Title 40Chapter ISubchapter CPart 63Subpart FFFF → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart FFFF—National Emission Standards for Hazardous Air Pollutants: Miscellaneous Organic Chemical Manufacturing


Table 12 to Subpart FFFF of Part 63—Applicability of General Provisions to Subpart FFFF

As specified in §63.2540, the parts of the General Provisions that apply to you are shown in the following table:

Citation Subject Explanation
§63.1ApplicabilityYes.
§63.2DefinitionsYes.
§63.3Units and AbbreviationsYes.
§63.4Prohibited ActivitiesYes.
§63.5Construction/ReconstructionYes.
§63.6(a)ApplicabilityYes.
§63.6(b)(1)-(4)Compliance Dates for New and Reconstructed sourcesYes.
§63.6(b)(5)NotificationYes.
§63.6(b)(6)[Reserved]
§63.6(b)(7)Compliance Dates for New and Reconstructed Area Sources That Become MajorYes.
§63.6(c)(1)-(2)Compliance Dates for Existing SourcesYes.
§63.6(c)(3)-(4)[Reserved]
§63.6(c)(5)Compliance Dates for Existing Area Sources That Become MajorYes
§63.6(d)[Reserved]
§63.6(e)(1)-(2)Operation & MaintenanceYes.
§63.6(e)(3)(i), (ii), and (v) through (viii)Startup, Shutdown, Malfunction Plan (SSMP)Yes, except information regarding Group 2 emission points and equipment leaks is not required in the SSMP, as specified in §63.2525(j).
§63.6(e)(3)(iii) and (iv)Recordkeeping and Reporting During SSMNo, §63.998(d)(3) and 63.998(c)(1)(ii)(D) through (G) specify the recordkeeping requirement for SSM events, and §63.2520(e)(4) specifies reporting requirements.
§63.6(e)(3)(ix)SSMP incorporation into title V permitYes.
§63.6(f)(1)Compliance Except During SSMYes.
§63.6(f)(2)-(3)Methods for Determining ComplianceYes.
§63.6(g)(1)-(3)Alternative StandardYes.
§63.6(h)Opacity/Visible Emission (VE) StandardsOnly for flares for which Method 22 observations are required as part of a flare compliance assessment.
§63.6(i)(1)-(14)Compliance ExtensionYes.
§63.6(j)Presidential Compliance ExemptionYes.
§63.7(a)(1)-(2)Performance Test DatesYes, except substitute 150 days for 180 days.
§63.7(a)(3)Section 114 AuthorityYes, and this paragraph also applies to flare compliance assessments as specified under §63.997(b)(2).
§63.7(b)(1)Notification of Performance TestYes.
§63.7(b)(2)Notification of ReschedulingYes.
§63.7(c)Quality Assurance/Test PlanYes, except the test plan must be submitted with the notification of the performance test if the control device controls batch process vents.
§63.7(d)Testing FacilitiesYes.
§63.7(e)(1)Conditions for Conducting Performance TestsYes, except that performance tests for batch process vents must be conducted under worst-case conditions as specified in §63.2460.
§63.7(e)(2)Conditions for Conducting Performance TestsYes.
§63.7(e)(3)Test Run DurationYes.
§63.7(f)Alternative Test MethodYes.
§63.7(g)Performance Test Data AnalysisYes.
§63.7(h)Waiver of TestsYes.
§63.8(a)(1)Applicability of Monitoring RequirementsYes.
§63.8(a)(2)Performance SpecificationsYes.
§63.8(a)(3)[Reserved]
§63.8(a)(4)Monitoring with FlaresYes.
§63.8(b)(1)MonitoringYes.
§63.8(b)(2)-(3)Multiple Effluents and Multiple Monitoring SystemsYes.
§63.8(c)(1)Monitoring System Operation and MaintenanceYes.
§63.8(c)(1)(i)Routine and Predictable SSMYes.
§63.8(c)(1)(ii)SSM not in SSMPYes.
§63.8(c)(1)(iii)Compliance with Operation and Maintenance RequirementsYes.
§63.8(c)(2)-(3)Monitoring System InstallationYes.
§63.8(c)(4)CMS RequirementsOnly for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of part 63. Requirements for COMS do not apply because subpart FFFF does not require continuous opacity monitoring systems (COMS).
§63.8(c)(4)(i)COMS Measurement and Recording FrequencyNo; subpart FFFF does not require COMS.
§63.8(c)(4)(ii)CEMS Measurement and Recording FrequencyYes.
§63.8(c)(5)COMS Minimum ProceduresNo. Subpart FFFF does not contain opacity or VE limits.
§63.8(c)(6)CMS RequirementsOnly for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part 63. Requirements for COMS do not apply because subpart FFFF does not require COMS.
§63.8(c)(7)-(8)CMS RequirementsOnly for CEMS. Requirements for CPMS are specified in referenced subparts G and SS of part 63. Requirements for COMS do not apply because subpart FFFF does not require COMS.
