e-CFR banner

Home
gpo.gov
govinfo.gov

e-CFR Navigation Aids

Browse

Simple Search

Advanced Search

 — Boolean

 — Proximity

 

Search History

Search Tips

Corrections

Latest Updates

User Info

FAQs

Agency List

Incorporation By Reference

eCFR logo

Related Resources

 

Electronic Code of Federal Regulations

e-CFR data is current as of December 10, 2019

Title 40Chapter ISubchapter CPart 63Subpart VVV → Appendix


Title 40: Protection of Environment
PART 63—NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED)
Subpart VVV—National Emission Standards for Hazardous Air Pollutants: Publicly Owned Treatment Works


Table 2 to Subpart VVV of Part 63—Compliance Dates and Requirements

If the construction/reconstruction date isThen the owner or operator must comply withAnd the owner or operator must achieve compliance
Group 1 POTW:
(1) After December 27, 2016(i) New source requirements in §§63.1583(b); 63.1586(b) or (c); and 63.1588 through 63.1591Upon initial startup.
(2) After December 1, 1998 but on or before December 27, 2016(i) New source requirements in §63.1583(b) but instead of complying with both requirements (industrial user(s) NESHAP and the POTW standards in §§63.1586(b) or (c)), you must comply with the most stringent requirement1Upon initial startup through October 26, 2020.
   (ii) New source requirements in §§63.1586(b) or (c); and 63.1588 through 63.1591On or before October 26, 2020.
(3) On or before December 1, 1998(i) Existing source requirements in §§63.1583(a)By the compliance date specified in the other applicable NESHAP.
   (ii) Existing source requirements in §§63.1588 through 63.1591On or before October 26, 2018.
Group 2 POTW:
(4) After December 27, 2016(i) New source requirements in §§63.1586(b) or (c); and 63.1588 through 63.1591Upon initial startup.
(5) After December 1, 1998 but on or before December 27, 2016(i) New source requirements in §63.1586(b) or (c)1Upon initial startup through October 26, 2020.
   (ii) New source requirements in §§63.1586(b) or (c); and 63.1588 through 63.1591On or before October 26, 2020.
(6) On or before December 1, 1998(i) Existing source requirements in §§63.1586(a); and 63.1591(a)On or before October 26, 2018.

1Note: This represents the new source requirements in the original 1999 NESHAP, which are applicable until October 26, 2020. Between October 26, 2017 and October 26, 2020, you must transition to the new requirements in Table 2 (2)(ii) and (5)(ii) for Group 1 and Group 2 POTW, respectively.

Need assistance?