance date.
5. Is complying by using an add-on control devicea. notification of intent to conduct a performance test as specified in §63.9(e)No later than the date specified in §63.9(e).
   b. A notification of the date for the continuous monitoring system performance evaluation as specified in §63.9(g)With the notification of intent to conduct a performance test.
   c. A notification of compliance status as specified in §63.9(h)No later than 60 calendar days after the completion of the add-on control device performance test and continuous monitoring system performance evaluation.

Need assistance?