§63.8(d)CMS Quality ControlOnly for CEMS.
§63.8(e)CMS Performance EvaluationOnly for CEMS. Section 63.8(e)(5)(ii) does not apply because subpart FFFF does not require COMS.
§63.8(f)(1)-(5)Alternative Monitoring MethodYes, except you may also request approval using the precompliance report.
§63.8(f)(6)Alternative to Relative Accuracy TestOnly applicable when using CEMS to demonstrate compliance, including the alternative standard in §63.2505.
§63.8(g)(1)-(4)Data ReductionOnly when using CEMS, including for the alternative standard in §63.2505, except that the requirements for COMS do not apply because subpart FFFF has no opacity or VE limits, and §63.8(g)(2) does not apply because data reduction requirements for CEMS are specified in §63.2450(j).
§63.8(g)(5)Data ReductionNo. Requirements for CEMS are specified in §63.2450(j). Requirements for CPMS are specified in referenced subparts G and SS of this part 63.
§63.9(a)Notification RequirementsYes.
§63.9(b)(1)-(5)Initial NotificationsYes.
§63.9(c)Request for Compliance ExtensionYes.
§63.9(d)Notification of Special Compliance Requirements for New SourceYes.
§63.9(e)Notification of Performance TestYes.
§63.9(f)Notification of VE/Opacity TestNo. Subpart FFFF does not contain opacity or VE limits.
§63.9(g)Additional Notifications When Using CMSOnly for CEMS. Section 63.9(g)(2) does not apply because subpart FFFF does not require COMS.
63.9(h)(1)-(6)Notification of Compliance StatusYes, except subpart FFFF has no opacity or VE limits, and 63.9(h)(2)(i)(A) through (G) and (ii) do not apply because 63.2520(d) specifies the required contents and due date of the notification of compliance status report.
§63.9(i)Adjustment of Submittal DeadlinesYes.
§63.9(j)Change in Previous InformationNo, §63.2520(e) specifies reporting requirements for process changes.
§63.10(a)Recordkeeping/ReportingYes.
§63.10(b)(1)Recordkeeping/ReportingYes.
§63.10(b)(2)(i)-(ii), (iv), (v)Records related to SSMNo, §§63.998(d)(3) and 63.998(c)(1)(ii)(D) through (G) specify recordkeeping requirements for periods of SSM.
§63.10(b)(2)(iii)Records related to maintenance of air pollution control equipmentYes.
§63.10(b)(2)(vi), (x), and (xi)CMS RecordsOnly for CEMS; requirements for CPMS are specified in referenced subparts G and SS of this part 63.
§63.10(b)(2)(vii)-(ix)RecordsYes.
§63.10(b)(2)(xii)RecordsYes.
§63.10(b)(2)(xiii)RecordsOnly for CEMS.
§63.10(b)(2)(xiv)RecordsYes.
§63.10(b)(3)RecordsYes.
§63.10(c)(1)-(6),(9)-(15)RecordsOnly for CEMS. Recordkeeping requirements for CPMS are specified in referenced subparts G and SS of this part 63.
§63.10(c)(7)-(8)RecordsNo. Recordkeeping requirements are specified in §63.2525.
§63.10(d)(1)General Reporting RequirementsYes.
§63.10(d)(2)Report of Performance Test ResultsYes.
§63.10(d)(3)Reporting Opacity or VE ObservationsNo. Subpart FFFF does not contain opacity or VE limits.
§63.10(d)(4)Progress ReportsYes.
§63.10(d)(5)(i)Periodic Startup, Shutdown, and Malfunction ReportsNo, §63.2520(e)(4) and (5) specify the SSM reporting requirements.
§63.10(d)(5)(ii)Immediate SSM ReportsNo.
§63.10(e)(1)Additional CEMS ReportsYes.
§63.10(e)(2)(i)Additional CMS ReportsOnly for CEMS.
§63.10(e)(2)(ii)Additional COMS ReportsNo. Subpart FFFF does not require COMS.
§63.10(e)(3)ReportsNo. Reporting requirements are specified in §63.2520.
§63.10(e)(3)(i)-(iii)ReportsNo. Reporting requirements are specified in §63.2520.
§63.10(e)(3)(iv)-(v)Excess Emissions ReportsNo. Reporting requirements are specified in §63.2520.
§63.10(e)(3)(iv)-(v)Excess Emissions ReportsNo. Reporting requirements are specified in §63.2520.
§63.10(e)(3)(vi)-(viii)Excess Emissions Report and Summary ReportNo. Reporting requirements are specified in §63.2520.
§63.10(e)(4)Reporting COMS dataNo. Subpart FFFF does not contain opacity or VE limits.
§63.10(f)Waiver for Recordkeeping/ReportingYes.
§63.11Control device requirements for flares and work practice requirements for equipment leaksYes.
§63.12DelegationYes.
§63.13AddressesYes.
§63.14Incorporation by ReferenceYes.
§63.15Availability of InformationYes.

[68 FR 63888, Nov. 10, 2003, as amended at 70 FR 38561, July 1, 2005; 71 FR 20463, Apr. 20, 2006; 71 FR 40341, July 14, 2006; 73 FR 72816, Dec. 22, 2008]