e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of January 16, 2020

Title 40Chapter ISubchapter CPart 63Subpart JJJJ → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart JJJJ—National Emission Standards for Hazardous Air Pollutants: Paper and Other Web Coating


Table 2 to Subpart JJJJ of Part 63—Applicability of 40 CFR Part 63 General Provisions to Subpart JJJJ

You must comply with the applicable General Provisions requirements according to the following table:

General provisions reference Applicable to subpart JJJJ Explanation
§63.1(a)(1)-(4)Yes.
§63.1(a)(5)NoReserved.
§63.1(a)(6)-(8)Yes.
§63.1(a)(9)NoReserved.
§63.1(a)(10)-(14)Yes.
§63.1(b)(1)NoSubpart JJJJ specifies applicability.
§63.1(b)(2)-(3)Yes.
§63.1(c)(1)Yes.
§63.1(c)(2)NoArea sources are not subject to emission standards of subpart JJJJ.
§63.1(c)(3)NoReserved.
§63.1(c)(4)Yes.
§63.1(c)(5)Yes.
§63.1(d)NoReserved.
§63.1(e)Yes.
§63.1(e)(4)No.
§63.2YesAdditional definitions in subpart JJJJ.
§63.3(a)-(c)Yes.
§63.4(a)(1)-(3)Yes.
§63.4(a)(4)NoReserved.
§63.4(a)(5)Yes.
§63.4(b)-(c)Yes.
§63.5(a)(1)-(2)Yes.
§63.5(b)(1)Yes.
§63.5(b)(2)NoReserved.
§63.5(b)(3)-(6)Yes.
§63.5(c)NoReserved.
§63.5(d)Yes.
§63.5(e)Yes.
§63.5(f)Yes.
§63.6(a)YesApplies only when capture and control system is used to comply with the standard.
§63.6(b)(1)-(5)No
§63.6(b)(6)NoReserved.
§63.6(b)(7)Yes.
§63.6(c)(1)-(2)Yes.
§63.6(c)(3)-(4)NoReserved.
§63.6(c)(5)Yes.
§63.6(d)NoReserved.
§63.6(e)YesProvisions pertaining to SSMP, and CMS do not apply unless an add-on control system is used to comply with the emission limitations.
§63.6(f)Yes.
§63.6(g)Yes.
§63.6(h)NoSubpart JJJJ does not require continuous opacity monitoring systems (COMS).
§63.6(i)(1)-(14)Yes.
§63.6(i)(15)NoReserved.
§63.6(i)(16)Yes.
§63.6(j)Yes.
§63.7Yes.
§63.8(a)(1)-(2)Yes.
§63.8(a)(3)NoReserved.
§63.8(a)(4)No.
§63.8(b)Yes.
§63.8(c)(1)-(3)Yes§63.8(c)(1)(i) & (ii) only apply if you use capture and control systems and are required to have a start-up, shutdown, and malfunction plan.
§63.8(c)(4)Yes.
§63.8(c)(5)NoSubpart JJJJ does not require COMS.
§63.8(c)(6)-(c)(8)YesProvisions for COMS are not applicable.
§63.8(d)-(f)Yes§63.8(f)(6) only applies if you use CEMS.
§63.8(g)YesOnly applies if you use CEMS.
§63.9(a)Yes.
§63.9(b)(1)Yes.
§63.9(b)(2)YesExcept §63.3400(b)(1) requires submittal of initial notification for existing affected sources no later than 1 year before compliance date.
§63.9(b)(3)-(5)Yes.
§63.9(c)-(e)Yes.
§63.9(f)NoSubpart JJJJ does not require opacity and visible emissions observations.
§63.9(g)YesProvisions for COMS are not applicable.
§63.9(h)(1)-(3)Yes.
§63.9(h)(4)NoReserved.
§63.9(h)(5)-(6)Yes.
§63.9(i)Yes.
§63.9(j)Yes.
§63.10(a)Yes.
§63.10(b)(1)-(3)Yes§63.10(b)(2)(i) through (v) only apply if you use a capture and control system.
§63.10(c)(1)Yes.
§63.10(c)(2)-(4)NoReserved.
§63.10(c)(5)-(8)Yes.
§63.10(c)(9)NoReserved.
§63.10(c)(10)-(15)Yes.
§63.10(d)(1)-(2)Yes.
§63.10(d)(3)NoSubpart JJJJ does not require opacity and visible emissions observations.
§63.10(d)(4)-(5)Yes.
§63.10(e)(1)-(2)YesProvisions for COMS are not applicable.
§63.10(e)(3)-(4)No.
§63.10(f)Yes.
§63.11No.
§63.12Yes.
§63.13Yes.
§63.14YesSubpart JJJJ includes provisions for alternative ASME test methods that are incorporated by reference.
§63.15Yes.

Need assistance?